Loading...
HomeMy WebLinkAboutAECOM - PSA - FY24 IDOT Vertical Infrastructure Grant - 7.1.24FY 2024 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91240AL0200 IDOT CONTRACT NO. CNTRT-00005819 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description - See Attached Exhibit A. Scope of Services - See Attached Exhibit A. Compensation A. Compensation for services for this project shall be on a cost-plus fixed fee basis with a not -to -exceed fee of Seventeen Thousand Five Hundred Dollars ($17,500.00) without authorization of the Client. See attached Exhibit B, Consultant Cost Summary. General Conditions Except as specifically amended by this Individual Project Agreement, Services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered between AECOM Technical Services, Inc. ("ATS") and the City of Waterloo ("Client") dated February 4, 2020. APPROVED: APPROVED: CITY OF WATERLOO, IOWA AECOM TECHNICAL SERVICES, INC. /��/'z /9 ,,, / DIGITALLY h�G/ J 11J//i/'.�Tli SIGNED By By Quentin M. Hart, Mayor Douglas W. Schindel, P.E. Vice President Date 7/1/2024 Date June 13, 2024 EXHIBIT A SCOPE OF SERVICES FY 2024 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91240ALO200 IDOT CONTRACT NO. CNTRT-00005819 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA I. Project Description The project is described as the projects associated with the Iowa Department of Transportation FY 2024 Vertical Infrastructure Projects. Projects identified in the grant include the following: Project will include the replacement of the magnetic door hardware in the airport terminal building with hardware that will meet the TSA CAT -III requirements, replacement of door hardware for the secure holding area, installation of additional closed circuit television cameras and installation of a controlled access pedestrian door to the baggage unloading area from the interior of the terminal building. Estimated total project costs and associated funding for these improvements is approximately $125,000. II. Scope of Services The work to be performed by the Consultant includes the following tasks: 1. Data Collection and Review - This task consists of the collection of existing data applicable to this project and related to the proposed work site. The record drawings of completed projects will be compiled as background information for the project. Consultant will complete visual survey, investigation, and photographic documentation of their existing conditions. 2. Final Design - This task consists of the preparation of the final bid and quote documents for this project, including specifications, drawings (as required) and cost estimates. The final plans and/or specifications will set forth the requirements of the design phase. 3. Final Project Specifications - This task consists of the preparation of specifications for the project. The specifications will be in compliance with current City of Waterloo and Iowa Department of Transportation requirements in effect at the time the specifications are prepared. 4. Estimate of Probable Construction Cost - This task consists of the preparation of an estimate of construction costs based upon the plans and specifications. This statement of probable construction cost prepared by the Consultant represents the Consultant's best judgment as a design professional at the time the estimate is drawn. It is recognized, however, that neither the Consultant nor the Client has any control over the cost of labor, materials, or equipment; over the contractor's method of determining bid prices; or over competitive bidding or market conditions. Accordingly, the Consultant cannot and does not guarantee that bids will not vary from any Statement of Probable Construction Cost or other cost estimates prepared by the Consultant. 5. Quality Review - This task consists of the quality review of work elements on the project. During this project, quality reviews will be conducted by senior technical personnel not directly involved in the project. 6. Bid Assistance - This task consists of assisting the Client in advertising for and receiving bids or quotes, analyzing the bids or quotes received and preparing a recommendation to the Client for award of contract. Project will be bid as three separate bid packages. 7. Bid Document Interpretation - This task consists of answering bid document interpretation questions from bidders, preparing, and issuing any required addenda. 8. Resident Review - This task consists of limited on -site construction review at key critical construction operations to observe construction operations to determine compliance with contract documents. Site reviews will be documented in a construction journal. Coordination with airport tenants related to this project will be the responsibility of the Client. 9. Project Administration - This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. L:\Secure DCS\Administration\AGREE\PROF\ALO 2024 IDOT CSVI.doc Exhibit B 2024 Commerical Service Vertical Infrastructure Waterloo Regional Airport Waterloo, Iowa IDOT Project No. 91200ALO240 / Contract No. CNTRT-00005819 Engineering Services Consultant Cost Summary Direct Labor Cost Category Hours Rate/Hour Amount Senior Professional 8 $103.65 $829.20 Project Professional 26 $80.55 $2,094.30 Staff Professional 48 $58.20 $2,793.60 Professional 0 $36.60 $0.00 CADD Operator II 8 $39.35 $314.80 CADD Operator I 0 $20.25 $0.00 Senior Technician 0 $45.15 $0.00 Technician 0 $33.30 $0.00 Project Support 12 $36.62 $439.44 $6,471.34 102 Payroll Burden and Overhead Costs 125.50% $8,121.53 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 500 0.670 335.00 Per Diem 0 60.00 0.00 Lodging 0 110.00 0.00 B/W Copies 1,000 0.06 60.00 Color Copies 50 0.22 11.00 Plan Copier 200 0.50 100.00 EDM Equipment 0 15.00 0.00 GPS Equipment 0 15.00 0.00 Miscellaneous, Other 200.00 IV. AECOM Estimated Actual Costs V. Subcontract Expense VI. Estimated Actual Costs VII. Fixed Fee (15% of Items I & II) Rounded VIII. Maximum Amount Payable Rounded $706.00 $15,298.87 $15, 300.00 $0.00 $15,300.00 $2,200.00 $17,500.00 Exhibit B 2024 Commerical Service Vertical Infrastructure Waterloo Regional Airport Waterloo, Iowa IDOT Project No. 91200AL0240 / Contract No. CNTRT-00005819 Engineering Services Staff Hour Estimate Item No. Description Senior Prof Project Prof Staff Prof Prof CADD Operator II CADD Operator I Senior Technician Technician Project Support Totals 1 Data Collection & Review 2 2 4 2 Project Plans 8 16 8 32 3 Project Specifications 4 4 8 16 4 Estimate of Construction Cost 4 4 5 Quality Review 4 4 6 Bid Assistance 4 2 6 7 Bid Document Interpretation 4 4 8 Resident Review 24 24 9 Construction Administration 2 4 2 8 Total Design Services 8 26 48 0 8 0 0 0 12 102