Loading...
HomeMy WebLinkAboutIowa DNR-Construction Permit Application-04.14.2008 Iowa Department of Natural Resources (�-vJ iD' 4'5 Wastewater Section Construction Permit Application SEWAGE TREATMENT AGREEMENT INSTRUCTIONS This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e.,a private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the permit is issued,regardless of whether title to the proposed construction project will be transferred after completion of the project. This agreement is not necessary when a contract for sewage treatment already exists;i.e.,service contracts between municipalities. However,the Department of Natural Resources must be informed in writing that the contractual agreement does exist. APPLICANT ENGINEER OWNER FIRM City of Waterloo,IA JACOBS ADDRESS ADDRESS 715 Mulberry Street,Waterloo,IA 50703 421 Lawrence Drive,DePere,WI 54115 REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE Timothy J.Hurley,Mayor 319-291-4301 Robert W.Reynolds 920-347-1309 PROJECT IDENTIFICATION Flow Equalization Facility-Phase II Expansion OWNER AND SYSTEM RECEIVING WASTES City of Waterloo,Municipal WWTP CERTIFICATE I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the treatment system identified above. SIGNATURE TITLE DATE Mayor AGREEMENT TO PROVIDE SEWAGE TREATMENT I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary sewerage facilities identified above is approved by the owner,and that the owner accepts responsibility for providing adequate treatment of all wastes contributed by this project,in accordance with the provisions of Chapter 455B,Code of Iowa,and the rules of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances,sewer service agreements,or fee systems entered into between the parties. SIGNATURE TYPED OR PRINTED NAME Timothy J.Hurley TIT E PHONE NUMBER DATE Mayor,City of Waterloo 319-291-4301 `/-/q.-0 g, DNR form 29(Nov 00) 542-3219 1 m� a' 1- 2 G O �' q c� �.. � c c._.__�._...... Y F- c_ C t4� N U w s. w Z_._.__0 N w O O p O. E 01 = i G C 3 ,� C U w 7 C C e Q wp w d QC t0 4 N L' O O N cQ,W .Q .0 O>1 C O W R C N .p' iE R-a v O ir 3 Ir W ; .c z m N O O e:w q O) w 8 p m U O E Z ' M O ail Y G C . . - t so w O a. ail Z o . .o > a gg- U L m t c L gaNI L fn C ..._. w - -e...._ .._._.,.._._.__.N 2._.. o_.__._d_.- -_. .d._.._..O... g o o ; o a m Z K K y v �E < W p m m v a a O Z3 c C S. OHO. J a .a°. m N C Q m V a ° O. fA N+ Q >Til w _ 0 IT • U _ o 01 W ° W t a Q W _ ; ; Z t O. ... Oil Cl) O Q C v. N C .'C' /7 Q M q N O z Z` �z a w a ° m m a v CO 0 CC W >° (.1"63 10 0 O U O 0) P 9 ®� ___._a ram__ ..-� ►�� co c et r ▪ CO q CV sr 4 4Y 4V a • el, N O i r N CO S C Cr 0 WQ a)C O 0:::, v W tw O L ''O 0100i rt0+ r, co co 'OD CO CO Op �7 ^. .•-0_p.. O—p TW > t w a O O pj 5� iQ O�O to�.M_.�. 00 a aim m Q ^ m t0 Q - (NI N ° tt 40 •� `- O) 'O Q UCC .c m = li li a v v v [m :c 'sr 'v n o a 0 1 ..,� IL � L f- L '7 IL ,LPL 7 1f- LLt !.c 7 7 7 7 CO + • c r r H F 1 r- t- t€ F-- s� CO CO O ' • W -N tl3 N c '. eD m aD CO m o io CO ,oD CO { co ic0 co Y__—____ a) .l. _ g� ♦ o N .Ca C r. - - ICI 0 o o $ Q € rnd a O3 C r _a b' a' Q 1s" '� N CD oCO W W c = _ c }o III' c c a3 E� v c a E — U _ > t F ^2 !>? LL LL ILL Li_ Li_ u_ C co O }f i 1 1 o w �- to o ro m v m I i it m i1Ap '{t is �' .. .°a' >. �'n to▪ E a co m .o 'C 9 9 'O e,• 'O S 'O -•O i� 'C .a iv v v v v V M m O) O f�. oo p LCL 4S ' a 'rCl fen N i0N ++� co �pb M CO CO Opp i0 N i 1 € CO .� n I 1 Y m o ° w •1 ' c ▪ y a c m ; a w _ y N U o) t'0 d 1 ' 1e 'C lL '~ O :Q.C .0 a, S '� U j i ES t1 m 0 1x : 2 co m a v� I N . F .c m 3 c w a m m a d> tp x 15 Z 2 coz co d O ca y OCC g N C 133'O w m c) > C i° ) .- p u o m co ¢� _ a E d g != a o O w o, .�o. 1 -a 0 o f-- N a eo "' >O p- Y .as 0- `c Q `W .