Loading...
HomeMy WebLinkAboutIowa Dept. of Economic Development-Brownfield Redevelopment Program Application-10.22.2007 /O -; -67 (Z� "1�. a067-- 5/O Michael Tramontina, Director hie I c hangings Iowa Department of Economic Development FY08 Brownfield Program Application Business Development Division Iowa Department of Economic Development Completed forms with attachments should be sent to: E-mail: brownfields@iowalifechanging.com Mail: Iowa Department of Economic Development ATTN: Matt Rasmussen 200 East Grand Avenue Des Moines, Iowa 50309 Fax: 515.242.4795 Questions? Need assistance? Contact Matt Rasmussen, Program Manager at 515.242.4906. PART 1:APPLICANT/SPONSORSHIP/OWNERSHIP INFORMATION Applicant: City of Waterloo Street Address: 715 Mulberry Street City: Waterloo State: Iowa Zip Code: 50703 Contact Person: Donald J. Temeyer, Community Planning and Development Director Telephone Number: (319) 291-4366 Fax Number: (319)291-4262 Email Address:don.temeyer@waterloo-ia.org Signature: Applicant Sponsor(if required): Street Address: City: State: Zip Code: Contact Person: Telephone Number: Fax Number: Email Address: Signature: Property Owner(if different than applicant): Street Address: City: State: Zip Code: Contact Person: Telephone Number: Fax Number: Email Address: Signature: PART 2: TYPE OF APPLICATION (Please check one) ® City or County ❑ Site Owner with Sponsorship of City or County n Non-Site Owner with Title Transfer Agreement ❑ City or County 7 Other with City or County Sponsorship Note:Attach copy of city/county resolution for application and/or sponsorship. If the application is from a non-site owner,please attach the title transfer agreement. 2 PART 3: ELIGIBILITY 1a.) Is the project a brownfield site as defined under Iowa Administrative Code (261) Chapter 65. 2? ®Yes ❑ No 1 b.) Is the proposed site abandoned? EC] Yes ❑ No 1c.) Is the proposed site underutilized? ❑]Yes ❑ No 1d.) Is there evidence of contamination on the proposed site? ®Yes ❑ No 2) Is the site proposed to be included on the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) program list? ❑ Yes ® No 3a.) Does the site have contaminants that can be addressed under the state's Leaking Underground Storage Tank(LUST) program? I I Yes ® No 3b.) Does the site have other non-LUST contaminants that may be involved within the scope of the project? ®Yes ❑ No 4) Is the financial assistance request no more than 25% of the total project cost? ®Yes ❑ No 5) Will the applicant use the proceeds of any assistance received for acquisition, remediation, or redevelopment of brownfield sites? ®Yes ❑ No PART 4: TYPE AND AMOUNT OF ASSISTANCE REQUESTED Amount of assistance requested: $200,000 Total project cost: $2,000,000 Form of Assistance Requested (check appropriate form): ❑ Loan • Forgivable loan ❑ Loan guarantee Grant ❑ Indemnification I Other: Has the Applicant applied for or received funds from any other federal, state, county or city governmental entities? List sources and provided funding status. Yes. The City of Waterloo has established a network of working relationships among Federal, State, and local Government. In addition to critical EPA Brownfield's Assessment funding Waterloo has received to investigate this site, the community has also devoted local option sales tax funding to reconstruct or overlay streets surrounding the subject site (Attachment B). In addition, 3 the City has received a special appropriation for$200,000 for part of the phase I demolition of the former Chamberlain Manufacturing Company site (Attachment B). The estimated cost to raze the dilapidated buildings on the Chamberlain site exceeds $2 million. PART 5: BUSINESS PLAN SECTION 5a. Use of Funds Financing by Source (Use sources as identified in part 5b) Activity Cost Source A Source B Source C Source D Source E Source F Site Investigation Site Remediation Monitoring Site Acquisition Rehabilitation 1,018,000 200,000 200,000 Utilities Other 618,000 Infrastructure Other Other Other Subtotal: New Construction Machinery & Equip Other Subtotal: