HomeMy WebLinkAboutBid Tabulation F.Y. 2014 Orange School Sanitary Sewer Extension, Contract No. 816 December 2, 2013 Bid Tab Estimate: $421,270.00 Bid Security Required Bidder Bid Security Bid Amount Hurst & Sons Contractors, Inc. 2425 West 4th Street 5% I 23 Z2-V 1 Waterloo, IA 50701-3949 Holland Contracting r 1400 south 4th Street 5% .( ((7) L( ?- Forest City, IA 50436 Denver Underground & Grading, Inc. 2046 260th Street 00 2 -1-(12 ( c Denver, IA 50622 Reilly Construction Co., Inc. Po Box 99, 110 Main Street 5% #1/ Ossian, IA 52161 Dave Schmitt 250 50th Ave., SW 5% 50 j / 3b Cedar Rapids, IA 52404 0 Pirc Tobin Construction, Inc. a Po Box 160 5 1/66163 Alburnett, IA 52202 Vieth construction Corp. 013 6419 Nordic Dr. ( 5. ) ' 3Z' 3(2l Cedar Falls, IA 50613 ) Peterson Contractors, Inc. Box A 5°/ 3 3 8(30— Reinbeck, IA 50669 / Baker Concrete & Excavating 2203 E Bremer Ave. 50 , f Box 277 i Waverly, IA 50677 Tschiggfrie Excavating �g P.O. Box 3280 � 425 Julien Dubuque Drive �50/� #1-}j3q/Qzq Dubuque, IA 52003 Summers' Enterprise, Inc. - 1776 Buchanan Delaware Ave. o 3`l�1) Vl 8 Masonville, IA 50654 c) Ricklefs Excavating, Ltd. ®� f,4 � 12536 Buffalo Rd. r 0/ 1/ 2 L 3� -(6 Anamosa, IA 52205 q) eetitA ADDENDUM NO. 1 TO THE CONSTRUCTION SPECIFICATION AND CONSTRUCTION PLANS FOR THE F. Y. 2014 ORANGE SCHOOL SANITARY SEWER EXTENSIONS, CONTRACT NO. 816 WATERLOO, IA DATE: November 26,2013 LETTING DATE AND TIME: December 2,2013 4:00 P.M. TO ALL BIDDERS ON THE ABOVE PROJECT: 1. Revise all trench excavation backfill and compaction requirements to a minimum compaction of 90% of standard proctor density in the Construction Plans and Contract Specifications except for compaction within the Hammond Road Right-of-Way which shall not be changed. 2. Revise Bid Reference Note 102 on Sheet 3 of the Construction Plans to require the mounting of chimney seals on the interior of the manhole frame rather than the exterior. 3. Delete Section 6010, 3.01 K.2. Molded Shield from the Contract Specifications. 4. Add the following special Provision to the Special Provisions in the Contract Specifications: 19. WINTER CONSTRUCTION Construction of this project may be temporarily stopped at the Engineer's discretion if weather and/or soil conditions are encountered that in the Engineer's opinion,may be detrimental to the proper completion of the project. Said temporary stoppage shall not change the specified completion date. 5. The Construction Plans and Contract Specifications are hereby changed to delete the use of manhole adjustment rings, and to require that the constructed rim elevation of all manholes be constructed within 6"±of the design manhole rim elevation without the use of adjustment rings. Contractor shall submit all manhole drawings to Engineer for review and said review and approval shall be completed by Engineer and submitted to Contractor prior to any manhole fabrication. 6. Add the following to Bid Reference Note 103 on Sheet 3 of the Construction Plans. Said tap shall be made by core drilling a circular hole of appropriate size for the new sewer pipe, inserting an approved flexible water tight connector and internal expansion sleeve and installing said pipe and materials as per the manufacturer's recommendation in a water tight manner. Concrete collars shall not be used around flexible connectors. ADDENDUM NO. 1 Page 1 of 2 F.Y.2014 ORANGE SCHOOL SANITARY SEWER EXTENSIONS November 26,2013 (Folder\Orange School\Addendum I.doc) 7. Add the following to Bid Item 203 on Sheet 3 of the Construction Plans: Item is to be completed as per the details for ditch check silt fence on IDOT Standard Road Plan EC-201, The bidder shall acknowledge receipt of this Addendum by inserting the number and date in the spaces provided in the Form of Bid or Proposal, Item 6. William J. CI sen, P. E. Wayne Claassen Engineering and Surveying, Inc. ADDENDUM NO. 1 Page 2 of 2 F.Y.2014 ORANGE SCHOOL SANITARY SEWER EXTENSIONS November 26,2013 (Folder\Orange School\Addendum 1.doc)