§8 i 3 1 c m aI co ;N H w is w N�o c F- i Q i -- a x m• E 7-6 a > aV o U Ind a a g _ o >. 10 10 CI. cF- ) j o w :Ina c c ft `O m a p I O w c�D =rn CD 'o c E N CO Y - '$ 4- 8. a E . a o o 70. m Z w o E� p°a 2 Y^ 1�W dv j ° 2 a« a o ti S F a 0 a CJ O: gd a. m t ca 5 O CO U 'S O m 'a � o as w w :0 1 'a 1- o o m i g , a i ! 1 1 co I ® ! ® ® o U e- 18 0) 0 Y, N co ':st coI� co O EO N m •f N a.,srY' !V' sr 'p et 'V' et [IL) IL) CO CO .10 p Exhibit 8A Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE A,General Information APPLICANT ENGINEER OWNER FIRM City of Waterloo JACOBS ADDRESS ADDRESS 715 Mulberry Street,Waterloo,IA 50703 421 Lawrence Drive,DePere,WI 54115 REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE Timothy J.Hurley,Mayor 319-291-4301 Robert W.Reynolds,P.E. 920-347-1309 PROJECT IDENTIFICATION ESTIMATED START DATE* ESTIMATED COMPLETION DATE Flow Equalization Plant-Phase II Expansion 5-19-2008 10-3-2008 PLEASE RESPOND TO ALL QUESTIONS YES NO 1. Has an engineering re ort,facilities plan or other information previously been submitted for this project? ❑ El If Yes=> PROJECT IDENTITY DATE SUBMITTED FLOW EQUALIZATION FACILITY-PHASE II 14 April 2008 EXPANSION 2. Does the project and construction permit application,as submitted,follow the recommendations,design loadings,construction schedule,permit limits,and conclusions of the approved engineering report or facilities plan? ® ❑ If No=> Provide the design basis and technical information justifying all changes. 3. Are there three complete sets of plans and specifications accompanying this application? ® El For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design Standard 11.1,two complete sets will be adequate for expeditious approval. For more complex projects, three sets of plans and specifications may be requested. 4. Are approved standard s ecifications a art of this application? ❑ El If Yes=> APPROVED STANDARD SPECIFICATIONS OF DATE APPROVED (municipality or firm) 5. Does each set of plans and specifications or engineering report accompanying this application contain a "professional engineering seal"executed in conformance with 542B.16,Code of Iowa? ® El If No=>Processing will be delayed pending receipt of applicable design schedules and certified plans, specifications or engineering report. 6. Is this a joint wastewater and water supply project? El Eg If Yes=>A construction premit application for the water supply project should be submitted separately to the Water Supply Section. A water supply permit fee may be required. 7. Is the applicant to provide treatment of effluent resulting from this construction? ® El If No=>A Sewage Treatment Agreement(DNR Form 29)executed by the authority providing treatment must accompany this application. 8. Is a new or amended operation permit necessary to use the facilities described in this application? ❑ El If Yes=>A new or amended permit to operate may be requested prior to the receipt of a construction permit. 9. Is any waterline located within 10 feet;or any private or public well,lake,or public recreation area located within 400 feet of the proposed construction? El lA If Yes=>Identify and locate the facility(s)relative to the proposed construction. 