Total: 1,018,000 200,000 200,000 618,000 5b. Terms of Proposed Financing (Attach documentation verifying all sources of funds) Amount Type Rate Term Source (Include all sources in part 5a) Source A: Brownfield 200,000 Grant/Forgivable Loan The Redevelopment Fund forgivable loan shall have a term of ten (10)years with no principal or interest payments or accruals for years one thou•h 4 ten. Source B: 200,000 City of Waterloo General Funds Source C: City of Waterloo Local Option Tax 618,000 Source D: Source E: Source F: Total: 1,018,000 5 If assistance is awarded, does sufficient funding exist to complete remediation of the site? ® Yes ❑No If no, describe how the project will be completed to effectively redevelop the site. PART 6: PROJECT DESCRIPTION Provide Legal Description of the property: LOGAN DALE HEIGHTS A PARCEL OF LAND LOCATED IN PARTS OF BLKS NOS 1, 10, AND 11 LOGAN DALE HEIGHTS, BLKS 10, 11, 15 AND 16 ENTERPRISE PLACE, BLK 6 NORTH WATERLOO PLACE, THE SW QTR SEC 13 T 89 R 13 AND VAC STREETS AND ALLEYS DESC AS FOL: BEG AT NW COR LOT 16 BLK 10 SAID LOGAN DALE HEIGHTS TH E ALONG SLY LINE ANITA ST DIST OF 138 FT TH N DIST OF 547.46 FT TO NW COR LOT 1 BLK 1 SAID LOGAN DALE HEIGHTS TH E DIST OF 178.05 FT TO NW COR BLK 10 SAID ENTERPRISE PLACE TH N DIST OF 50 FT TO SW COR BLK 9 SAID ENTERPRISE PLACE TH E ALONG NLY LINE VAC LOUISE ST DIST OF 324 FT TO SW COR BLK 8 SAID ENTERPRISE PLACE TH S DIST OF 50 FT TO NW COR BLK 11 SAID ENTERPRISE PLACE TH E ALONG SLY LINE LOUISE ST DIST OF 99.88 FT TH S DIST OF 191.30 FT TH S 37 DEG 41 MIN 53 SEC E DIST OF 380.80 FT TO SW COR BLK 12 SAID ENTERPRISE PLACE TH S DIST OF 204 FT TO NLY LINE BLK 16 SAID ENTERPRISE PLACE TH S 32 DEG 37 MIN 07 SEC W DIST OF 492.37 FT TH S 14 DEG 45 MIN 05 SEC E DIST OF 239.21 FT TH N 76 DEG 47 MIN 05 SEC W DIST OF 14.81 FT TH S 10 DEG 43 MIN 42 SEC W DIST OF 40 FT TO NLY LINE WLOO RR CO TH WLY ALONG A CURVE CONCAVE SLY AND HAVING A RADIUS OF 1838.82 FT AND LONG CHORD BEARING N 84 DEG 36 MIN 33 SEC W DIST OF 342.55 FT TH W ALONG SAID NLY ROW LINE DIST OF 399.21 FT TO ELY LINE E 4TH ST TH N ALONG ELY LINE E 4TH ST DIST OF 188.92 FT TO NW COR LOT 9 BLK 11 SAID LOGAN DALE HEIGHTS TH E DIST OF 119.54 FT TO NE COR LOT 9 BLK 11 SAID LOGAN DALE HEIGHTS TH S DIST OF 149.89 FT TO SE COR LOT 7 BLK 11 SAID LOGAN DALE HEIGHTS TH E DIST OF 14 FT TO SW COR LOT 6 BLK 11 SAID LOGAN DALE HEIGHTS TH N DIST OF 359.80 FT TO SW COR LOT 8 BLK 10 SAID LOGAN DALE HEIGHTS TH W DIST OF 14 FT TO SE COR LOT 9 BLK 10 SAID LOGAN DALE HEIGHTS TH TH N ALONG ELY LINE LOT NOS 9 AND 10 BLK 10 SAID LOGAN DALE HEIGHTS DIST OF 65.03 FT TH W DIST OF 121.40 FT TO ELY LINE E 4TH ST TH N ALONG ELY LINE E 4TH ST A DIST OF 335.28 FT TO PT OF BEG AND ALSO LOT 12 BLK 11 SAID LOGAN DALE HEIGHTS Provide site description*(size, location, current and past activity on site, etc.) The Black Hawk County Assessor's Office lists the site as containing 22.8 acres. The site is located along the east side of East Fourth Street, south of Donald Street and northwest of Gates Park. (See Attachment C). Residence adjoins the Site immediately to the West; parkland and open space surround the Site in other directions. The site has a manufacturing history dating back to the early 1900's. For over a hundred years, the Site was involved in metal fabrication and utilized PCB materials and other hazardous materials and other hazardous materials including solvents, cutting oils, electroplating baths, circuit board washings and heavy metals. The site is currently vacant and owned by the City of Waterloo. *Please attach map and pictures of the site and surrounding area. List the potential known or suspected contamination present on the project site: ® Soil ® Groundwater ❑ Surface Water I I Air ® Other: 6 Does contamination exist throughout the site or in specific areas on the site? Based on a Phase II ESA(see Attachment D), groundwater and soil contamination are present throughout the site. The City of Waterloo continues to work with EPA and the responsible party to determine the