Loading...
HomeMy WebLinkAboutPeters Construction - CO #2 - WCC Restroom Reno - 4.15.2024AI® Document G701`-2017 Change Order PROJECT: (Name and address) 5 Sullivan Brothers Convention Center - Restroum Renovation 233 W 4th Street Waterloo, IA 50701 OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Date: ARCHITECT: (Name and address) I&S Group, Inc. (ISO) 314 East 4th Street Waterloo, CA 50703 CHANGE ORDER INFORMATION: Change Order Number: 002 Date: March 22, 2024 CONTRACTOR: (Name and address) Peters Construction Corporation 901 Black Hawk Road Waterloo, IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) A. CR 2: Cost of labor and materials to add furring to 2nd floor womens restroom ADD $1,440.00 B. RFT #8 and CR 5: Credit for salvaging existing doorframe and hardware for mens restroom (RR #A1) DEDUCT ($535.00) TOTAL ADD $905.00 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $30,000.00 TO $29,095.00. CONTRACT SUM REMAINS UNCHANGED. The original Contract Suro was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be the same 995,697.00 6,038.00 $ 1,001,735.00 0.00 $ 1,001,735.00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. I&S Group, Inc. (ISG) Peters Construction Corporation ARCHITECT (Firm name) CONTRACTOR (Firm name) SIGNATURE SIGNATURE Nathan Compton, Project Manager Bradley Best, President PRINTED NAME AND TITLE March 22 2024 DATE DATE PRINTED NAME AND TITLE City of Waterloo OWNER (Firm name) Ottetziia9r 1 SIGNATURE Quentin Hart, Mayor PRINTED NAME AND TITLE 4/15/2024 DATE AIA Document G701 — 2017. Copyright ® 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects,' 'American Institute of Architects," "AIA,` the AIA Logo, and `AIA Contract Documents' are trademarks of The American Institute of Architects. This document was produced at 15:55:56 ET on 03/22/2024 under Order No.3104238596 which expires on 0511512024, is not for resale, is licensed for one•Ilme use only, and may only be used In accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail doclnto@aiacontracis.com. User Notes: (399ADA54) ED