Loading...
HomeMy WebLinkAboutAECOM - South Business Park Supplemental Scope - 7.1.24AECOM Page 1 CITY OF WATERLOO, IOWA SOUTH BUSINESS PARK PLATTING AND FINAL DESIGN SERVICES SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo ( Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated January 17, 2023, for preliminary engineering service for the South Business Park; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for the South Business Park Platting and Final Design Services of roadway improvements along Ansborough Avenue. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. PROJECT DESCRIPTION This project consists of the development of approximately 210 acres located in the southeast quadrant of the Highway 20 interchange with Ansborough Avenue for the proposed South Business Park in Waterloo, Iowa. The project will include grading, drainage, utilities, roadway and other construction typical of a large -sale development. The development area includes approximately 182 acres zoned Business Park (B-P) and 25 acres zoned Agriculture District (A-1). The project includes recommended improvements to the Highway 20 westbound off -ramp and Ansborough Avenue as proposed in the Traffic Impact Study, as well as the regional detention basin improvements and a sanitary sewer extension from north of Highway 20 to the Business Park. II. SCOPE OF SERVICES The Scope of Services will encompass and include work, services, materials, personnel and supplies necessary to provide platting and final design of improvements for the South Business Park Phase 1. The Design Services will include topographic survey, concept design and grading plan development, preparation of preliminary and final plats, final paving plans, to include improvements to Ansborough Avenue and the Highway 20 westbound off -ramp extension, and off -site utility plans for sanitary sewer and utility coordination to prepare easements for a natural gas main extension. Services will also include assisting the City with a RISE grant application and coordination with stakeholders. Phase 1 Final Design Services The Scope of Services for the Phase 1 Final Design Services is further defined as follows: Geotechnical Engineering and Environmental Review (Tasks 1 — 5) Geotechnical Engineering (Tasks 1 — 2). The soil borings and geotechnical engineering activities will be completed by Terracon Consultants. The scope of geotechnical engineering activities is intended to provide the necessary design recommendations for the grading and paving of the project. The following tasks are included in this scope: Task 1 — Soil Borings. Soil borings will be obtained to determine the subsurface conditions in the development. The number and depth of borings, as well as the number and type of samples obtained, will be sufficient to complete the geotechnical engineering and recommendations for the project. It is anticipated that 10 soil borings will be obtained along the proposed roadway and sanitary sewer alignments at depths of 15 to 30 feet. ,4ECOM Page 2 Task 2 — Geotechnical Engineering, Report, and Recommendations. The geotechnical engineering will include the necessary laboratory testing, classifications, and geotechnical engineering analysis required to develop the final geotechnical recommendations for the project, including subgrade treatment recommendations, estimated shrinkage, and pavement thickness. Boring Location plan and profiles will be developed. Environmental Review (Tasks 3 — 5). These tasks will include environmental investigations required to evaluate the presence of wetlands per US Army Corps of Engineers' requirements and to determine if mitigation is required. If required, stream mitigation credits will be calculated. Additionally, an assessment of potential habitat of federally and state protected species will be conducted. Stantec will perform these tasks. Task 3 — Wetland Boundary Delineation Task 4 — Habitat Assessment Task 5 — Stream Mitigation Determination Concept Design and Plat Development (Tasks 6 — 22). These tasks include the conceptual design development for the South Business Park and the preliminary plat for the City's property and final plat of Phase 1. These tasks will include developing an