10. Will construction inspection be conducted by a licensed engineer employed by the applicant? ❑ El If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION JACOBS 11. Will this project utilize CWSRF loan funds? ❑ CERTIFICATION APPLICANT ENGINEER I certify that I am the authorized representative of the owner and I certify that all aspects of design included in this application state that the project identified above is approved by the owner. conform to applicable standards contained in Chapter 567[AC 64,or that an explanation and justification for any proposed variations from such standards is attached. I am familiar with the � p/ information contained in this application,and to the best of my t7 SIGNA URE DATE -ei/U b knowledge,such information is complete and accurate. J SIGNATU DATE �/ 4- j-2c r *Estimated Construction Start Date: Complete applications must be submitte t12 d s in y advance of the date for starting construction in accordance with Rules 567 RC 60.4 and 64.2 PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM Exhibit 8A Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE A,General Information DOCUMENT CHECKLIST Identify all categories included in this project. Also,identify schedules attached to this application. SCHEDULE INCLUDED IN SUBMITTAL TITLE ATTACHED PROJECT DATE B Collection system ❑ ❑ C Lateral Sewer Extension ❑ ❑ D Trunk&Interceptor Sewer ❑ ❑ E Wastewater Pump Station ❑ ❑ F Treatment Project Site Selection I ❑ 14 April 2008 G Treatment Project Design Data ❑ ❑ HI Schematic Flow Diagram ® ❑ 14 April 2008 H2 Treatment Process Loading and 0 ❑ Removal Efficiency H3 Mechanical Plant Reliability ❑ ❑ I Screening,Grit Removal and Flow El El Measurement J Septic Tank System El El Kl Controlled Discharge Pond ❑ El K2 Aerated Pond 0 ❑ K3 Anaerobic Lagoon ❑ ❑ L Setting Tanks 00 M Fixed Film Reactor—Stationary Media 0 ❑ N Rotating Biological Contactor ❑ ❑ O Aeration Tanks or Basins ❑ ❑ P Gas Chlorination ❑ Q Sludge Digestion and Holding ❑ ❑ RI Sludge Dewatering and Disposal ❑ ❑ R2(A&B) Low Rate Land Application of Sludge ❑ R3 Land Application of Sewage Sludge ❑ ❑ (To be developed) S Land Application of Wastewater 0 ❑ (To be developed) Sewage Treatment Agreement ® ❑ 14 April 2008 Identify any categories included in this project which are not provided in the above list of schedules. DNR form 28A(Apr 04) 542-3129 Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE F,Treatment Project Site Selection DATE PREPARED PROJECT IDENTITY 09 April 2008 Flow Equalization Facility-Phase II Expansion Pt DATE REVISED PROJECT NO. PERMIT NO. 1. Project Location: County Black Hawk Section 4 Township 89 Range 14 Is this a new site? Existing site? or Expansion of existing site? Yes 2. Provide the following as attachments(minimum of three each needed): (a) General plat layout of area within a five mile radius of the project,noting all important features. (U.S.G.S.map may be used). (b) Site layout of area within a 1,500 foot radius of the project with a scale of approximately 1 inch equal to 200 feet,noting project and all features listed in Subrule 567 IAC 64.2(3):inhabitable residences,commercial buildings,inhabitable structures,public shallow wells,public deep wells,private wells,lakes and public impoundments,property lines and rights- of-way,etc. 3. Does the project lie in a floodplain? Yes [] No El Elevation of 100 year flood(MSL) <855 Elevation of 25 year flood(MSL) <855 Will the treatment works structures,including the electrical and mechanical equipment,be protected from physical damage by the 100-year flood? Yes ® No ❑ Will the plant remain operational during the 25-year flood? Yes ® No ❑ Method of flood protection None 4. Minimum distance to high water table II Ft 5. Describe geology of area Flat to Rolling Topography 6. Describe soil conditions Silty Clay and Silty-Sand Overlain by Sand 7. State the minimum distances and direction to: (a) Municipal wells 10,500 Ft Southwest (b) Private wells 8,000 Ft Northeast (c) Residences or Businesses 950 ft to Nearest Residence,850 ft to nearest business (d) Recreation areas 3,000 ft Southwest to George Wyth State Park (e) Other 8. Direction of the prevailing winds Northwest 