Loading...
HomeMy WebLinkAboutPeters Construction - CO #01 Cont. No. 1077 8.5.24Document G701® - 2017 Change Order PROJECT: (Name and address) 22095 Byrnes Park Aquatic Center 801 Campbell Ave. Waterloo, IA 50701 OWNER: (Name and address) City of Waterloo 715 Mulberry St. Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Date: November 6, 2023 ARCHITECT: (Name and address) INVISION Architecture, LLC 900 Mulberry St. Des Moines, IA 50309 CHANGE ORDER INFORMATION: Change Order Number: 001 Date: July 2, 2024 CONTRACTOR: (Name and address) Peters Construction Corporation 901 Black Hawk Road Waterloo, IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) 1. CR 01 Toilet 107/114 layouts - dated 6.11.24 ADD $214.08 2. CR 02 Demolition of wall tile, patching and painting - dated 6.11.24 ADD $1,890.75 3. CR 03 Provide Epoxy with Quartz aggregate for flooring material - dated 4.17.2024 ADD $5,096.02 4. CR 04 Fascia & Beam Covers at Triangular Louvers - dated 4.25.24 ADD $2,076.75 5. CR 05 Guard room casework - dated 6.11.24 ADD $19, 804.92 6. CR 06 Restroom accessories provided by Owner - dated 6.11.24 DEDUCT $(1,270.00) 7. CR 07 Sky Soaker to Sling Soaker - dated 6.13.24 DEDUCT ($20,620.00) 8. CR 08 Pool Equipment provided by Owner - dated 6.20.24 DEDUCT ($9,788.27) The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be decreased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be unchanged $ 7,053,078.55 $ 0.00 7,053,078.55 $ 2,595.75 $ 7,050,482.80 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. AIA Document G701 — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:42:18 ET on 07/10/2024 under Order No.3104238829 which expires on 10/02/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (389ADA49) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. INVISION Architecture, LLC ARCHITECT (Firm name) SIGNATURE Brett Van Zee, AIA PRINTED NAME AND TITLE 07.10.2024 DATE Peters Construction Corporation CONTRACTOR (Firm na SIGNATURE p Oract F ge�k - SYs4:aw.k PRINTED NAME AND TITLE -712-3)k(a DATE City of Waterloo OOCi(F/mazmo / l 1, SIGNED SIGNED S GNATURF uentin Hart, Mayor PmJI5IIIAA(IAND TITLE DATE AIA Document G701 — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:42:18 ET on 07/10/2024 under Order No.3104238829 which expires on 10/02/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA49)