HomeMy WebLinkAboutPeters Construction - CO #2 - WCC Restroom Reno - 4.15.2024AI®
Document G701`-2017
Change Order
PROJECT: (Name and address)
5 Sullivan Brothers Convention Center -
Restroum Renovation
233 W 4th Street
Waterloo, IA 50701
OWNER: (Name and address)
City of Waterloo
715 Mulberry Street
Waterloo, IA 50703
CONTRACT INFORMATION:
Contract For: General Construction
Date:
ARCHITECT: (Name and address)
I&S Group, Inc. (ISO)
314 East 4th Street
Waterloo, CA 50703
CHANGE ORDER INFORMATION:
Change Order Number: 002
Date: March 22, 2024
CONTRACTOR: (Name and address)
Peters Construction Corporation
901 Black Hawk Road
Waterloo, IA 50701
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments
attributable to executed Construction Change Directives)
A. CR 2: Cost of labor and materials to add furring to 2nd floor womens restroom
ADD $1,440.00
B. RFT #8 and CR 5: Credit for salvaging existing doorframe and hardware for mens restroom (RR #A1)
DEDUCT ($535.00)
TOTAL ADD $905.00
REDUCE SPECIFIED GENERAL ALLOWANCE FROM $30,000.00 TO $29,095.00.
CONTRACT SUM REMAINS UNCHANGED.
The original Contract Suro was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
The Contract Time will be increased by Zero (0) days.
The new date of Substantial Completion will be the same
995,697.00
6,038.00
$ 1,001,735.00
0.00
$ 1,001,735.00
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
I&S Group, Inc. (ISG) Peters Construction Corporation
ARCHITECT (Firm name) CONTRACTOR (Firm name)
SIGNATURE SIGNATURE
Nathan Compton, Project Manager Bradley Best, President
PRINTED NAME AND TITLE
March 22 2024
DATE DATE
PRINTED NAME AND TITLE
City of Waterloo
OWNER (Firm name)
Ottetziia9r 1
SIGNATURE
Quentin Hart, Mayor
PRINTED NAME AND TITLE
4/15/2024
DATE
AIA Document G701 — 2017. Copyright ® 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects,' 'American Institute of
Architects," "AIA,` the AIA Logo, and `AIA Contract Documents' are trademarks of The American Institute of Architects. This document was produced at 15:55:56
ET on 03/22/2024 under Order No.3104238596 which expires on 0511512024, is not for resale, is licensed for one•Ilme use only, and may only be used In
accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail doclnto@aiacontracis.com.
User Notes: (399ADA54)