HomeMy WebLinkAboutPeterson Contractors - Contract No. 971, CO #14 - 6.17.2024Jifrip CHANGE ORDER NO. 14 Owner City of Waterloo Date: 5/29/2024 Project University Avenue Reconstruction - Phase 3 Owner's Contract No. 971 Contractor: Peterson Contractors, Inc. Date of Contact Start 3/16/2020 Contract Amount: $ 14,387,651.08 You are directed to make the following changes in the Contract Documents. Description: 14-1 MOBILIZATION, SAN SWR WORK $ 4,000.00 /LS x 1 LS $ 4,000.00 14-2 SAN SWR GRAVITY MAIN, TRENCHED, 8" $ 70.00 /LF x 159 LF $ 11,130.00 PVC TRUSS 14-3 MANHOLE, SAN SWR, SW-301, 48" $ 7,500.00 /EA x 1 EA $ 7,500.00 14-4 CONNECT TO EXIST MANHOLE, SAN SWR $ 2,750.00 /EA x 1 EA $ 2,750.00 14-5 MANHOLE ADJUSTMENT, MAJOR $ 4,500.00 /EA x 1 EA $ 4,500.00 14-6 MOBILIZATION, WATER MAIN WORK $ 4,000.00 /LS x 1 LS $ 4,000.00 WATER MAIN, TRENCHED, DIP, 6", NITRILE 14-7 GASKETS, RESTRAINED JOINTS $ 70.00 /LF x 627 LF $ 43,890.00 14-8 FIRE HYDRANT ASSEMBLY PER PLAN $ 10,900.00 /EA x 1 EA $ 10,900.00 14-9 6" X 22.5 FITTING $ 825.00 /EA x 3 EA $ 2,475.00 14-10 6" X 45 FITTING $ 850.00 /EA x 1 EA $ 850.00 14-11 6" X 90 FITTING $ 875.00 /EA 1 EA $ 875.00 14-12 6" CAP $ 800.00 /EA x 1 EA $ 800.00 14-13 6" VALVE FITTING $ 4,750.00 /EA x 2 EA $ 9,500.00 14-14 SILT FENCE $ 3.00 /LF x 1900 LF $ 5,700.00 SEEDING, FERTILIZING, AND 14-15 HYDROMULCHING (URBAN) $ 4,500.00 /AC x 2.5 AC $ 11,250.00 TOTAL ADDITIONS $ 120,120.00 Reason for Change Order 14-1- These bid items includes all labor, equipment and supplies to construct the sanitary sewer and water main for the developable site north 14-15 of University Avenue and east of Black Hawk Creek. Silt fence and seeding items are for restoring areas disturbed by sewer and water CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 14,387,651.08 Original Completion Date: 11/19/2021 I 11/19/20211 Previous C.O.s (ADD/DEDUCT) $ 426,132.44 This C.O. (ADD/DEDUCT) $ 120,120.00 Revised Completion Date: Contract Price with all approved Change Orders: $ 14,933,903.52 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: BY: ate/Hnl J (1 Ownei,{Authprized Signature) ACCEP BY: 6/17/2024 Date Contractor (Authorized Signature) Date -2 r 6/10/24 Date AECOM 60630288 I 14 Project No. C.O. No. www.petersoncontractors.com PETERSON CONTRACTORS, INC. 104 Blackhawk Street P.O. Box A Reinbeck, Iowa 50669 Phone: 319-345-2713 Fax: 319-345-2991 QUOTE J8633 Weisman Water & Sanitary SPECIAL PROVISIONS: 1. Please refer questions to Chris Fleshner at (319) 415-5212. 2. PCI assumes the Sanitary Tie-in will be 14' or less and a standard connection. All other work will be considered extra. 3. PCI assumes that all items will be measured for final payment. 4. PCI excludes all Traffic Control if required. 5. PCI assumes all work can be completed without having to remove existing features such as trail. ITEM # DESCRIPTION UNIT TYPE QUANTITY UNIT PRICE TOTAL AMOUNT 1 Sanitary MOB LS 1.000 $4,000.00 $4,000.00 2 8" Sanitary Sewer LF 159.000 $70.00 $11,130.00 3 Sanitary Manhole EA 1.000 $7,500.00 $7,500.00 4 Sanitary Connect to Existing EA 1.000 $2,750.00 $2,750.00 5 Sanitary Manhole Adjustment EA 1.000 $4,500.00 $4,500.00 6 Silt Fence LF 400.000 $3.00 $1,200.00 7 Seeding AC 1.000 $4,500.00 $4,500.00 Sanitary Subtotal - $35,580.00 11 Water MOB LS 1.000 $4,000.00 $4,000.00 12 6" Water Main LF 627.000 $70.00 $43,890.00 13 Hydrant Assembly EA 1.000 $10,900.00 $10,900.00 14 6" x 22.5 Fitting EA 3.000 $825.00 $2,475.00 15 6" x 45 Fitting EA 1.000 $850.00 $850.00 16 6" x 90 Fitting EA 1.000 $875.00 $875.00 17 6" Cap EA 1.000 $800.00 $800.00 18 Silt Fence LF 1,500.000 $3.00 $4,500.00 19 Seeding AC 1.500 $4,500.00 $6,750.00 20 6" Valve EA 2.000 $4,750.00 $9,500.00 Water Subtotal - $84,540.00 TOTAL QUOTED AMOUNT - $120,120.00