HomeMy WebLinkAboutWRH, Inc. - Contract No. 1067, CO #2 - 6.17.2024heAl STRAND ASSOCIATES® Exelle:ce in Engineering"'' June 4, 2024 CHANGE ORDER NO. 2 PROJECT: OWNER: CONTRACT: CONTRACTOR: Strand Associates, Inc.® 910 West Wingra Drive Madison, WI 53715 (P) 608.251.4843 www.stra nd.com F.Y. 2023 Wastewater Treatment Plant Final Clarifier No. 3 Rehabilitation City of Waterloo, Iowa 1067 WRH, Inc. Description of Change 2a Use skimmer arm assembly furnished by Owner instead (DEDUCT) of Contractor -furnished skimmer arm. Add replacement of existing skimmer arm wiper blade. These changes are in accordance with the Cost Proposal Request (CPR) 001 dated October 20, 2023, and Request for Change (RFC) 4 dated February 1, 2024. 2b Remove Allowance for Partial Depth Base Slab Repairs (DEDUCT) from Specifications Section 03 01 30—Concrete Surface Repair in accordance with RFC 5R-2 dated May 22, 2024. 2c Remove Allowance for Full Depth Base Slab Repairs (DEDUCT) from Specifications Section 03 01 30—Concrete Surface Repair in accordance with RFC 5R-2 dated May 22, 2024. 2d Remove Allowance for Chemical Crack Injection from (DEDUCT) Specifications Section 03 64 00—Crack Repairs in accordance with RFC 5R-2 dated May 22, 2024. 2e Add Base Slab Concrete Repair Lump Sum integral ADD with grout topping placement in accordance with RFC 5R-2 dated May 22, 2024. 2f Change the Final Clarifier Equipment Inspection and ADD Repair —Unidentified Repairs from $50,000.00 to $55,975.58 to add manifold seal repair plates in accordance with RFC 6 dated May 1, 2024, and Evoqua report dated February 28, 2024. 2g Extend Contract Substantial Completion and ADD Final Completion Dates by 35 calendar days in accordance with RFC 5 dated May 22, 2024. TOTAL VALUE OF THIS CHANGE ORDER: KPB:tII\S:\MAD\4400- 4499\4463\016\Construction\Change Orders\CO 2\CO 2.docx ADD ($6,553.80) ($9,000.00) ($32,000.00) ($10,000.00) $159,670.80 $5,975.58 $0.00 $108,092.58 Arizona j Illinois I Indiana I Iowa I Kentucky I Ohio I Tennessee I Texas I Wisconsin Strand Associates, Inc. City of Waterloo—WRH, Inc. Contract 1067, Change Order No. 2 Page 2 June 4, 2024 Contract Price Adjustment Original Contract Price Previous Change Order Adjustments Adjustment in Contract Price this Change Order Current Contract Price including this Change Order Contract Substantial Completion Date Adjustment Original Contract Substantial Completion Date Contract Substantial Completion Date Adjustments due to previous Change Orders Contract Substantial Completion Date Adjustments due to this Change Order Current Substantial Contract Completion Dates including all Change Orders Contract Final Completion Date Adjustment Original Contract Final Completion Date Contract Final Completion Date Adjustments due to previous Change Orders Contract Final Completion Date Adjustments due to this Change Order Current Final Contract Completion Dates including all Change Orders $842,000.00 $36,605.84 $108,092.58 $986,698.42 January 7, 2024 173 Days 35 Days August 2, 2024 February 6, 2024 171 Days 35 Days August 30, 2024 %% 0 � 1 pN�,i,; his document shall become a supplement to the Contract and all provisions will apply hereto. =a3 RANDALL A. wi WRTZ 16137 °'= lam) %r+��NSU ANT Strand As ci es, Inc.