HomeMy WebLinkAboutHurst Holding Co., Inc.-Construction Permit-07.28.2008 STATE OF IOWA
DEPARTMENT OF NATURAL RESOURCES
HENRY A.WALLACE BUILDING
DES MOINES,IOWA 50319
CONSTRUCTION PERMIT
Hurst Holding Co., Inc PERMIT NO.: 2009-0046-S
Attn: Mr. Don Hurst FILE: City of Waterloo- Sewage
2425 W.4th Street RE: Tower Park Drive Extension
Waterloo, IA 50701 PROJECT NO: S2009-0041
In accordance with the provisions of Section 455B.173.3 and 455B.174.4, Code of Iowa, and Rule
567--64.2(455B) or Rule 567--65.6(455B), or Rule 567--43.3(455B) of the Iowa Administrative Code, the
Director of the Department of Natural Resources does hereby issue a permit for the construction of:
964 linear feet of 8-inch sanitary sewer, 302 linear feet of 12-inch sanitary sewer,manholes
and all related appurtenances necessary to complete the project in accordance with the
approved plans and specifications.
The construction of the project shall be initiated within one year of issuance of this permit or this permit is
no longer valid. Within thirty days after completion of construction, the permit holder shall submit a
certification by a licensed professional engineer that the project was completed in accordance with the
approved project documents.
No construction activities shall be initiated unless an Iowa NPDES General Permit No. 2 for "Storm
water associated with construction activities" is obtained from the department if the site disturbance and
preparation equals to or exceeds one(1)acre.
The issuance of this permit in no way relieves the permittee of the responsibility for complying with any
other local, state,and federal laws,ordinances,regulations or other requirements applicable to this facility.
Pursuant to Section 455B.174.4, Code of Iowa,you have the right to appeal any condition of this permit by
filing with the Director of the Department of Natural Resources a notice of appeal and request for
administrative hearing within thirty days of receipt of this permit.
Contact Marty Jacobs at 515-242-6148 with any questions or comments.
FOR THE DEPARTMENT OF NATURAL RESOURCES
RICHARD A. LEOPOLD, DIRECTOR
pBy 5`
ENV ONMENTAL SERVICES DIVISION
Date: August 27,2008
cc: DNR Field Office#1
DNR Sewage File 6-07-90-0-01
VJ Engineering
City Clerk—Waterloo
Plan Distribution
[1] Applicant; [1] Engineer; [] City of ; [] DNR File; [] Field Office
Iowa Department of Natural Resources Oe- 6 -3
Wastewater Section
Construction Permit Application
SEWAGE TREATMENT AGREEMENT
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e.,a
private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the
permit is issued,regardless of whether title to the proposed construction project will be transferred after completion of the project.
This agreement is not necessary when a contract for sewage treatment already exists;i.e., service contracts between municipalities.
However,the Department of Natural Resources must be informed in writing that the contractual agreement does exist.
APPLICANT ENGINEER
OWNER FIRM
Hurst Holding Co.,Inc. VJ Engineering
ADDRESS ADDRESS
2425 W.4th Street,Waterloo,IA 50701 1501 Technology Pkwy., Cedar Falls, IA 50613
REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE
Don Hurst 319-235-0407 Bruce P. Radue 319-266-5829
PROJECT IDENTIFICATION
Tower Park Drive Extension
OWNER AND SYSTEM RECEIVING WASTES
City of Waterloo
CERTIFICATE
I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified above.
SIGN URE TITLE DATE
0&and' V/P —7/2-/42
AGREEMENT TO PROVIDE SEWAGE TREATMENT
I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary
sewerage facilities identified above is approved by the owner,and that the owner accepts responsibility for providing adequate
treatment of all wastes contributed by this project, in accordance with the provisions of Chapter 455B,Code of Iowa,and the rules
of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances, sewer
service agreements,or fee systems entered into between the parties.
