HomeMy WebLinkAboutWRH, Inc - Titus Lift Station, Cont. No. 975 - CO #01 - 6.3.2024AECOM
May 21, 2024
Mr. Jesse Gaherty
Waste Management Services
City of Waterloo
3505 Easton Avenue
Waterloo, Iowa, 50702
Subject: Titus Lift Station and Force Main
Change Order No. 1
City of Waterloo, Iowa
City Contract No. 975
AECOM #60726355
Dear Mr. Gaherty:
AECOM
501 Sycamore Street
Suite 222
Waterloo, Iowa 50703
www.aecom.com
Attached is Change Order No. 1 for the Titus Lift Station and Force Main project submitted by WRH, Inc.
319-232-6531 tel
319-232-0271 fax
The following are the detail for the requested changes.
• Bid Items 8 and 12 — Change in valve manufacturers for the plug and gate valves. The lead time to receive the
valves from the specified manufacturers was over 1 year. See attached WRH Change Request No. 1
• Bid Item 44A — City Staff requested that a man gate be added to the perimeter fence to the life station perimeter
fence. See attached WRH Change Request No. 3
• Bid Item No. 46 - 60" MH needs to be added to the project for the connection of the force main to the existing
sanitary sewer. See attached WRH Change Request No. 2
• Bid Item No. 47 - Alignment change east of Parker Street to avoid the signal mast foundation. The design
alignment brought the force main into conflict with the mast footing and could compromise the structural integrity of
the mast footing. See attached WRH Change Request No. 4
• Bid Items 48A-G — Bedrock was encountered at Grandview Avenue. Directional drilling this area was not possible.
These items are to replace the pavement and adjust the sanitary manhole at Grandview Avenue. See attached
WRH Change Request Nos. 5 and 6.
AECOM recommends the City approves Change Order No. 1 for the addition of $58,822.15 and a revised total contract cost
of $6,242,909.15. The increase is 0.95% of the original contract.
Yours sincerely,
Christopher G. Oelkers, PE
Enclosure: Change Order No. 1 dated 05/22/2024
WRH Inc Change Authorization Request Nos. 1, 2, 3, 4, 5 and 6
L:\DCS\Projects\WTR\60726355_Titus_LS_and_FM_CRS\600_Construction_Support\670_Change-Orders\CO 1\FY24 Wat CIPP PH IVB1 - Change Order No 1 LTR.docx
CHANGE ORDER 1
A=COM
Owner City of Waterloo
Project TITUS LIFT STATION AND FORCE MAIN
Date: May 22, 2024
Owner's Contract No. 975
Contractor: WRH, INC.
SRF NON-SRF
Date of Contact Start
January 2, 2024
Contract Amount:
$6,184,087.00 $
You are directed to make the following changes in the Contract Documents. Description:
8
LIFT STATION WET WELL AND VALVE VAULT
WRH CR 1
$ (48,230.00)
12
AIR RELEASE MANHOLE AT TITUS LIFT STATION
WRH CR 1
$ (11,900.00)
44A
CO NO. 1- 4' WALK GATE
WRH CR 3
$ 2,289.26
46
CO NO. 1- 60-IN MANHOLE
WRH CR 2
$ 35,967.14
47
CO NO. 1- PARKER STREET
WRH CR 4
$ 30,462.75
48A-G
CO NO. 1- GRANDVIEW AV
WRH CR 5 & 6
$ 50,233.00
TOTAL
$ 58,822.15
Reason for Change Order
ADDITION
Bid Item 8 & 12 are deductions due to a change in valve manufacturers. The specified valve had a 1 yr wait time for delivery
Bid Item 44A - City Staff requested that a man gate is added to the lift station site perimeter fence
Bid Item 46 - 60" MH needs to be added to the project for the connection of the force main to the existing sanitary sewer.
Bid Item 47 - Alignment change east of Parker Street to avoid the signal mast foundation. Excavation and connection cost.
Bid Items 48 — Bedrock was encountered at Grandview Avenue. Directional drilling this area was not possible. These items are to replace
the pavement and adjust the sanitary manhole at Grandview Avenue.
