HomeMy WebLinkAboutDepartment of Interior-Joint Funding Agreement-08.25.2008 t.;S--off'
Form 9-1366 U.S. Department of the Interior Customer No: IA046
(Oct.2005) U.S.Geological Survey Agreement No:09C41A000000018
Joint Funding Agreement Project No: 8591-00100
FOR WATER RESOURCES INVESTIGATIONS TIN#: 42-6005327
Fixed Cost Agreement x Yes I INo
This agreement is entered into as of the 1st day of October,2008 by the U.S.Geological Survey, U.S. Department of the Interior,party of the
first part,and the City of Waterloo,Iowa,party of the second part.
1.The parties hereto agree that subject to the availabilty of appropriations and in accordance with their respective authorities there shall be
maintained in cooperation the continuing support,operation and maintenance of the streamgaging station on the Cedar River at
Waterloo and one additional measurement,hereinafter called the program.The USGS legal authority is 43 USC 36C;43 USC 50;and 43
USC 50b.
2.The following amounts shall be contributed to cover all of the cost of the necessary field and analytical work directly related to this program.
2(b)includes In-Kind Services in the amount of$0.00.
(a) $5,920.00 by the party of the first pail during the period October 1,2008 to September 30,2009
(b) $8,880.00 by the party of the seconc part during the period October 1,2008 to September 30,2009
(c)Additional or reduced amounts by each party dt.ring the above period or succeeding periods as may be determined by mutual
agreement and set forth in an exchange of letters between the parties.
(d)The performance period may be changed by mutual agreement and set forth in an exchange of letters between the parties.
3.The costs of this program may be paid by either party in conformity with the laws and regulations respectively governing each party.
4.The field and analytical work pertaining to this program shall be under the direction of or subject to periodic review by an authorized
representative of the party of the first part.
5.The areas to be included in the program shall be determined by mutual agreement between the parties hereto or their authorized
representatives.The methods employed in the field and office shall be those adopted by the party of the first part to ensure the required
standards of accuracy subject to modification by mutual agreement.
6. During the course of this program,all field and analytical work of either party pertaining to this program shall be open to the inspection of the
other party,and if the work is not being carried on in a mutually satisfactory manner,either party may terminate this agreement upon 60 days
written notice to the other party.
7.The original records resulting from this program will be deposited in the office of origin of those records. Upon request,copies of the original
records will be provided to the office of the other party.
8.The maps,records or reports resulting from this program shall be made available to the public as promptly as possible.The maps,records or
reports normally will be published by the party of the first part. However,the party of the second part reserves the right to publish the results of
this program and, if already published by the party of the first part shall,upon request,be furnished by the party of the first part,at cost,
impressions suitable for purposes of reproduction similar to that for which the original copy was prepared.The maps,records or reports
published by either party shall contain a statement of the cooperative relations between the parties.
9. USGS will issue billings utilizing Department of the Interior Bill for Collection(Form DI-1040).Billing documents are to be rendered annually.
Payments of bills are due within 60 days after the billing date. If not paid by the due date,interest will be charged at the current Treasury rate for
each 30 day period,or portion thereof,that the payment is delayed beyond the due date.(31 USC 3717;Comptroller General File B-212222,
August 23, 1983.).
USGS Point of Contact Customer Point of Contact
Name: Greg Nalley Name: Tim Shea
Address: PO Box 1230 Address: City of Waterloo
Iowa City,IA 52240 3505 Easton Ave,Waterloo,IA 50702
Phone: 319-358-3630 Phone: 319-291-4553
Email: gm usgs.gov 4 Email:
By Date J�r/C3' By Date
Nam . Middlemis-Brown Name: Tim Shea
Title: Center Director Title: Water Su e tendent
By Date By (,`ta. Date 'a5-D
Name: Name:
Title: r rn Liu('to y
Title: n'l sly o I
2