Loading...
HomeMy WebLinkAboutPeters Construction - CO #3 - WCC Restroom Reno - 5.6.2024AIA Document G7O1 - 2017 Change Order PROJECT: (Name and address) 5 Sullivan Brothers Convention Center - Restroom Renovation CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Contract For: General Construction Change Order Number: 003 233 W 4th Street Date: Date: March 29, 2024 Waterloo, IA 50701 OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 ARCHITECT: (Name and address) I&S Group, Inc. (ISG) 314 East 4th Street Waterloo, IA 50703 CONTRACTOR: (Name and address) Peters Construction Corporation 901 Black Hawk Road Waterloo, IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) CR 3: Cost of labor, equipment, and supervision to repair waterline until permanent fix requested ADD $908.66 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $29,095.00 TO $28,186.34. CONTRACT SUM REMAINS UNCHANGED. The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be the same 995,697.00 6,038.00 $ 1,001,735.00 $ 0.00 $ 1,001,735.00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. [&S Group, Inc. (ISG) ARCHITECT (Firm name) SIGNATURE Nathan Compton, Project Manager PRINTED NAME AND TITLE March 29, 2024 DATE Peters Construction Corporation CONTACTOR (Finn name) SIGNATURE Bradley Best, President PRINTED NAME AND TITLE 3VI)2'� DAT City of Waterloo OWNER (Firm name) Quen-an 9rr LI(IA, SIGNED SIGNATURE Quentin Hart, Mayor PRINTED NAME AND TITLE 5/6/2024 DATE AIA Document G701 — 2017. Copyright n 1979, taw, 2000 , 2001 and 2017. All rights reserved. 'The American Institute of Architects,' `American Institute of Architects,' "AIA," the AIA Logo, and "ALA Contract Documents' are trademarks of The American Institute of Architects. This document was produced at 11:59:08 ET on 03/29/2024 under Order No.3104238596 which expires on 05/1512024, is not for resale, Is licensed for one-time use only, and may only be used In accordance with the AIA Contract Documentsm Terms of Service. To report copyright violations, e-mail docinfo©alacontracts.com. User Notes: (3139ADA58)