Loading...
HomeMy WebLinkAboutIDOT Mobile and Sumner Grant App - 8.5.2024C4IowADoT Application for TRAFFIC CONTROL DEVICE TSIP FUNDS GENERAL INFORMATION DATE: July 26, 2024 INTERSECTION OF MOBILE STREET AND SUMNER STREET OBSOLETE SCHOOL SIGNAL Location / Title of Project REPLACEMENT Applicant City of Waterloo Contact Person Tina Schellhorn Title Associate Traffic Engineer Complete Mailing Address 625 Glenwood Street Waterloo, IA 50703 Phone (319)291-4440 E-Mail Tina.schellhorn@waterloo-ia.org (Area Code) If more than one highway authority is involved in this project, please indicate and fill in the information below (use additional sheets if necessary). Co-Applicant(s) Contact Person Title Complete Mailing Address Phone E-Mail (Area Code) PLEASE COMPLETE THE FOLLOWING PROJECT INFORMATION: Funding Amount Total Safety Cost $ 120,000 Total Project Cost $ Safety Funds Requested $ 120,000 Additional Project Safety Documentation (when available): ❑ Project information sheet(s) or "Risk Score">50% from County/City's Local Road Safety Plan ❑ FHWA SS4A Safety Action Plan or similar comprehensive transportation safety plan Iowa DOT TEAP Study or similar analysis and concept ❑ Project intersection or segment with High or Medium PCR Level (PCR-All or PCR-Severe) from the Iowa DOT Potential for Crash Reduction (PCR) web -based map tool https://per.iowadot.gov/ Potential for Crash Reduction (PCR) Information Intersection ID (1234567890) or Segment ID (1234) Intersection or Segment PCR Level -'sh PCR Level Medium R- PCR- AlI Sever value APPLICATION CERTIFICATION FOR PUBLIC AGENCY To the best of my knowledge and belief, all information included in this application is true and accurate, including the commitment of all physical and financial resources. This application has been duly authorized by the participating public agency(ies). I understand the attached resolution(s), where applicable, binds the participating public agency(ies) to assume responsibility for any additional funds, if required, to complete the project. In addition, the participating public agency(ies) agrees to maintain any new or improved public streets or roadways for a minimum of five years. I understand that, although this information is sufficient to secure a commitment of funds, a firm contract between the applicant and the Department of Transportation is required prior to the authorization of funds. Representing the City of Waterloo Signed: Attest: Ottertail Ilar DIGITALLY SIGH 8/5/2024 Signature Quentin Hart Printed Name Date Signed Arany 9 96y °��"` 8/5/2024 a SIGNEG Signature Date Signed Nancy Printed Name