CONTRACT PRICE
SRF
NON- SRF
Original:
$ 6,184,087.00
$ 6,184,087.00
$ -
Previous C.O.s
This C.O.
$ -
$ 58,822.15
$ -
$ 58,822.15
$
$ -
Contract Price with all approved
$ 6,242,909.15
$ 6,242,909.15
$ -
Total Change Orders:
$ 58,822.15
0.95% Total CO %
TOTAL
$ 6,242,909.15
Original Completion Date:
Revised Completion Date:
CONTRACT TIME
To Substantial To Final
Completion Completion
11/30/2024
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein,
including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further
time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
APPROVE :
BY: 62aertt%i / (ari
6/3/2024
Owner (Authorized Signature) Date
ACCEPTED:
BY:
May 22, 2024
Contractor (Authorized Signature) Date
ACCEPTED:
BY:
May 22, 2024
AECOM Date
AECOM
60726355 1
Project No. C.O. No.
Project:
CAR No. 1
Reference:
RFQ #
Change Authorization Request
(CAR)
DATE
Location
05/06/24 Job No. 2401-00-1428
Waterloo, IA Contract No.
A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this
authorization is requested so that the material may be purchased and to prevent any delay in field operations.
Reason for Change:
( ) Design Request
( ) Owner Request
( ) Other ---- Explain
( ) Field Condition
( ) Suggested by Contractor
1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable)
Electric Pump supplied equipment deductions
2) It is requested that the completion date be;
by calendar days.
3) Basis of Payment:
a) ( ) Firm price for performing this change
is ( ) increased / (X ) decreased by
is ( ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
b)
c)
d)
(
(
(
Unit Price
( ) extended
( ) decreased
($60,130.00)
$0.00
$0.00
$0.00
) Change to be performed per unit prices in Contract $0.00
The time required to prepare and agree upon a detailed estimate prior to proceeding with
the change would unduly delay job progress. The following is an approximate estimate
to assist Owner in determining whether or not change should be made. If notified to proceed,
a detailed estimate in the form agreed upon, with supporting details, will be submitted
after receipt of said notice.
Approximate Estimate is ($60,130.00)
) CHANGE WILL NOT BE MADE
PROCEED ON THE FOLLOWING BASIS:
Firm Price
Estimate of Price
) Unit Price in Contract
Comments:
( ) Time and Material
( ) Change in Completion Date
( ) No Change
Submitted by: $444 Uya Approved by
Brad Oja, Project Manager Owner
WRH, Inc.
Date: 5/6/2024 Date:
C.A.R. Calculation
Subcontractors
C.A.R.# 1
Quantity Unit Unit Rate
05/06/24
Line Total
$0.00
$0.00
$0.00
$0.00
$0.00
Material:
Supply three (3) Kennedy check valves in -place
of three (3) Dezurik check valves. 1.00 LS -$11,800.00 ($11,800.00)
Remove one (1) 36" x 36" access hatch. City to
provide replacement. 1.00 EA -$730.00 ($730.00)
Supply four (4) Red Valve Series D knife gates
in -place of four (4) Dezurik knife gates 4.00 EA -$11,900.00 ($47,600.00)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor:
Carpenter Hr $96.08
Laborer Hr $90.08 $0.00
Equipment Operator Hr $102.55 $0.00
Foreman Hr $105.09 $0.00
Superintendent Hr $111.09 $0.00
Equipment: $0.00
Field Truck Hr $13.46 $0.00
Skid loader Hr $114.44 $0.00
Scissor Lift Hr $22.44 $0.00
Excavator (Mini) Hr $60.59 $0.00
Excavator (Large) Hr $215.42 $0.00
Crane Hr $333.23 $0.00
Dozer (small) Hr $121.18 $0.00
Dozer (large) Hr $127.91 $0.00
Sub -total ($60,130.00)
Sales Tax on Material 0.00% $0.00
Contractor's Fee (Self -performed) 15.00% $0.00
Contractor's Fee (Sub -contracts) 5.00% $0.00
$0.00
Bond & Insurance 2.00%
($60,130.00)
$0.00
Total Proposed Change ($60,130.00)
Electric Pump supplied equipment deductions
2 of 2
Project:
CAR No. 2
Reference:
RFQ #
Change Autnonzation Request
(CAR)
DATE 05/03/24 Job No. 1428
Location Waterloo, IA Contract No.