SIGNATURRE�_, TYPED OR PRINTED NAME
Tim Hurley
TITLE PHONE NUMBER DATE
Mayor (319) 291-4301 7/28/08
DNR form 29(Nov 00) 542-3219
- Exhibit 8A
Iowa Department of Natural Resources Wastewater Section
Construction Permit Application
SCHEDULE A,General Information
APPLICANT ENGINEER
OWNER FIRM
Hurst Holding Co.,Inc. VJ Engineering
ADDRESS ADDRESS
2425 W.4th Street, Waterloo,IA 50701 1501 Technology Pkwy.,Cedar Falls, IA 50613
REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE
Don Hurst 319-235-0407 Bruce P.Radue 319-266-5829
PROJECT IDENTIFICATION ESTIMATED START DATE * ESTIMATED COMPLETION DATE
Tower Park Drive Extension Aug, 1,2008 Sept. 1,2008
PLEASE RESPOND TO ALL QUESTIONS YES NO
1. Has an engineering report, facilities plan or other information previously been submitted for this project? ❑ x
If Yes=> PROJECT IDENTITY DATE SUBMITTED
2. Does the project and construction permit application,as submitted,follow the recommendations,design
loadings,construction schedule,permit limits,and conclusions of the approved engineering report or
facilities plan? ❑ ❑
If No=> Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this application? x ❑
For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design
Standard 11.1,two complete sets will be adequate for expeditious approval. For more complex projects,
three sets of plans and specifications may be requested.
4. Are approved standard specifications a part of this application? x ❑
If Yes=> APPROVED STANDARD SPECIFICATIONS OF DATE APPROVED
(municipality or firm)
City of Waterloo
5. Does each set of plans and specifications or engineering report accompanying this application contain a x
"professional engineering seal"executed in conformance with 542B.16,Code of Iowa? ❑
If No=>Processing will be delayed pending receipt of applicable design schedules and certified plans,
specifications or engineering report.
6. Is this a joint wastewater and water supply project? x ❑
If Yes=>A construction premit application for the water supply project should be submitted separately to the
Water Supply Section. A water supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction? ❑ x
If No=>A Sewage Treatment Agreement(DNR Form 29)executed by the authority providing treatment must
accompany this application.
8. Is a new or amended operation permit necessary to use the facilities described in this application? ❑ x
If Yes=>A new or amended permit to operate may be requested prior to the receipt of a construction permit.
9. Is any waterline located within 10 feet;or any private or public well, lake,or public recreation area located
within 400 feet of the proposed construction? ❑ x
If Yes=>Identify and locate the facility(s)relative to the proposed construction.
10. Will construction inspection be conducted by a licensed engineer employed by the applicant? x ❑
If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION
11. Will this project utilize CWSRF loan funds? ❑ x
CERTIFICATION
APPLICANT ENGINEER
I certify that I am the authorized representative of the owner and I certify that all aspects of design included in this application
state that the project identified above is approved by the owner. conform to applicable standards contained in Chapter 567 IAC
64,or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the
information contained in this application,and to the best of my
2/,7 knowledge,such information is complete and accurate.
SIGNATURE AT SIGNATURE DATE
c(2 2-
* Estimated Constructi rt Date: Comp ete applications must be submitted at least 120 days in advance of the date for
starting construction in accordance with Rules 567 IAC 60.4 and 64.2
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
DNR form 28A (Apr 04) 542-3129
Exhibit 8A
Iowa Department of Natural Resources Wastewater Section
Construction Permit Application
SCHEDULE A,General Information
DOCUMENT CHECKLIST
Identify all categories included in this project. Also,identify schedules attached to this application.
INCLUDED IN SUBMITTAL
SCHEDULE TITLE ATTACHED PROJECT DATE
B Collection system x ❑
C Lateral Sewer Extension x ❑
D Trunk&Interceptor Sewer ❑ ❑
E Wastewater Pump Station ❑ ❑
F Treatment Project Site Selection ❑ ❑
G Treatment Project Design Data ❑ ❑
H1 Schematic Flow Diagram ❑ ❑
H2 Treatment Process Loading and ❑ ❑
Removal Efficiency
H3 Mechanical Plant Reliability ❑ ❑
I Screening,Grit Removal and Flow ❑ ❑
Measurement
J Septic Tank System ❑ ❑
K1 Controlled Discharge Pond ❑ ❑
K2 Aerated Pond ❑ ❑
K3 Anaerobic Lagoon ❑ ❑
L Setting Tanks ❑ ❑
M Fixed Film Reactor—Stationary Media ❑ ❑
N Rotating Biological Contactor ❑ ❑
O Aeration Tanks or Basins ❑ ❑
P Gas Chlorination ❑ ❑
Q Sludge Digestion and Holding ❑ ❑
R1 Sludge Dewatering and Disposal ❑ ❑
R2(A&B) Low Rate Land Application of Sludge ❑ ❑
R3 Land Application of Sewage Sludge ❑ ❑
(To be developed)
S Land Application of Wastewater ❑ ❑
(To be developed)
Sewage Treatment Agreement x ❑
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A(Apr 04) 542-3129
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B,Collection system
DATE PREPARED PROJECT IDENTITY DNR USE
07-01-08 Tower Park Drive Extension PROJECT NO.