®Date / ���fOtW& %��AP ;OMMEND CONTRACTOR—WRH, Inc. APPROVED Querc1ui art CITY —City of Waterloo, Iowa KPRall`S:''MAD 4400--4499 4463 0I 6' Conslruclio&Change Orders CO 2 CO 2.docx 6X4/ Date 6/17/2024 Date www.strand corn Request for Change (RFC) Project: FY 23 Wastewater Treatment Plant Final Clairifier #3 Rehabilitation - Waterloo, la. RFC No. 4 DATE 02/01/24 Job No. 1419 Reference: RFQ # Location Contract No. A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this authorization is requested so that the material may be purchased and to prevent any delay in field operations. Reason for Change: ( ) Design Request ( X) Owner Request ( ) Other ---- Explain ( ) Field Condition ( ) Suggested by Contractor 1) A) Credit for owner -provided skimmer arm, B) Cost of providing and installation of additional wiper blades. 2) It is requested that the completion date be; by 0 calendar days. ( ) extended ( X ) decreased 3) Basis of Payment: a) ( ) Firm price for performing this change along with attached supporting details is ( ) increased / ( X ) decreased by $6,553.80 b) ( ) Unit Price $0.00 c) d) ( ( Change to be performed per unit prices in Contract $0.00 ) The time required to prepare and agree upon a detailed estimate prior to proceeding with the change would unduly delay job progress. The following is an approximate estimate to assist Owner in determining whether or not change should be made. If notified to proceed, a detailed estimate in the form agreed upon, with supporting details, will be submitted after receipt of said notice. Approximate Estimate is $0.00 ( ( ( (x ) CHANGE WILL NOT BE MADE PROCEED ON THE FOLLOWING BASIS: ) Firm Price ) Estimate of Price ) Unit Price in Contract Comments: ( ) Time and Material ( ) Change in Completion Date ( ) No Change Submitted by: A proved by ateitan r Tim Williams Owner WRH, Inc. Date: 2/1/2024 Date: 6/17/2024 DIGITALLY SIGNED FY 23 Wastewater Treatnnent Plant Final Clairifier #3 Rehabilitation Waterloo, la. RFC Calculation RFC # 4 Subcontractors Material: N et material Credit includes: Credit for owner provided Skimmer Arms Additional cost of additional skimmer blades Labor: (sorting materials and installation of additional skimmer blades) General Labor Skilled Labor Truck Driver Equipment Operator Foreman S uperintendent Project Manager Equipment: Field Truck Med Duty Flatbed Truck Skid loader S cissor Lift Excavator (under 100 HP) Excavator (100 HP +) Crane Dozer (small) Dozer (large) Sales Tax on Material Contractor's Fee (Self -performed) Contractor's Fee (Sub -contracts) Bond & Insurance Total Proposed Change Quantity Unit LS 1.00 LS 16.0 Hr 8.0 Hr Hr Hr 8.0 Hr 1.0 Hr 1.0 Hr Sub -total Day Hr. Hr Hr Hr Hr Hr Hr Hr 1419 Unit Rate $0.00 -310,000.00 $79.50 $84.34 $87.35 $91.40 $95.40 $104.03 $182 75 $93.60 $61.20 $57.20 $41.60 $83.20 $135.20 $282 54 $98.80 $130.00 0.00% 15.00% 5.00% 2 00% 02/01/24 Line Total $0.00 $0.00 $0.00 $0.00 $0.00 ($10,000.00) $0.00 $0.00 $0.00 $0.00 $0.00 $1,272 00 $674.72 $0.00 $0.00 $763.20 $104.03 $182 75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ($7,003.30) $0.00 $449.51 $0.00 $0.00 ($6,553.80) ($6,553.80) A) Credit for owner -provided skimmer arm, B) Cost of providing and installation of additional wiper blades. 2of2 \hf/ Request for Change (RFC) Project: FY 23 Wastewater Treatment Plant Final Clarifier #3 Rehabilitation - Waterloo, Ia. RFC No. 5R - 2 DATE 05/22/24 Job No. 1419 Reference: RFQ # Location Final Clarifier #3 Contract No. 1067 A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this authorization is requested so that the material may be purchased and to prevent any delay in field operations. Reason for Change: ( ) Design Request ( X) Owner Request ( ) Other ---- Explain 1) ( ) Field Condition ( ) Suggested by Contractor The BASE BID included the following Allowance #1: - Concrete Surface Repair- Top Slab surface Repairs Q�t rr