Loading...
HomeMy WebLinkAboutVieth Construction - CO #1 Cont. No. 1089CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: FY 2024 Crossroads Blvd Median Improvement, CONTRACT NO. 1089 Date Prepared: 8/8/2024 AMOUNT: $._S21.450.00 Increase TO: Vieth Construction Corporation, Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated 06/14/2024. A. Description of change to be made or extra work to be done: Need to relocate an existing controller from the middle of the island along Crossroads Blvd to the exterior for the purpose of introducing a left turn lane into a new commercial building. This will include the relocation of the controller and service, tying existing lighting feeds to the relocated controller, MidAmerican Coordination, and any pavement restoration required. B. Reason for ordering change or extra work: We are planning to extend the left turn lane from Crossroads Blvd to Penney's St and provide left turn access to a new commercial building. C. Settlement for cost of work to be made as follows: 1001. Lighting Controller Relocation - LS - 1@ $21,450.00 = $21,450.00 Total Net Increase $21,450.00 CITY OF WATERLOO BY: Qaet z 8/19/2024 Mayor '11' Date ATTEST: �e(Cey FeCCFi(e City Clerk 8/19/2024 Date CONTRACTOR G e BY: 7 (/ c� & 2 5L Da PRINTED NAME: Y TITLE: APPROVED: Engineer 08/08/2024 Date