Loading...
HomeMy WebLinkAboutMunicipal Pipe and Tool - FY24 CIP Pipelining, Cont. 1102 - CO #1 - 6.3.2024AECOM May 16, 2024 Mr. Jesse Gaherty Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa, 50702 Subject: FY 2024 CIP Pipelining Phase IVB1 Amendment No. 1 City of Waterloo, Iowa City Contract No. 1102 AECOM #60721823 Dear Mr. Gaherty: AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com 319-232-6531 tel 319-232-0271 fax City Staff Recommends lining of the segments from City Manhole No. 2652 to 29097 in SA 23 due to high I&I at near the Bosnian Center. AECOM recommends approval by the City to approve Change Order No. 1 in the amount of $29,355.94. This Change Order increases the Contract by 5.44%. The revised Contract Amount is $569,348.33. CONTRACT PRICE Original: $ 539,992.39 BASE + ALT 1 Previous C.O.s $ This C.O. $ 29,355.94 CO 1 Contract Price with all approved $ 569,348.33 Total Change Orders: $ 29,355.94 5.44% Total CO % Yours sincerely, Christopher G. Oelkers, PE Enclosure: Change Order No. 1 Form Plan Sheet CO No. 1 L:\DCS\Projects\WTR\60721823_FY_2024_CIPP\600_Construction_Support\ 660_Change_Orders\CO 1\FY24 Wat CIPP PH IVB1 - Change Order No 1 LTR.docx A=COM Original Completion Date: Revised Completion Date: CHANGE ORDER 1 Owner City of Waterloo Project FY 2024 CIP PIPELINING PHASE IVB1 Date: May 16, 2024 Owner's Contract No. 1102 Contractor: Municipal Pipe Tool Co. LLC Date of Contact Start March 4, 2024 Contract Amount: BASE + ALT 1 $ 539,992.39 You are directed to make the following changes in the Contract Documents. Description: 101 8" Diameter CIP Pipe Lining $ 23,361.22 102 Pipe Televising - 8" $ 2,497.80 103 Type A Pipe Cleaning - 8" $ 3,496.92 TOTAL $ 29,355.94 Reason for Change Order CITY STAFF Recommends lining of these segments in SA 23 due to high I&I at near the Bosnian Center CONTRACT PRICE Original: $ 539,992.39 BASE + ALT 1 Previous C.O.s This C.O. $ 29,355.94 CO 1 Contract Price with all approved $ 569,348.33 Total Change Orders: $ 29,355.94 5.44% Total CO CONTRACT TIME To Substantial To Final Completion Completion 11/30/2024 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: Qae/z- WZ BY: SIC'II [I Owner (Authorized Signature) ACCEPTED: BY: /l (A.t.01/1 Wa/O C iti k-ask-- 6/3/2024 Date May 16, 2024 Contractor (Authorized Signature) Date ACCEPTED: BY: May 16, 2024 AECOM Date AECOM 60721823 1 Project No. C.O. No. 15-12 200786 2730 200784 29083 6 15-01-07 15-01-08 17-11-13 --- -- ;--- 2729 /1 115-01-09 z r \ 39487 I O %' :! V17-11-11 I W I 17-11-12 '4', 39488j 4 .