Loading...
HomeMy WebLinkAboutPeters Construction - CO #1 - Hangar No. 4 Mold Remediation - 4.15.2024CHANGE ORDER NO. 1 Owner: Waterloo Regional Airport, City of Waterloo, Iowa Project: Hangar No. 4 (Mold Remediation) Owner's Contract No. FAA AIP Project No. 3-19-0094-048 (CARES) Contractor: Peters Construction Corporation Date of Contract Start: February 5, 2024 Date; March 20, 2024 You are directed to make the following changes in he Contract Documents. Description: ITEM NO. DESCRIPTION UNIT UNIT BID PRICE CHANGE ORDER NO. 1 CHANGE ORDER AMOUNT 6 DRYWALL REPLACEMENT SF $ 15.58 -253.0 $ (3,941.74) 8 DRYWALL REMOVAL ONLY SF $ 12.11 1,489.0 $ 18,031.79 TOTALS $ 14,090.05 Reason for Change Order: Item 6 — Quantity adjusted based on field measurements. Item 8 — Quantity added based on field conditions requiring additional drywall removal. ALO FAA AIP 3-19-0094-048 CO-1 Project No — 60675091 1 CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 98,942,10 Original: Previous C,O.s (DEDUCT):$ 0.00 Previous C.O.s (ADD): This C.O. (ADD): $ 14,090.05 This C.O. (ADD): Contract Price with all REVISED: approved Change Orders: $ 113,032.15 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: ---- Engineer (Authorized Signature) APPROVED: By: Quertarz rrE Owner (Authorized Signature) ACCEPTED: By: y ,•.,J{`1� L 1 Contractor (Authorized Signature) Di60ALLV SIGNED March 21, 2024 Date 4/15/2024 Date Date ALO FAA AIP 3-19-0094-048 CO-1 Project No -- 60675091 2