Unit Price Allowance Total 10 CF $ 900.00 $ 9,000.00 Following multiple inspections of the clarifier floor, it was evident that much more of the existing floor needed to be replaced. WRH is requesting: - An additional Lump Sum Change Order item to cover the full extent of the floor repair. - With approval of this RFC, the project can draw from the current Allowances: - Allowance #1 Partial Depth Base Slab Repairs $ 9,000.00 - Allowance #2 Full Depth Base Slab Repairs $ 32,000.00 - Allowance #3 Chemical Injection Crack Repairs $ 10,000.00 $ 51,000.00 2) It is requested that the completion date be; by 35.00 calendar days. 3) Basis of Payment: ( X) extended ( ) decreased a) ( X ) Firm price for performing this change along with attached supporting details is (X ) increased / ( ) decreased by $159,670.80 b) ( ) Unit Price c) ( ) Change to be performed per unit prices in Contract $0.00 d) ( ) The time required to prepare and agree upon a detailed estimate prior to proceeding with the change would unduly delay job progress. The following is an approximate estimate to assist Owner in determining whether or not change should be made. If notified to proceed, a detailed estimate in the form agreed upon, with supporting details, will be submitted after receipt of said notice. Approximate Estimate is ) CHANGE WILL NOT BE MADE PROCEED ON THE FOLLOWING BASIS: ) Firm Price Estimate of Price ) Unit Price in Contract Comments: $0.00 ( ) Time and Material ( ) Change in Completion Date ( ) No Change Submitted Que J it Tim Willi Owner WRH, Inc. Date: 5/22/2024 Date: 6/17/2024 FY 23 Wastewater Treatment Plant Final Clarifier #3 Rehabilitation - Waterloo, la. RFC Calculation 1419 RFC #5R-2 Subcontractors Quantity Unit Unit Rate Line Total Roto Rooter - Cleaning 2 00 Day $0.00 Material: PCC Mix 106.00 CY $177.50 $18,815.00 At 2" thick & 105' diameter the planned grout quantity is 54 CY Floor grout and floor repairs used 160 CY Deducting for the planned 54CY grout course leaves a 106 CY overrun for floor repairs. Labor: Preparation, placing and curing partial depth PCC Mobilization - Straight Time Mobilization - OT Crane & Operator - Straight Crane & Operator - OT Mini w/ Breaker & Operator - Straight Mini w/ Breaker & Operator - OT Supervision - Straight Time Supervision - OT Labor - Straight Time Labor - OT Air Compressor Pump Truck & Operator - Straight Time Pump Truck & Operator - OT Jackhammer 27.50 4.00 24 80 3 50 66 50 3.50 76.19 9.00 712 58 116.66 22 00 5.30 2 98 1.00 Sub -total Sales Tax on Material Contractor's Fee (Self performed) Contractor's Fee (Sub -contracts) Bond & Insurance Total Estimated Change Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ LS $ 170 13 218 17 252.55 303.83 163 14 214.42 111.09 166.64 90.08 135 12 13 46 252.55 378 83 150.00 0.00% 15.00% 5.00% 200% $4,678 58 $872 68 $6,263 24 $1,063.41 $10, 848 81 $750.47 $8,463 95 $1,499.76 $64,189 21 $15,763 10 $296.12 $1,338 52 $1,128 91 $150.00 $0.00 $136,121.74 $0.00 $20,418 26 $0.00 $0.00 $156,540.00 $3,130 80 $159,670.80 DOES NOT include costs for PRV's, core drilling, waterstop, welding, roughening the surface. ON Fri. 5/17/24 (the day of the grout pour) only 2/3 of the hours are included. 