9. Sulfate content of the raw water supply source 140 mg/l. Identify source City Water 10. Is this area available for expansion? Yes Eg No ❑ If yes,how much? 50% Location of area North and South Identify owner of property City of Waterloo 11. Will site be accessible via an all weather access road? Yes ® No ❑ Type Existing Crushed Stone Drive 12. Source of STP water supply: Maintenance/Cleanup City of Waterloo Potable? Yes ® No ❑ Laboratory/Sanitary N/A Potable? Yes ❑ No ❑ Potable? Yes ❑ No D 13. Receiving Stream City WWTP tributary to Cedar River 7-day 10-year Low Flow cfs. Source of stream flow data Drainage area above site square miles Is stream a dry run intermittent continuous flow Describe downstream usage of the receiving stream DNR form 28F(Apr 04) 542-3099 42'33110"N 42'331TN 42°32'30'N 42'32'O'N 42'3130'N + ; , o �r rV i) i j I :L1 ' ` ` + �� 1 cJ fq ' t r _ ix I :§ 4,/,( ,,,-----.-'--) )..\• \-•-- / i ,I,,,i / 1 1-' in o iV • iZSV� J I ut ,,, ., , , ,, „ A: . '�; `� ,� : -.`-1 Q _ice=_Je 3 S° I y� } i I." tb �� n ems! €° ..... , ,,, ,,,y, - -., _ ......• I I -y "l :` I m 1 1, ,, --' ' —--,• — uQ ._ _.1 I ?'"" �_ t - .�Ni—i' (f. ,pIQ `"_`irk 4.c'i'1 !1 yg �y 'i`'~ •l 4:I 1 ;��i L',1,. C,-, :I �N W /' +IY) `•` r—c kLi ` if . . O*b. c, 11 1 �' - rG_,; rn 'i —k ,1 _I--— _ — i / r: ;/ ‘ \ frill ---- . pp •i y�I w r • 0. S r • aL. ��•�D 1 ti- (� lier��� a r, % . - - ,... 1.1 - . s,....' /.:11 1,,,, 2 .1,.., v. ,:,- li --:' -1- : ,le(I nu ,..,. . .. —- . 44,- .=•• •'' �. _. f! Sp .} 1 .: o ,, i 1.`i;Jl ,a,,,_,. ' .v1,.•/..•/ i `i '' g 4 .'�• F� ' I co g qii r) rI -.-1 "' . 1.:" iy 0 ::!t •,, is .-_r'- 7J/ -, p l� } . % , �"yt' r• + (� K ram .T,�—, ` u }r r _..._ UI 'ie t i `. ,•,p 1,�1 I 1 "4 ' ' t ,_.ilk-- , 'bpi •. ig, { d dp Ig I • 1 ,,,,,..„,.......,„ I.l'i......,J 1.,.:,)7 . ii. _ ri ", ... ,., ,, 1 .,,,..,. ,I. ,__,_•, co �/ —-._""-t I� i \fir v. 4 i ,; � . cni --,4iiise _, it ( 1' ! -1, .. .i. le - . i ,( r. i\v_.'. I, M"� t 4 ti_' I ill I N.OE,EE.Zi• ' N.QE£.Zti NA&LE.ZV N.O:ZE.Z4 N.OF~I.E.lb wv it-'• / _7 trydy • • ,•,' ar`-. —,ems.. F___•'otc�i,.,7;t.. r"� •I A" - " ,,. � • r :- 1 i� 'O RADIUS =�rO • Xe— a"� ¢ P • �+.ey � r,i ms __r �t a; r+ : • 7 .r k ARMY NATIONAL GUARD • k ` •_ .x C r a, RESIDENCE q k s 1. , _ . _ FED EX • _ ig 11L4. ," Z 7 SITE s At i� I. .9!•itt+{' £ a tom. t - '- FLOW :-y.�! _ „r ."Q'^` •..5 .; �= 'ti UNITE-D BEVERAGES I ^'-- •` E.QU, f4. O, .: . t _.ill �" x- � r op i IT'p', '4 I Ir.�' KEYE MOTORSPORTS ' i .R -' . , 1±;4 R aOP RESIDENCE•x 'R. „ : r. 7' 8451C ITERIALSCR �'--.I tes '��� ' ... - :� _ !t� 4P '" .��' � . � •r�'r'� � y - G�[pf ( y -... - c • a� a7 7 r ' a IIVATERLO ERVI M^* q rti ' ...- z '$ '", -ter '`.i` -Copyriphi{C14'd •-'3Gp1 ERIC Inc.3- - -- ter-. • z s�..,-,� �,,' it•ray • t. — —._ _ —, a ..o 0 FIGURE 1 ATTACHMENT B IDNR CONSTRUCTION PERMIT JE JAC0BS SCHEDULE F PRETREATMENT PLANT PHASE II EXPANSION WATERLOO,IOWA APRIL 2008 Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE Hl,Schematic Flow Diagram DATE PREPARED PROJECT IDENTITY 14 April 2008 Flow Equalization Facility-Phase II Expansion IZ17i DATE REVISED PROJECT NO. PERMIT NO. Exist Exist. New — Elev.865.0 Influent Valve Valve Etev 864.0 High Level p Gravi Lift Pit Pit - _ ry Station — New 70 ft Equalization Tank Discharge Existing 46 ft Equalization Tank 350 GPM Max New By-Pass Line Mixer 2, Gravity 2-200 GPM Influent City of Waterloo 1275 GPM Flow Equalization Facility Max Phase ll Expansion a, 2-750 GPM 309,132 gallons DNR form 28H1 (Nov 00) 542-3101 IOWA DEPARTMENT OF NATURAL RESOURCES Wastewater Disposal System Construction Permit Application Fee Form OWNER: City of Waterloo 32-3202 ADDRESS: 715 Mulberry St Waterloo, IA 50703 PROJECT IDENTIFICATION: Fl ow Focal i zrti or Facility — Phase II Expansion City Of Waterloo, IA X $100 Fee enclosed IDNR Cashier's Use Only 0945-542-NPDE-0570 Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources". Place it and the check or money order on top of other Construction Permit Application documents. Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by Iowa Code 455B.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by Iowa statute(HF2540). The fee is$100 for each application,regardless of project size and project type including sanitary sewers, pump stations, treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents necessary to apply for a construction permit (plans, specifications and related application schedules A,F,and G as well as the appropriate schedules identified on page 2 of Schedule A). The construction permitting process is initiated as planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility plans precedes submittal of technical documents necessary to constitute a construction permit application. The application fee is not necessary when submitting a planning document but must accompany construction permit application documents. A fee should accompany each permit application received on or after July 1,2006. Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions regarding the application fee, please contact Wayne Farrand at 515/281-8877 or wayne.farrand@dnr.state.ia.us Signature of owner or representative Telephone or email contact • Send with application to: Iowa Department of Natural Resources,Wastewater Construction Section Wallace State Office Building 502 East 9th Street Des Moines,IA 50319 STATE OF IOWA DEPARTMENT OF NATURAL RESOURCES HENRY A. WALLACE BUILDING DES MOINES, IOWA 50319 CONSTRUCTION PERMIT City of Waterloo PERMIT NO.: 08-428-S 715 Mulberry Street Waterloo, Iowa 50703 FILE: Sewage Attn: Timothy J. Hurley, Mayor RE: Waterloo PROJECT NO: S08-288 In accordance with the provisions of Section 455B.173.3 and 455B.174.4, Code of Iowa, and Rule 567--64.2(455B) of the Iowa Administrative Code, the Director of the Department of Natural Resources does hereby issue a permit for the construction of: A new 70 ft. diameter raw waste equalization tank, with associated piping, and a new chemical feed line to the existing 46 ft diameter raw waste equalization tank. No increase in the design loading capacity of the wastewater treatment system is authorized by issuance of this permit. Construction of the project shall be initiated within one year of issuance of this permit or this permit is no longer valid. Within thirty days after completion of construction, the permit holder shall submit a certification by a registered professional engineer that the project was completed in accordance with the approved project documents. Pursuant to Section 455B.174.4, Code of Iowa, you have the right to appeal any condition of this permit by filing with the Director of the Department of Natural Resources a notice of appeal and request for administrative hearing within thirty days of receipt of this permit. Issuance of this permit in no way relieves the permittee of the responsibility for complying with any other local, state, and federal laws, ordinances, regulations or other requirements applicable to this facility. Please contact Robert Palla at 515/281-8868 with any questions or comments. For the Department of Natural Resources: RICHARD A. LEOPOLD, DIRECTOR / 1 .y. 1/Cti-IV)-L-e-- Fa44.-a-)-1,0‘ • ENVIRONMENTAL SERVICES DIVISION Date: 6,li1,14 l e 0 0 cc: Robert Reynolds, Jacobs, 421 Lawrence Drive, DePere, WI. 54115 DNR Field Office 1 Plan Distribution: 1 Engineer; 1 Field Office; 1 DNR File 66-/ RECEIVED JUN2 6 2196 lc