A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this
authorization is requested so that the material may be purchased and to prevent any delay in field operations.
Reason for Change:
( ) Design Request
( X ) Owner Request
( ) Other ---- Explain
( ) Field Condition
( ) Suggested by Contractor
1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable)
Add 60" manhole to south end of force main. Doghouse over existing 30" sanitary sewer and cut in.
2) It is requested that the completion date be;
by calendar days.
( ) extended
3) Basis of Payment:
a) ( ) Firm price for performing this change along with attached supporting details
is ( ) increased / ( ) decreased by
b)
c)
d)
(
(
(
Unit Price
( ) decreased
$35,967.14
$0.00
) Change to be performed per unit prices in Contract $0.00
The time required to prepare and agree upon a detailed estimate prior to proceeding with
the change would unduly delay job progress. The following is an approximate estimate
to assist Owner in determining whether or not change should be made. If notified to proceed,
a detailed estimate in the form agreed upon, with supporting details, will be submitted
after receipt of said notice.
Approximate Estimate is $0.00
) CHANGE WILL NOT BE MADE
PROCEED ON THE FOLLOWING BASIS:
Firm Price
Estimate of Price
) Unit Price in Contract
Comments:
( ) Time and Material
( ) Change in Completion Date
( ) No Change
Submitted by: $'i I n Approved by
Brad Oja Owner
WRH, Inc.
Date: 5/3/2024 Date:
C.A.R. Calculation
C.A.R. # 2
Subcontractors
Quantity Unit Unit Rate
05/03/24
Line Total
$0.00
$0.00
$0.00
$0.00
$0.00
Material:
Precast (Rinker) 1.00 EA $8,407.00 $8,407.00
Rebar (White Cap) 0.25 TN $1,375.35 $343.84
Manhole Casting (Schimberg) 1.00 EA $402.13 $402.13
Rock (BMC) 16.00 TN $21.00 $336.00
Concrete (Manatts) 8.00 CY $165.00 $1,320.00
Trucking 2.00 HR $105.00 $210.00
Utility pole bracing (MidAmerican) $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor:
Project Manager 2.0 Hr $195.17 $390.34
Carpenter 30.0 Hr $96.08 $2,882.40
Laborer 30.0 Hr $90.08 $2,702.40
Equipment Operator 40.0 Hr $102.55 $4,102.00
Foreman Hr $105.09 $0.00
Superintendent 30.0 Hr $111.09 $3,332.70
Equipment:
Field Truck 10.0 Hr $13.46 $134.60
Skid loader 12.0 Hr $53.86 $646.32
Scissor Lift Hr $22.44 $0.00
Excavator (Mini) Hr $60.59 $0.00
Excavator (Large) 20.0 Hr $215.42 $4,308.40
End loader 10.0 Hr $114.44 $1,144.40
Crane Hr $333.23 $0.00
Dozer (small) Hr $121.18 $0.00
Dozer (large) Hr $127.91 $0.00
Sub -total $30,662.53
Sales Tax on Material 0.00% $0.00
Contractor's Fee (Self -performed) 15.00% $4,599.38
Contractor's Fee (Sub -contracts) 5.00% $0.00
Bond & Insurance 2.00%
$35,261.91
$705.24
Total Proposed Change $35,967.14
Add 60" manhole to south end of force main. Doghouse over existing 30" sanitary sewer and cut in.
0
0
2 of 2
Project:
CAR No. 3
Reference:
RFQ #
Change Authorization Request
(CAR)
DATE 05/06/24 Job No. 2401-00-1428
Location Waterloo, IA Contract No.
A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this
authorization is requested so that the material may be purchased and to prevent any delay in field operations.
Reason for Change:
( ) Design Request
( ) Owner Request
( ) Other ---- Explain
( ) Field Condition
( ) Suggested by Contractor
1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable)
Add 4 foot wide walk gate to final perimeter fence.
2) It is requested that the completion date be;
by calendar days.