exact extent of contamination impact on the site. Does Contamination extend beyond the property boundaries? Based on a supplemental Phase II ESA completed in September 2005 (see Attachement D), groundwater contamination is documented to have migrated on to adjacent properties. The extent to which the surrounding properties have been impacted by this contamination is unknown at this time, however, investigation is currently underway. The City of Waterloo is working with EPA and athe responsible party to determine to what extent the contamination has impacted the surrounding properties. To what degree have the site contaminates and remediation activities been identified by the applicant? (Check all that apply and provide a brief description) Have any of the following been conducted: ® Phase I Environmental Assessment(attach copy) ® Phase I Environmental Assessment(attach copy) ❑ Phase I Environmental Assessment(attach copy) n LUST Investigation Assessment Tier I/and or II (attach copy) Risk Based Corrective Action Plan (attach copy) ® Other: Supplemental Phase II ESA(see Attachment D) Project Implementation: Fully describe the project including acquisition, environmental remediation activities, brownfield redevelopment and a project implementation schedule. (exhibits may be included but not substituted for this narrative which is limited to two pages) The Chamberlain Manufacturing Company ceased operations in Waterloo circa 1994. The site has remained predominantly vacant since the closing. At the request of many of the surrounding residents,the City of Waterloo applied for an EP A Brownfields to start to investigate the perceived environmental issues associated with the former Chamberlain Manufacturing Company(Chamberlain)site. In October 2003,the City of Waterloo received an EPA Brownfields Assessment grant of $300,000 and in May 2004 performed a Phase I Environmental Site Assessment(ESA). The Phase I ESA indicated significant environmental concerns on the site and a Phase II ESA was performed in August 2004. The Phase II indicated contamination was present in both the groundwater and soil on the site.An additional$50,000 was awarded from EPA to continue assessment work at the Site. The former property owner donated the Site to the City of Waterloo in December 2005. Prior to the property transfer, the property owner removed approximately 100 55-gallon barrels of used hydraulic oil and other tanks located throughout the site. The City is working with the Iowa Department of Natural Resources (IDNR) and EPA to determine the extent to which the contamination has impacted the Site, migrated off site and the impact of the surrounding properties. The City has been left with the responsibility to remove the above ground hazards of the dilapitated buildings. The City is in the process of preparing a redevelopment plan for the Site that is compatible with the surrounding property uses and other plans developed for other areas of the city. The former Chamberlain site continues to be a top priority in the City of Waterloo's comprehensive Brownfield redevelopment initiative. The redevelopment of the former Chamberlain site will be an important component to the Hwy 63 corridor redevelopment as well as the redevelopment of the Logan Plaza. The City proposes to utilize Iowa Brownfield's Funding to demolish portions of the former Chamberlain Manufacturing Corporation site, which are deteriorating and collapsing causing a dangerous nuisance to the surrounding community. The former Chamberlain site is surrounded to the east and south by a municipal park and golf course. The properties immediately to the east and north are residential. The structures as they currently exist represent an extreme safety hazard to anyone on the site (see photos in attachment C). The estimated cost of removing the buildings from the Site exceeds$2 million. By removing the stigma associated with this site, the City will oe in a far stronger position to transition this property into an asset that contributes to a more