overall grading plan, horizontal roadway alignments and vertical profiles, conceptual utility layout, lot layout, typical cross -sections, developing a regional detention basin layout including water quality requirements, landscaping renderings, and developing conceptual roundabout layouts at both the Ansborough Avenue and Highway 20 eastbound ramps intersection and the Ansborough Avenue and Dakota Drive intersection for right-of-way determination. Concept Design for South Business Park (Tasks 6 — 15). Task 6 — Develop Conceptual Roadway Alignment of Dakota Drive from Ansborough Avenue to Kimball Avenue Task 7 — Develop Conceptual Future Road Network Alignments (2 Alternatives) Task 8 — Develop Conceptual Future Lot Layouts Task 9 — Develop Conceptual Overall Grading Plan Task 10 — Develop Regional Stormwater Management Plan for Area Bounded By Highway 20, West Shaulis Road, Ansborough Avenue, and Kimball Avenue and Update Modeling for Proposed Site Conditions Task 11 — Develop Conceptual Vertical Roadway Profiles Task 12 — Develop Conceptual Roundabout Layout at Highway 20 Eastbound Ramp Intersection with Ansborough Avenue (Determination of Right -of -Way Needs) Task 13 — Develop Conceptual Roundabout Layout at Dakota Drive with Ansborough Avenue (Determination of Right -of -Way Needs) Task 14 — Concept Landscaping Renderings (3 Concept Renderings and 1 Final Concept Rendering) Task 15 — Develop Connection to Off -Site Sanitary Sewer Collection System Preparation of Preliminary and Final Plats (Tasks 16 — 22). These tasks include the development of a preliminary and final plats for the South Business Park Phase 1. These tasks will include developing right-of-way and easement layouts, preliminary drainage review, preliminary water, sanitary and storm sewer alignments, utility easements, final roadway dimensions, and reserving right-of-way for a future roundabout at the intersection of Ansborough Avenue and the Highway 20 eastbound ramps. Task 16 — Preliminary Plat Task 17 — Right -of -Way and Easement Layouts Task 18 — Preliminary Drainage Review Task 19 — Preliminary Water and Storm and Sanitary Sewer Alignments Task 20 — Preliminary Utility Easements Task 21 — Final Roadway Dimensions Task 22 — Final Plat for Public Improvements ,4ECOM Page 3 Offsite Improvements for South Business Park (Tasks 23 — 66). These tasks include supplemental topographic survey and base mapping and development of the preliminary and final grading, paving and utility plans and specifications for Ansborough Avenue widening, necessary for the South Business Park Phase 1 from the Highway 20 eastbound off -ramp to approximately 600 feet to the south of Dakota Drive, and the addition of 100 feet of left -turn lane on the Highway 20 westbound off -ramp. These tasks will include work necessary to complete the required grading for the additional water quality requirements for the detention basin, paving, and storm sewer plans and specifications for the off -site roadway improvements for the South Business Park Phase 1 development. Included in these tasks will be the typical cross -sections, tabulations and quantities, final roadway plan and profile sheets, intersection details, storm sewer design and tabulations, pavement marking and signing, sanitary sewer improvements north of Highway 20 to the South Business Park, development of landscaping features and Business Park monument signage, construction cost estimate and technical specifications. These tasks will include work necessary to complete the final design, project plans and specifications, and the printing of the documents for a City of Waterloo letting. Supplemental Topographic Survey and Base Mapping (Tasks 23 — 27). These tasks include field surveys which will be completed to supplement the design phase. These tasks will include topographic survey of off -site roadway improvements as well as the area of the regional detention basin and sanitary sewer extension. Task 23 — Project Control Task 24 — Topographic Survey of Highway 20 Westbound Off -ramp Task 25 — Topographic Survey of Regional Detention Basin Area Task 26 — Topographic Survey of Winn Street and Sanitary Sewer Extension Task 27 — Base Mapping Preliminary Grading, Paving Plans, and