3) Basis of Payment:
a) ( ) Firm price for performing this change
is ( X ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
b)
c)
d)
(
(
(
) Unit Price
( ) extended
( ) decreased
$2,289.26
$0.00
$0.00
$0.00
Change to be performed per unit prices in Contract $0.00
The time required to prepare and agree upon a detailed estimate prior to proceeding with
the change would unduly delay job progress. The following is an approximate estimate
to assist Owner in determining whether or not change should be made. If notified to proceed,
a detailed estimate in the form agreed upon, with supporting details, will be submitted
after receipt of said notice.
Approximate Estimate is $2,289.26
CHANGE WILL NOT BE MADE
PROCEED ON THE FOLLOWING BASIS:
Firm Price
Estimate of Price
Unit Price in Contract
Comments:
( ) Time and Material
( ) Change in Completion Date
( ) No Change
Submitted by: $u01 a Approved by
Brad Oja, Project Manager Owner
WRH, Inc.
Date: 5/6/2024 Date:
C.A.R. Calculation
Subcontractors
05/06/24
C.A.R. # 3
Quantity Unit Unit Rate Line Total
Supply and install one (1) 4' wide x 6' tall
galvanized walk gate with barb wire, hardware,
and proper temination posts (LifeTime Fence) 1.00 LS $1,650.00 $1,650.00
$0.00
$0.00
$0.00
$0.00
Material:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor:
Project Manager 2.0 Hr $195.17 $390.34
Carpenter Hr $96.08 $0.00
Laborer Hr $90.08 $0.00
Equipment Operator Hr $102.55 $0.00
Foreman Hr $105.09 $0.00
Superintendent Hr $111.09 $0.00
Equipment:
Field Truck Hr $13.46 $0.00
Skid loader Hr $114.44 $0.00
Scissor Lift Hr $22.44 $0.00
Excavator (Mini) Hr $60.59 $0.00
Excavator (Large) Hr $215.42 $0.00
Crane Hr $333.23 $0.00
Dozer (small) Hr $121.18 $0.00
Dozer (large) Hr $127.91 $0.00
Sub -total $2,040.34
Sales Tax on Material 0.00% $0.00
Contractor's Fee (Self -performed) 15.00% $0.00
Contractor's Fee (Sub -contracts) 10.00% $204.03
Bond & Insurance 2.00%
$2,244.37
$44.89
Total Proposed Change $2,289.26
Add 4 foot wide walk gate to final perimeter fence.
2 of 2
Project:
CAR No. 4
Reference:
RFQ #
Chang, Request
(CAR)
DATE 05/10/24 Job No. 2401-00-1428
Location
Waterloo, IA Contract No.
A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this
authorization is requested so that the material may be purchased and to prevent any delay in field operations.
Reason for Change:
( ) Design Request
( ) Owner Request
( ) Other ---- Explain
( ) Field Condition
( ) Suggested by Contractor
1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable)
Force main re -alignment at south corner of West Parker Street due to interference with existing traffic
signal mast and footing.
2) It is requested that the completion date be;
by calendar days.
3) Basis of Payment:
a) ( ) Firm price for performing this change
is ( X ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
b)
c)
d)
(
(
(
) Unit Price
( ) extended
( ) decreased
$30,462.75
$0.00
$0.00
$0.00
Change to be performed per unit prices in Contract $0.00
The time required to prepare and agree upon a detailed estimate prior to proceeding with
the change would unduly delay job progress. The following is an approximate estimate
to assist Owner in determining whether or not change should be made. If notified to proceed,
a detailed estimate in the form agreed upon, with supporting details, will be submitted
after receipt of said notice.
Approximate Estimate is $30,462.75
CHANGE WILL NOT BE MADE
PROCEED ON THE FOLLOWING BASIS:
Firm Price
Estimate of Price
Unit Price in Contract
Comments:
( ) Time and Material
( ) Change in Completion Date
( ) No Change
Submitted by: $u01 a Approved by
Brad Oja, Project Manager Owner
WRH, Inc.