DATE REVISED
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the
system. If no portion is subject to flooding,state none.
Segment Flooding Protection
None
*2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station,and
3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Segment Segment Segment
Location
NE 1/4, Sec. 9-
88-13
Design capacity,MGD
2.1
Peak Hourly Dry weather Flow
MGD(actual) 0.3
Peak Hourly Wet Weather Flow
MGD(actual) 0.4
*3. Identify treatment facility,the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Water
Pollution Constrol Plant,
Iowa No. 079001,Fed.
No. 0042650
Facility Loading MGD #BOD5/day
Design 34.8 88,000
Average Wet Weather(actual) 24.53 31,500
Peak Hourly Wet Weather(actual) 60+ 48,000+
Provide projected design loading increase,which will be added to this facility as a result of this project.
Design Loading Initial Design Year(?pis) )
Residential service area Acres Acres
Population Persons Persons
Flow(100 GPCD) GPD GPD
BOD5 (0.17#/d/cap) #/day #/day
Industrial service area Acres Acres
Rated flow GPD GPD
BOD5 #/day #/day
Other Commercial 4.0 Acres 30 Acres
Rated Flow 20,000 GPD 150,000 GPD
BOD5 34 #/day 255 #/day
Total BOD5 34 #/day 255 #/day
Total Flow 20,000 GPD 150,000 GPD
Peak Hourly Flow 60,000 GPD 450,000 GPD
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE C,Lateral Sewer Extension
DATE PREPARED PROJECT IDENTITY DNR USE
07-01-08 Tower Park Drive Extension PROJECT NO.
DATE REVISED
PERMIT NO.
1. Design Basis Initial Design Year(L(/Y )
Residential service area Acres Acres
Population Persons Persons
Flow(100 GPCD) GPD GPD
BOD5(0.17#/d/cap) #/day #/day
Industrial service area Acres Acres
Rated Flow GPD GPD
BOD5 #/day #/day
Other Commercial 4.0 Acres 30 Acres
Rated Flow 20,000 GPD 150,000 GPD
BOD5 34 #/day 255 #/day
Total BOD5 34 #/day 255 #/day
Total Flow 20,000 GPD 150,000 GPD
Peak Hourly Flow 60,000 GPD 450,000 GPD
2. Pipe
Diameter 8 Inch 10 Inch 12 Inch
Material ASTM D2680- ASTM D2680-
01 01
Joint ASTM D2680- ASTM D2680-
01 01
Minimum Slope 1.30 % % 0.5
Maximum Manhole Space 375 ft. ft. 302 ft.
Total Sewer Length 964 ft.. ft. 302 ft.
Maximum Cover 13 ft. ft. 13 ft.
Minimum Cover 9 ft. ft. 10 ft.
3. Construction specifications(indicate ASTM No.or other standard included in the specifications). A brief description is required
in each part.
A. Bedding class ASTM Class II,D2321-75 except as
modified by ASTM D2680-01
B. Pipe laying ASTM Class II, D2321-75 except as
modofied by ASTM D2680-01
C. Compaction 95%Standard Proctor Density
D. Manhole ASTM C478,48"Dia.
E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI
F. Infiltration/exfiltration test procedures v-notch weir,televising,or air test
G. Alignment&grade test procedures
(1) During construction: Stake&batter board x Laser x
(2) After construction: Lamping x Other televising
H. Deflection test procedures na
4. Are detailed manhole drawings included: Yes ❑ No El
Typical frame and cover assembly Neenah R-1643
Are manhole covers nonvented: Yes ® No ❑
Manhole diameter 48 in.
Manhole opening diameter 24 in. Material concrete
5. Minimum sewer&water main separation: Horizontal 10 ft. Vertical 18 in.
Are specifications included? no
6. Stream,road,or railroad crossing protection na
Are specifications included? na
.
1_