Utility Plans (Tasks 28 — 35). Task 28 — Develop Preliminary Cost Estimates Task 29 — Title and Legend Sheets (A Sheet) Task 30 — Typical Sections and Details (B Sheets) Task 31 — Plan and Profile Sheets (D Sheets) a. Ansborough Avenue Widening b. Highway 20 Westbound Off -Ramp Extension c. Winn Street Reconstruction (Required for Sanitary Sewer Extension) Task 32 — Drainage and Detention Analysis Task 33 — Storm Sewer and Detention Basin Outlet Details (M Sheets) Task 34 — Sanitary Sewer Design (Off -Site Improvements) (MSA Sheets) Task 35 — Detention Basin Grading Sheets (U Sheets) Final Grading, Paving Plans, and Utility Plans (Tasks 36 — 58). Task 36 — Title and Legend Sheets (A Sheet) Task 37 — Typical Sections and Details (B Sheets) Task 38 — Bid Items and General Notes (C Sheets) a. Bid Item and Quantity Listing b. Estimate Reference Information c. General Notes Task 39 — Tabulations and Quantities (C Sheets) Task 40 — Plan and Profile Sheets (D Sheets) a. Ansborough Avenue Widening b. Highway 20 Westbound Off -Ramp Extension c. Winn Street Reconstruction (Required for Sanitary Sewer Extension) Task 41 — Geometric Layout Sheets (G Sheets) ,4ECOM Page 4 Task 42 — Required Landscaping Design (I Sheets) a. Standard Zoning Landscaping b. Monument Signage at Highway 20/Ansborough c. Monument Signage at Industrial Park Entrance Task 43 — Construction Staging and Traffic Control Sheets (J Sheets) Task 44 — Intersection Details (L Sheets) Task 45 — Storm Sewer and Detention Basin Outlet Details (M Sheets) Task 46 — Sanitary Sewer Design (Off -Site Improvements) (MSA Sheets) Task 47 — Signing and Pavement Markings (N Sheets) Task 48 — Street Lighting (P Sheets) Task 49 — Erosion Control Sheets (NPDES) (RC Sheets) Task 50 — Earthwork Tabulation (T Sheets) Task 51 — Detention Basin Grading (U Sheets) Task 52 — Cross Sections (W Sheets) Task 53 — Quality Control Review Task 54 — Final Revisions Task 55 — Construction Cost Estimate Task 56 — Specifications Task 57 — Printing and Submittals Task 58 — Field Review Project Administration and Meetings (Tasks 59 — 66). These tasks include project administration, assisting the City in development of a RISE Grant application, coordination with stakeholders, utility coordination, developing 2 permanent easements for gas main extension, Iowa DOT coordination, and approximately 14 meetings throughout the project development. These tasks also include pre -letting activities and general project administration. Task 59 — Project Meetings (8) Task 60 — RISE Grant Application Assistance Task 61 — Stakeholder Coordination (Including Potential Developers) (6) Task 62 — Utility Coordination & Gas Main Easements Plats (2) Task 63 — Iowa DOT Coordination Task 64 — Iowa DNR Permits (NPDES and Sanitary Sewer) Task 65 — Pre -Letting Activities Task 66 — Project Administration Construction -Related Services The scope of construction -related services will be determined at the time the services are needed and defined under a future amendment to this agreement. Construction -related services include construction staking, on -site field review, materials testing and contract administration during construction. Exclusions The following tasks are specifically excluded from this scope, but may be added by supplemental agreement if needed: • Roundabout Final Design at Ansborough Avenue and Highway 20 Eastbound Ramps and Ansborough Avenue and Dakota Drive • South Business Park Civil Site Design and Dakota Drive Extension to the East of Ansborough Avenue Preliminary and Final Design ,4ECOM Page 5 III. COMPENSATION Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be integrated with the fees in the original agreement. The estimated fee is Three Hundred Seventy -Nine Thousand Five Hundred Dollars ($379,500.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated January 17, 2023. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: APPROVED FOR CITY OF WATERLOO APPROVED FOR AECOM TECHNICAL SERVICES, INC. By: ate,z- tz By: V eeZ6) Printed Name: Quentin Hart Printed Name: Douglas W. Schindel, P.E Title: Mayor Date: 7/1/2024 Title: Vice President Date: June 27, 2024 L:\Secure_DCSWdministration\AGREE\SUPPLE\WAT South Business Park Supplemental Scope.docx