Date: 5/10/2024 Date:
C.A.R. Calculation
Subcontractors
C.A.R.# 4
Quantity Unit Unit Rate
05/10/24
Line Total
$0.00
$0.00
$0.00
$0.00
$0.00
Material:
Rock 16.00 TN $21.00 $336.00
Topsoil 15.00 CY $30.00 $450.00
Hydroseeding, type 1 (approx. 3500 sq ft) 0.10 ACRE $5,500.00 $550.00
Concrete (sidewalk replacement, 20 ft) 1.25 CY $370.00 $462.50
Force main fittings (2 elbows, 1 sleeve) 600.00 LB $8.00 $4,800.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor:
Project Manager 3.0 Hr $195.17 $585.51
Carpenter 28.0 Hr $96.08 $2,690.24
Laborer 48.0 Hr $90.08 $4,323.84
Equipment Operator 28.0 Hr $102.55 $2,871.40
Foreman 28.0 Hr $105.09 $2,942.52
Superintendent 18.0 Hr $111.09 $1,999.62
Equipment:
Field Truck 4.0 Hr $13.46 $53.84
Skid loader 4.0 Hr $114.44 $457.76
Scissor Lift Hr $22.44 $0.00
Excavator (Mini) Hr $60.59 $0.00
Excavator (Large) 16.0 Hr $215.42 $3,446.72
Crane Hr $333.23 $0.00
Dozer (small) Hr $121.18 $0.00
Dozer (large) Hr $127.91 $0.00
Sub -total $25,969.95
Sales Tax on Material 0.00% $0.00
Contractor's Fee (Self -performed) 15.00% $3,895.49
Contractor's Fee (Sub -contracts) 10.00% $0.00
Bond & Insurance 2.00%
$29,865.44
$597.31
Total Proposed Change $30,462.75
Force main re -alignment at south corner of West Parker Street due to interference with existing
traffic signal mast and footing.
2 of 2
Project:
CAR No. 5
Reference:
RFQ #
Change Autnorization Request
(CAR)
DATE 05/20/24 Job No. 2401-00-1428
Location Waterloo, IA Contract No.
A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this
authorization is requested so that the material may be purchased and to prevent any delay in field operations.
Reason for Change:
( ) Design Request
( ) Owner Request
( ) Other ---- Explain
( ) Field Condition
( ) Suggested by Contractor
1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable)
Brees Street x Grandview Avenue open cut. 02-CFM-15, 166+72 to 167+72 (100 feet) open cut through
existing asphalt street to complete force main connections due to shallow limestone bedrock interference.
2) It is requested that the completion date be;
by calendar days.
3) Basis of Payment:
a) ( ) Firm price for performing this change
is ( X ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
b)
c)
d)
(
(
(
) Unit Price
( ) extended
( ) decreased
$39,975.40
$0.00
$0.00
$0.00
Change to be performed per unit prices in Contract $0.00
The time required to prepare and agree upon a detailed estimate prior to proceeding with
the change would unduly delay job progress. The following is an approximate estimate
to assist Owner in determining whether or not change should be made. If notified to proceed,
a detailed estimate in the form agreed upon, with supporting details, will be submitted
after receipt of said notice.
Approximate Estimate is $39,975.40
CHANGE WILL NOT BE MADE
PROCEED ON THE FOLLOWING BASIS:
Firm Price
Estimate of Price
Unit Price in Contract
Comments:
( ) Time and Material
( ) Change in Completion Date
( ) No Change
Submitted by: $u01 a Approved by
Brad Oja, Project Manager Owner
WRH, Inc.
