HomeMy WebLinkAboutEntrust - SA #1 - Cont. No. 1088 - 4.29.2024ADDENDUM NO. 1
TO THE
EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA — PROJECT MANAGEMENT,
CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT
SERVICES 2024
CITY OF WATERLOO, IOWA
DATE: April 3, 2024
The following is a revision to the EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO
IA — PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION
INSPECTION AND ENGINEERING SUPPORT SERVICES 2024:
o Per the agreement, there will be one (1) Construction Inspector for every four (4)
construction crews.
o The current number of crews to the number of inspectors has a ratio of 7:1,
which requires one (1) additional Construction Inspector to be added to the
monthly pricing schedule.
o This additional Construction Inspector will be billed at $21,400 per month, from
April through December 2024.
o An additional $2,000 per month will be added to cover the estimated monthly
travel expenses (will be billed as incurred on a not -to -exceed basis) for this
inspector.
Any revisions to any of the Contract Documents made by this Addendum shall be
considered as the same revision to any and all related areas of the Contract Documents not
specifically called out in this Addendum.
�/I. ITi J tarTli DIGITALLY
SIGNED
Quentin Hart
Mayor of Waterloo, Iowa
City of Waterloo
eer,„_„
David Kl i mas
Chief Operating Officer
EN Engineering, LLC
CJ
DIGITALLY
SIGNED
Eric Lage
General Manager of Telecommunications
Waterloo Fiber
Page 1 of 1