Loading...
HomeMy WebLinkAboutFY25 Sidewalk Repair Zone 4 Notice to Property OwnersTHE COURIER AFFIDAVIT OF PUBLICATION Waterloo -Cedar Falls Courier 6915 Chancellor Drive Cedar Falls 50613 (319) 291-1400 State of Florida, County of Orange, ss: Laquansay Nickson Watkins, being first duly sworn, deposes and says: That (s)he is a duly authorized signatory of Column Software, PBC, duly authorized agent of Waterloo -Cedar Falls Courier, a publication that is a "legal newspaper" as that phrase is defined for the city of Cedar Falls, for the County of Black Hawk, in the state of Iowa, that this affidavit is Page 1 of 2 with the full text of the sworn - to notice set forth on the pages that follow, and that the attachment hereto contains the correct copy of what was published in said legal newspaper in consecutive issues on the following dates: PUBLICATION DATES: Apr. 4, 2024, Apr. 11, 2024 NOTICE ID: XSVD6F3NWLogPRzaCoS5 PUBLISHER ID: COL-IA-600066 NOTICE NAME: Waterloo Sidewalk Repair Notice Publication Fee: $150.26 rr '' II 1\ • , (Signed) VERIFICATION State of Florida County of Orange PAMELA BAEZ Notary Public - State of Florida Commission # HH 186700 Subscribed in my presence and sworn to before me on this: 04/11/202 O Notary Public Notarized remotely online using communication technology via 4 roof. FY 2025 SIDEWALK REPAIR PROGRAM — ZONE 4 0f11 F IRPNS' a BEM, r FGS Aprl15, 2024 You are receiving this notice because the City of Waterloo EngineeringDepartment a stall have found sidewalk butting your property that la In need of repair. The city Is divided Into twelve (12( sidewalk and Inspected on atwelve (12) year zones and years Inspected area is Zone 4 and Is bounded by :West Mullen Avenue - Cedar River - West 181h Street - Willis- ton Avenue -West 61h Street - Washington Street -West Mullen Avenue. The sidewalk panels that need repair have been marked 'kith one o1 the following symbols, White paint circle — single sidewalk panel replacement White"X"— a sidewalk panel that may need N be replaced because o1 possible tree roots. White "F"— a sidewalk panel that can be repaired r• requreda sidewalk repairs are also shown on the enclosed Sidewalk Inspec- tion Report w11h the type of defect(s) ex- plained on the back of that report and a sidewalk repair cost estimate prepared by the Engineering Department. This 1e an estimate of repair cost and not a proposed assessmentY ou may use this estimate to compare with quotes you may receive from private contractors It has been the City's experience that the repair cast may beless if the property owner contracts the repairs 'stead of having them done through the Sidewalk Repair Assessment Program. Property owners can voluntarily make the repairs to their sidewalks that must meet current city sidewalk specifications or hire contractor to make the repairs A cur- rent Right -at -Way bond Is needed to get a rm peit. You can contact the Waterloo City Engineer's office to determine if a tractor has a rent Right-of-way bond. The permit Is needed before making the repairs by the person making the repairs and can be purchased for $40,00 at the Citys Engineering Dept. Monday through Friday between the hours of 7:30 to 6:30 • and 12,30 to 1:30 p.m. If repairs are started without a permit you will be Issued pnotice to stop work and the cost of the m—nat.!! be the original 640,00 as well as penalty of three (3) times the permit cost. If you do not have a current Right -of -Way bond, you will need to get an application form from the City Engineer's Office and have It filled out by your Insurance com- pany then returned to the City Engineer's Office to be approved by the city Council at their next regular meeting. P lease note the following deadllnes'. June 21. 2024 —Last day to turn in Right -at -Way bond appilcation. June 28, 2024 —Last day to obtan perm/ uty 12, 2024 —Last day to com- plete repairs. If sidewalk repairs are not completed by Pm deadline, the rep. will be made throuh the City' Sidewalk Repair As- sessment Program. A notice stating that youproperty is in the assessment pro- gram will be sent out and the sidewalk panels will be remarked in green. Upon project completion, the total cost for repairs will be sent to the property owner who will have 30-0ays to make payment to the City. Any balance remaining after the deadline on the invoice will be certified and submitted to Black Hawk County to be included as a special assessment on the property taxes. The total cast shall Include. but Is not limited to. engineering, Inspec- t1onconstruction and administrative costs. PUBLIC HEARING DATE The Waterloo City Council w111 hold a Public Hearing regarding the necessity of sidewalk repairs at their regular council meeting on Monday. May 6. 2024 at 5:30 p.m., In the Council Chambers in the Wa- terloo City Hall. At this hearing. property owners or any other person may appear and speak either for or against the need of the repairs. A property owner will have waived all objec- tions, ss they appear at the hearing, or they have filed written objections with the Waterloo Sidewalk Repair Notice - Page 1 of 2 Clerk by the time of the hearing. This Notice is given by authority of the Council of the City of Waterloo, Iowa If you have any questions regarding this notice or the sidewalk repair program, please call the City Engineers Office at 319) 291- 4312. Kelly Felchle, City Clerk City of Waterloo, Iowa C L-IA-600066 Waterloo Sidewalk Repair Notice - Page 2 of 2