Date: 5/20/2024 Date:
05/20/24
C.A.R. Calculation
C.A.R. # 5
Subcontractors Quantity Unit Unit Rate Line Total
Traffic control (Service Signing) 1 LS $1,750.00 $1,750.00
Saw cutting (Iowa Wall Saw) 130 LF $44.00 $5,720.00
Asphalt patching (Aspro, Inc) 141 SY $38.00 $5,350.40
$0.00
$0.00
Material:
Demo 141 SY $25.00 $3,525.00
Subbase Rock 141 SY $20.00 $2,820.00
Concrete 141 SY $160.00 $22,560.00
$0.00
$0.00
$0.00
$0.00
Labor:
Project Manager Hr $195.17 $0.00
Carpenter Hr $96.08 $0.00
Laborer Hr $90.08 $0.00
Equipment Operator Hr $102.55 $0.00
Foreman Hr $105.09 $0.00
Superintendent Hr $111.09 $0.00
$0.00
Equipment:
Field Truck
Skid loader
Scissor Lift
Excavator (Mini)
Excavator (Mid -size)
Excavator (Large)
Crane
Dozer (small)
Dozer (large)
Sub -total
Sales Tax on Material
Contractor's Fee (Self -performed)
Contractor's Fee (Sub -contracts)
Bond & Insurance
Total Proposed Change
Hr $13.46 $0.00
Hr $114.44 $0.00
Hr $22.44 $0.00
Hr $60.59 $0.00
Hr $121.18 $0.00
Hr $215.42 $0.00
Hr $333.23 $0.00
Hr $121.18 $0.00
Hr $127.91 $0.00
0.00%
15.00%
5.00%
2.00%
$39,975.40
$0.00
$0.00
$0.00
$39,975.40
$0.00
$39,975.40
Brees Street x Grandview Avenue open cut. 02-CFM-15, 166+72 to 167+72 (100 feet) open cut
through existing asphalt street to complete force main connections due to shallow limestone
bedrock interference.
2 of 2
Project:
CAR No. 6
Reference:
RFQ #
Chanye hull iui 14auuil Request
(CAR)
DATE 05/20/24 Job No. 2401-00-1428
Location
Waterloo, IA Contract No.
A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this
authorization is requested so that the material may be purchased and to prevent any delay in field operations.
Reason for Change:
( ) Design Request
( ) Owner Request
( ) Other ---- Explain
( ) Field Condition
( ) Suggested by Contractor
1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable)
Existing manhole #1777 major manhole adjustment. Per SUDAS Standard Specifications.
2) It is requested that the completion date be;
by calendar days.
3) Basis of Payment:
a) ( ) Firm price for performing this change
is ( X ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
is ( ) increased / ( ) decreased by
b)
c)
d)
(
(
(
) Unit Price
( ) extended
( ) decreased
$8,500.00
$0.00
$0.00
$0.00
Change to be performed per unit prices in Contract $0.00
The time required to prepare and agree upon a detailed estimate prior to proceeding with
the change would unduly delay job progress. The following is an approximate estimate
to assist Owner in determining whether or not change should be made. If notified to proceed,
a detailed estimate in the form agreed upon, with supporting details, will be submitted
after receipt of said notice.
Approximate Estimate is $8,500.00
CHANGE WILL NOT BE MADE
PROCEED ON THE FOLLOWING BASIS:
Firm Price
Estimate of Price
Unit Price in Contract
Comments:
( ) Time and Material
( ) Change in Completion Date
( ) No Change
Submitted by: $u01 a Approved by
Brad Oja, Project Manager Owner
WRH, Inc.
Date: 5/20/2024 Date:
C.A.R. Calculation
Subcontractors
C.A.R. # 6
Quantity Unit Unit Rate
Material:
1' x 48" precast manhole barrel, cone,
adjusting ring, chimney seal, casting, demo
and removal, hauling, labor, and equipment
1.0 EA $8,500.00
05/20/24
Line Total
$0.00
$0.00
$0.00
$0.00
$0.00
$8,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor:
Project Manager Hr $0.00
Carpenter Hr $0.00
Laborer Hr $0.00
Equipment Operator Hr $0.00
Foreman Hr $0.00
Superintendent Hr $0.00
$0.00
Equipment:
Field Truck
Skid loader
Scissor Lift
Excavator (Mini)
Excavator (Mid -size)
Excavator (Large)
Crane
Dozer (small)
Dozer (large)
Sub -total
Sales Tax on Material
Contractor's Fee (Self -performed)
Contractor's Fee (Sub -contracts)
Bond & Insurance
Total Proposed Change
Hr $0.00
Hr $0.00
Hr $0.00
Hr $0.00
Hr $0.00
Hr $0.00
Hr $0.00
Hr $0.00
Hr $0.00
0.00%
15.00%
5.00%
2.00%
$8,500.00
$0.00
$0.00
$0.00
$8,500.00
$0.00
$8,500.00
Existing manhole #1777 major manhole adjustment. Per SUDAS Standard Specifications.