sustainable neighborhood rather than continue to have detrimental impacts to the surrounding area. 7 Project Implementation Schedule: Identify significant project milestone dates. (Start date, midpoint progress check, and project completion date) The project implementation schedule below best demonstrates the sequence of events expected to occur based on the known and anticipated condition of the project site. Milestone Date Site donated to City December 2005 Finalize contract with IDED for Brownfield Redevelopment Program Funding May 2008 Complete Demolition Specifications December 2008 Let Bids for Demolition January 2009 Complete Demolition December 2009 Secure Development Interests in Site 2010 Project Implementation Schedule: Identify signif cant project milestone dates. (Start date, midpoint progress check, and project completion date) PART 7: ESTIMATED COMMUNITY IMPROVEMENT IMPACTS Current assessed value of the brownfield site: $673,000 Project assessed value of the brownfield site after project completion: $250,000(Land Only) As applicable, describe the private investment on the site as a result of the remediation: Once the demolition and necessary remediation of this Site is complete, the City will bank this property for anticipated future development opportunities. Future development of this site will be compatible with existing surrounding properties uses and in conformance with other applicable City plans. As Applicable, List the type of full time job positions,wages and benefits to be paid as a private investment after the brownfield site is redeveloped: It is also difficult to determine the number and type of jobs that could evolve through the redevelopment of the property. It is also difficult to estimate wages and benefits will be extended to prospective employees. However, as a part of the City's desire to prepare this property for future reuse, the City will consider the wages, benefits, and other factors associated with the type of jobs a prospective business might offer prior to the disposition of the subject site. As Applicable, describe any anticipated ancillary(offsite)private and/or public investment that will occur as a result of remediation of the site: The former Chamberlain site is surrounded by predominantly low income, high minority, and residential neighborhoods. These residents have had to bear the indirect and direct adverse effects of this abandoned nuisance property for over the past decade. The site is aesthetically displeasing, contains numerous structurally unsound buildings, is plagued by environmental containments, and has been known to harbor illegal activities. The indirect effects of this site include devaluation of surrounding housing stock, disinvestments in housing stock, reduced value and disinvestments in businesses in the surrounding area, and the detrimental psychological burden on residents, business owners, and patrons in the area. As this site is redeveloped, businesses in the area will be less reluctant to invest and improve their properties knowing that their properties will hold value (versus declining in value). The City has committed nearly$2 million in the reconstruction of the roads that provide access to and from the subject site and plans to target the area surrounding the site for the next six years. Describe the potential for the project to promote viable community reuse and/or economic development in the area of the site: (use a five year timeframe) Once the dilapidated buildings are removed, the site can once again support a use that is compatible to the surrounding property uses. 8 Actual redevelopment of the site will not occur for about two years because of expected site investigation, characterization, risk assessment, cleanup, and demolition time requirements. By year four and five, City expects to see the reinvestment in this site to be economically linked to and foster growth in adjacent economic development areas throughout the City. Is the project located in an economic development enterprise zone? 7 Yes ® No 9