HomeMy WebLinkAboutPeterson Contractors - CO #15 - Cont. No. 971,130/5
Owner City of Waterloo
Project University Avenue Reconstruction - Phase 3
CHANGE ORDER NO. 15
Date: 7/1/2024
Owner's Contract No.
971 Contractor: Peterson Contractors, Inc.
Date of Contact Start 3/16/2020
Contract Amount: $ 14,387,651.08
You are directed to make the following changes in the Contract Documents. Description:
15-1 MATHIAS LANDSCAPING
15-2 KW ELECTRIC
15-3 SIGNS & DESIGNS
$ 988.61 /LS x 1 LS $ 988.61
$ 1,100.00 /LS x 1 LS $ 1,100.00
$ 20,460.00 /LS x 1 LS $ 20,460.00
TOTAL ADDITIONS $ 22,548.61
Reason for Change Order
15-1- These bid items includes all labor, equipment and supplies to repair the city's monument signage at the University Avenue & Fletcher
15-3 Avenue intersection roundabout.
CONTRACT PRICE
Original:
Previous C.O.s (ADD/DEDUCT)
This C.O. (ADD/DEDUCT)
Contract Price with all approved
Change Orders:
$ 14,387,651.08 Original Completion Date:
$ 546,252.44
$ 22,548.61 Revised Completion Date:
$ 14,956,452.13
CONTRACT TIME
To Substantial To Final
Completion Completion
11/19/20211 11/19/2021
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein,
including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further
time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
APPROVE ae /�r
BY: 0� J (/ fG
Owner (Au
ACCEPTED:
BY:
Contractor (Authorized Signature)
ACCEPTED:
BY:
AECOM
idri/e S74-e/&eir
8/19/2024
Date
8/7/24
Date
8/7/24
Date
AECOM
60630288 I 15
Project No. C.O. No.
EWE' PETERSON CONTRACTORS, INC.
Oh\RACZNIRS
IC EXTRA WORK AUTHORIZATION
ItIOOEti • - IOWA
PO Box A Phone: 319-345-2713
Reinbeck, Iowa 50669 Fax: 319-345-2991
-,0' ''� M ,�
,M l i ♦`
www.petersoncontractors.com
�IIr'
Project Name:
Date:
PCI Job #
Extra Work Autorization #
University Ave. Phase III
J8633
06/19/24
Remarks or Description of Extra Work:
Below is the pricing to repair the damage to the Fletcher Ave. Round About signage.
Item #
Description
Quantity
Units
Base Unit
Rate
Mark Up
Discount
Adjusted Unit
Rate
Total Amount
1
Matthias Landscaping
1.00
LS
$898.74
10.00%
0.00%
$988.61
$988.61
2
KW Electrica
1.00
LS
$1,000.00
10.00%
0.00%
$1,100.00
$1,100.00
3
Signs & Designs
1.00
LS
$18,600.00
10.00%
0.00%
$20,460.00
$20,460.00
0.00%
0.00%
$0.00
$0.00
0.00%
0.00%
$0.00
$0.00
0.00%
0.00%
$0.00
$0.00
0.00%
0.00%
$0.00
$0.00
0.00%
0.00%
$0.00
$0.00
Total Amount:
The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract.
$22,548.61
Work Authorized and Changes Approved by:
Prime Contractor or Owner:
Peterson Contractors, Inc.
By:
BY Chris Fleshner
Title:
Date:
Date: 6/19/2024
Chris Fleshner
From: Kevin Martin <kmartin@kwsign.com>
Sent: Wednesday, June 19, 2024 4:01 PM
To: Chris Fleshner
Subject: Fletcher RAB repair
$1,000.00
Kevin Martin
President - Civil
3192770415(0)
3192401119(M)
LECTRIC, [NC.
100% Employee Owned
1
Report This Email
lAS
LANDSCAPING CO.
Peterson Contractors Inc.
PO Box A
104 Black Hawk St.
Reinbeck, IA. 50669-0155
Description
Estimate
Date
5/14/2024
Project
Fletcher Round About Repair
Qty Cost Total
Labor to dig out on each side of the panels to be replaced.
Dirt stored on site and reused to back fill when panels
replaced
Hardwood Mulch per cubic yard
Contact Doug Matthias with questions
8
100.00
49.37
800.00
98.74
Please call or E-mail if you have any questions.
Subtotal $898.74
Sales Tax (7.0%) $0.00
Total
$898.74
Matthias Landscaping Co. 3170 Wagner Rd. Waterloo IA 50703 319-226-6000 Fax 319-226-6003
Signs & Designs
5600 Nordic Dr
Cedar Falls, IA 50613 US
+1 3192778829
thesignpeople.net
ADDRESS
Dolan Concrete & Masonry Inc.
1140 Fairchild St.
Waterloo, IA 50703
SALES REP
JMB
Estimate 424-102
DATE 04/29/2024
EXPIRATION DATE 05/29/2024
ACTIVITY DESCRIPTION
QTY
RATE
AMOUNT
Fletcher Ave Roundabout
Waterloo, IA
Sign Fletcher Ave Roundabout Repairs
- Remake (3) front panels
- Remake (1) back panel and the large rear
access panel
- Remove and replace (2) vertical frame
tubes
- Remake and replace (1) radius top panel
- Replace 2" wide trim pieces, where
necessary
- All materials will be CORTEN steel
- Hole pattern on new panels will be
adjusted to new locations, because
fasteners are broke off in the existing frame
Contact Signs & Designs to pay.
For quotes over $500, a 50% deposit is required to place
order, balance due upon project completion.
Accepted By
18,600.00
18,600.00
TOTAL
$18,600.00
Accepted Date