ram 44,d, a°69- e9y7
AECOM
501 Sycamore Street,Suite 222,Waterloo, Iowa 50703
T 319.232.6531 F 319.232.0271 www.aecom.com
GROUND POWER UNIT
ECONOMIC STIMULUS FUNDS
WATERLOO REGIONAL AIRPORT
WATERLOO, IOWA
FAA PROJECT NO. 3-19-0094-36(Proposed)
Project Description - See Attachment
Scope of Services - See Attachment
Compensation
A. Compensation for services under this agreement shall be a lump sum fee of Twenty-One
Thousand Dollars ($21,000.00).
General Conditions
Except as specifically amended by this agreement, services shall be provided in accordance with the
Consultant Services Agreement for the Waterloo Regional Airport between AECOM Technical Services,
Inc., formerly known as Earth Tech, Inc., and the Waterloo Airport Board dated December 1, 2008.
APPROVED APPROVED
CITY OF WATERLOO, IOWA AECOM TECHNICAL SERVICES, INC.
By / By
Xmothy Hurley Joe A. Becker
Date - 3 -0 5' Date March 18, 2009
L:\work\ADMI N\AGREE\PROF\WatAirGroundPowerUnit.doc
ATTACHMENT
FOR THE
GROUND POWER UNIT
ECONOMIC STIMULUS FUNDS
WATERLOO REGIONAL AIRPORT
WATERLOO, IOWA
FAA AIP PROJECT NO. 3-19-0094-XX(PROPOSED)
PROJECT DESCRIPTION
The project is described as the installation of a ground power unit for the boarding bridge at the
Waterloo Regional Airport, Waterloo, Iowa.
II. GENERAL PROJECT SCOPE
The work to be performed by the Consultant shall encompass and include detailed work, services,
materials, equipment and supplies necessary to provide preliminary design, develop final plans,
develop specifications, provide construction cost estimates, and provide bidding and construction-
phase services. Work shall be divided into the following tasks:
A. Design Phase
1. Data Collection and Review. This task consists of the collection of existing data
applicable to this project and related to the proposed work site. The record
drawings of the terminal modernization project and utility information will be
compiled as background information for the project.
2. Preparation of Design Plans. This task consists of the preparation of the design
plan and details for the ground power unit for this project. The plans will set forth
in detail the requirements of the project, together with the common practice of
design and ethical practice of professional engineers. Plans will be prepared in
compliance with current Central Region Federal Aviation Administration
requirements in effect at the time the plans are prepared. This task includes the
preparation of the following:
a. Title Sheet
b. Legend and General Notes
c. Laycut Plans
d. Details
3. Final Project Specifications. This task consists of the preparation of
specifications for the project. The specifications will be in compliance with current
Central Region Federal Aviation Administration requirements in effect at the time
the specifications are prepared.
4. Estimate of Probable Construction Cost. This task consists of the preparation
of a detailed estimate of construction costs based upon the plans and
specifications. This statement of probable construction cost prepared by the
Consultant represents the Consultant's best judgment as a design professional at
the time the estimate is drawn. It is recognized, however, that neither the
Consultant nor the Sponsor has any control over the cost of labor, materials or
Page 2
equipment; over the contractor's method of determining bid prices; or over
competitive bidding or market conditions. Accordingly, the Consultant cannot and
does not guarantee that bids will not vary from any statement of probable
construction cost or other cost estimates prepared by the Consultant.
5. Bid Assistance. This task consists of assisting the Sponsor in advertising for and
receiving bids, analyze the bids received and prepare a recommendation to the
Sponsor for award of contract.
6. Grant Application. This task consists of assisting the Sponsor in preparation of
grant application.
7. Construction-Phase Services. This task consists of providing shop drawing
review, limited on-site observation, processing of pay applications, and providing
project and grant close-out documents.
8. Project Administration. This task consists of office administration and
coordination of the project. Interoffice meetings, general day-to-day administrative
responsibilities, and typing of interoffice memoranda and minutes of meetings are
included in this task. Prepare up to 25 sets of contract documents for distribution
to Sponsor, FAA, plan rooms, suppliers and potential bidders.
L:\work\ADM I NWGREE\PROF\WatAirGroundPowerUnitAttach.doc