� 1 2720 07-11- IW 1 \ Jr I il 2732 1,.,ir & Ti. 15-01-17 I 22 gg 15-01-10 cloti 273AN ?00790 15-13502 5-14-02 _ 17-20-01 \ I `2758 2674 \ 113 QQ 789 , P 15-276D1 „ono- 4 v_ �/ '2761 2763 / 2� 40 0afe 200743 £' % 17-16-03 2629 / 17-16-01 / /I"4.... -".. / / '"•••+iihn 2632 / ,Z I 17-16-02 d ftg 4` 0 II 1 -1 03 \ °-/' 7 r r I G m 506 \ 29097\ 17-19 2649 �¢ . ,\17-15 '• ,9 \. \ 17-14-02 2639 200770 I ` t 14-12 ;,,,"im' 11 ri 200776 14-04-0571 ti i 17-11-03 I 2682 1 2678 23471 23473 d' 0 17-11-02 2661 17 09 1708 2670 \ 2671 17-10 _ -% \ 7-05 / i 3948� "\ 7 Nev". \\LS2325 23468' / f 1711 / 4/ •`` ( t7`- 17-06 - - \\ I,, 23475 / \ \ 3267 \17-11-10 \ \ 2677 17-11-08;_ / \ 2690 \ 17-11-09 0 y \ 2689 V17-11-07 4P " 117-1 1806 ' 17-1105La,to i i /17-11-04 / 200742 / O. 200741 / 200763 20p764 2618 2621 \ 2IA8\ 200745 17-12-01 / 14-09-01 14-01-23 14-01-22 14-01-21 \ 17-14 L _ 17-13 \ /2656 I \ j 17-12 \ / 7.- QUIGBY RD \ \ I 17-14-01 1 . ; - ` Nh •I 200765 2617 2642 4) , 1-.1 ,1 I . 14-01-08 14-01-07 _ - - ICI -06 \ 200769 17-13-01 2612 2007621 I- _ I 14-11 200746 14-10 14-09 I - - - UN -05 W I ' 1 p 1200766 4-01-18 1 2607 7 \ \ 14- 5. THE CONTRACTOR SHALL DOCUMENT AND VERIFY WITH THE ENGINEER ALL PRESUMED ABANDONED K I P L I N G RD ■R DI 400 7 58\ 20 LATERALS INCLUDING THOSE EXTENDING TO EMPTY LOTS. THE SEGMENT SHALL NOT BE LINED UNTIL THE • 9�i A - - •� ?� �F I Z KI P LI N G �-, _ ABANDONMENT IS VERIFIED. CI PP BID ITEM 2 3 4 DWG MH City MH MH City MH Route 8" 10" 12" Lat CHANGE ORDER NC. 1 - SA 23 C01 17-17 200747 17-16 2652 Marigold Drive 319 0 C01 17-18 2683 17-17 200747 Marigold Drive 190 0 C01 17-19 29097 17-18 2683 Marigold Drive 0' 320 50' N 100' 0 200' NOTES SCALE 1. LATERAL QUANTITIES ARE BASED ON SEGMENT HOUSE COUNT TAKEN FROM AERIAL. THESE QUANTITIES SHALL BE CONSIDERED APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE QUANTITY TO ENSURE ALL ACTIVE LATERALS ARE REINSTATED AND GROUTED. 2. CONTRACTOR SHALL CONTACT THE ENGINEER PRIOR TO ANY OUT OF SCOPE MAIN LINE CLEANING OR ROOT REMOVAL. ANY EXTRA CLEANING OR ROOT REMOVAL UNDERTAKEN BY CONTRACTOR PRIOR TO BEING GRANTED PERMISSION BY THE OWNER IS AT THE CONTRACTORS RISK. IN THESE CASES, THE CONTRACTOR SHALL STOP WORK ON THAT SEGMENT TO ALLOW THE ENGINEER AND OWNER TO REVIEW THE SITUATION AND DETERMINE THE BEST WAY FORWARD. 3. THE CONTRACTOR SHALL DOCUMENT ANY SIGNIFICANT DAMAGE TO THE MAIN LINE ON THE SEGMENT LOG. CONTACT THE ENGINEER IF THE MAIN LINE PIPE IS TOO DAMAGED TO LINE. THE CONTRACTOR SHALL PROVIDE THE OWNER A SNAP SHOT PICTURE OF THE DAMAGE FROM THE PRE- VIDEO FOOTAGE. 4. THE CONTRACTOR SHALL CONTACT THE ENGINEER REGARDING ANY EXISTING DAMAGE TO LATERALS DISCOVERED DURING THE CLEANING AND PRE- VIDEO ACTIVITIES THAT WOULD PREVENT LINING OR GROUTING WORK. VERIFY SCALE IF PLAN SHEET IS REDUCED T Z 05/08/24 ti 0 U 0 CHANGE ORDER NO. 1 FOR BIDDING Z 0 0 0 0 V CO w V7 N < 0 0_ 0 0 CO J • Z 0_ 0 - wZ Z H - a1- J 3U w < 0- LL 0_ - 0 I- CL Z r0 0- - 0 U UI- N 0 0 N >- LL SERVICE AREA NO. 23 CHANGE ORDER NO. 1 DATE MAY 2024 PROJECT NO 60721823 FILENAME CIP PH IVB1 SHEET NO DRAWING NO CO NO. 1