HomeMy WebLinkAboutAmerican Road Maintenance - CO #1 Pavement Rehabilitation 8.5.24CHANGE ORDER NO. 1 Owner: Waterloo Regional Airport, City of Waterloo, Iowa Project: Pavement Rehabilitation Owner's Contract No. FAA AIP Project No. 3-19-0094-053 Contractor: American Road Maintenance Date of Contract Start: April 3, 2023 Date: September 14, 2023 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Contract Quantity Change Percent Change Revised Quantity Amount 2 JOINT AND CRACK REPAIR LF $ 1.15 61,000.0 38,985.0 64% 99,985.0 $ 44,832.75 5 ASPHALT SURFACE TREATMENT SY $ 1.40 156,500.0 (4,866.1) (3%) 151,633.9 $ (6,812.54) 6 PAVEMENT MARKING REMOVAL SF $ 1.00 91,000.0 6,389.5 7% 97,389.5 $ 6,389.50 ? AIRFIELD MARKING (YELLOW- REFLECTIVE -WATERBORNE) SF $ 0.65 5,000.0 (295.0) (6%) 4,705.0 $ (191.75) S AIRFIELD MARKING (WHITE- REFLECTIVE -WATERBORNE) SF $ 0.65 129,000.0 (12,510.0) (10%) 116,490.0 $ (8,131.50) 9 AIRFIELD MARKING (BLACK-NON- REFLECTIVE -WATERBORNE) SF $ 0.65 4,900.0 (1,191.0) (24%) 3,709.0 $ (774.15) 10 REFLECTIVE MEDIA (TYPE I, GRADATION A) LB $ 1.00 7,750.0 (740.0) (10%) 7,010.0 $ (740.00) 11 SURFACE PAINTED SIGNS SF $ 12.50 - 665.0 665.0 $ 8,312.50 Total Change Order $ 42,884.81 Reason for Change Order: 2 — Quantity adjusted based on field measurements — during the installation of joint and crack sealant the length of cracks found in the field were more than was inventoried during the design survey. Additional joint and crack repair was more extensive on the north 1,000 feet of the project than in the design survey. In addition, many areas for crack repairs that were previously completed showed signs of failure and were added to the construction contract. The contractor agreed to extend the unit price cost for this additional joint and crack sealing work item. 5 — Quantity adjusted based on field measurements — Less area required asphalt surface treatment than shown in the plans. ALO FAA AIP 3-19-0094-053 CO-1 Project No — 60695167 1 6 — Quantity adjusted based on field measurements — additional pavement marking removals were required at the areas on Taxiway B and B-1 to provide pavement markings within the runway hold area with the same reflectivity and paint coverage. 7 — Quantity adjusted based on field measurements 8 — Quantity adjusted based on field measurements — not all reflective white paint required remarking as shown in the plans. 9 — Quantity adjusted based on field measurements — black paint was not used to the quantity identified in the plans. 10 — Quantity adjusted based on field measurements — reflective media quantity was reduced with the reduction in yellow and white pavement markings. 11 — Quantity added based on field measurements — Runway surface painted hold position signs were not originally included in the contract documents. Surface painted signs were placed on Taxiway A east of Runway 12/30 and on Taxiway E. ALO FAA AIP 3-19-0094-053 CO-1 Project No — 60695167 2 CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 543,285.00 Original: 45 Previous C.O.s (DEDUCT):$ 0.00 Previous C.O.s (ADD): 0 This C.O. (ADD): $ 42,884.81 This C.O. (ADD): 0 Contract Price with all REVISED: 45 approved Change Orders: $ 586,169.81 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: S 3 6/6/2024 Engineer (Authorized Signature) Date APPROVED: 8/5/2024 Owner (Authorized Signature) Date ACCEPTED: By: 5/28/24 ontractor (Authorized Signature) Date ALO FAA AIP 3-19-0094-053 CO-1 Project No 60695167 3