1/3 of the grout quantity used was for +/- 2" of grout topping included in the Base Bid. Labor & Equipment Calculation Confidential Page 1 Date 05/17/24 05/17/24 05/17/24 BENTON' S READY MIXED CONCRETE 725 CENTER STREET CEDAR FALL S , IA 50613 PHONE : (319) 266-2641 FAX: (319) 266-2643 over commitment amount 5/20 W R H , INC. apinvoices@wendlerinc.com • Ticket Qty • Description Customer No. Invoice Date Invoice Number Job Id PO / Lot # Credit Terms 1 160.00 CY WRH SPECIAL GROUT 1 160.00 EA HAUL RATE - 6.25 YDS + 1 160.00 EA high range super plas. • THANK YOU FOR YOUR BUSINESS.... Invoices are available for email now. Notify the office, if you would like them emailed. • • * * * INVOICE • 72700 5/17/2024 215861 Page 1 TP Clarifier # 3 Rehab 14192304 NET DtJE IN 30 DAYS Price Amount 112.00 60.00 5.50 17920.00 9600.00 880.00 Sub -Total 28400.00 Sales Tax- IA 7 .00 Invoice Total 28400.00 A discount of $ 8 0 0.0 0 if paid by discount 30 days- Net 30 days Request for Change (RFC) Project: FY 23 Watewater Treatment Plant Final Clarifier #3 Rehabilitation - Waterloo, la. RFC No. Reference: RFQ # 6 DATE 05/01/24 Job No. 1419 Location Clarifier #3 Contract No. 1067 A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this authorization is requested so that the material may be purchased and to prevent any delay in field operations. 1) Reason for Change: ( ) Design Request (X ) Owner Request ( ) Other ---- Explain ( ) Field Condition ( ) Suggested by Contractor Field inspection of the existing clarifier mechanism revealed the need for additional Metal manifold plates be added to the center column to keep debris out. As the existing allowance has been used, we respectfully request a change order to increase the allowance to cover this additional work. 2) It is requested that the completion date be; by 2 calendar days. ( X ) extended ( ) decreased 3) Basis of Payment: a) ( x ) Firm price for performing this change along with attached supporting details is ( x ) increased / ( ) decreased by $6,270.78 b) c) d) ( ( ( ) Unit Price $0.00 ) Change to be performed per unit prices in Contract $0.00 ) The time required to prepare and agree upon a detailed estimate prior to proceeding with the change would unduly delay job progress. The following is an approximate estimate to assist Owner in determining whether or not change should be made. If notified to proceed, a detailed estimate in the form agreed upon, with supporting details, will be submitted after receipt of said notice. Approximate Estimate is $0.00 ( ) CHANGE WILL NOT BE MADE PROCEED ON THE FOLLOWING BASIS: ( ) Firm Price ( ) Estimate of Price (x ) Unit Price in Contract Comments: ,. ( ) Time and Material ( ) Change in Completion Date ( ) No Change Submitted by: Tim William WRH, Inc. Date: 5/1/2024 Approved by Quuertiu2 i llzr DIGITALLY SIGNED Owner Date: 6/17/2024 FY 23 Watewater Treatment Plant Final C RFC Calculation Subcontractors Material• Additional Materials - Superior Welding Welding Materials Labor: General Labor S killed Labor arifier #3 Rehabilitation - Waterloo, Ia. RFC # 6 S afety Professional i Foreman Superintendent Project Manager Equipment Field Truck S kid loader Scissor Lift Excavator (under 100 HP) Excavator (100 HP +) Welder Dozer (small) Dozer (large) Sales Tax on Material Contractor's Fee (Self -performed) Contractor's Fee (Sub -contracts) Bond & Insurance Total Proposed Change Quantity Unit LS Sub -total 1.00 LS 1.00 LS 160Hr Hr Hr 16.0 Hr 2 0 Hr 2 0 Hr 20Day Hr 16.0 Hr Hr Hr 160Hr Hr Hr Unit Rate $0.00 $421.29 $75.00 $79.50 $96.08 $111.09 $105.09 $111.09 $195.17 $93.60 $57.20 $41.60 $83.20 $135.20 $26.93 $98 80 $130.00 0.00% 15.00% 5.00% 05/01/24 Line Total $0.00 $0.00 $0.00 $0.00 $0.00 $421 29 $75.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,272 00 $0.00 $0.00 $1,681.44 $222.18 $390 34 $187 20 $0.00 $665.60 $0.00 $0.00 $430.88 $0.00 $0.00 $5,345.93 $0.00 $801.89 $0.00 $0.00 $6,147.82 $122 96 $6,270.78