HomeMy WebLinkAboutVieth Construction - FQS - Cont. No. 1085CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2023 GREENBELT REAP PHASE II CONT NO, 1085 DATE PREPARED: AUGUST 14,2024 AMOUNT: $2372.0 DECREASE TO: VIETH CONSTRUCTION CORPORATION CONTRACTOR YOU ARE HEREBY ORDERED TO MAKE THE FOLLOWING CHANGES FROM THE PLANS AND SPECIFICATIONS OR PERFORM THE FOLLOWING EXTRA WORK ON YOUR CONTRACT DATED JUNE 5, 2023 . A. DESCRIPTION OF CHANGE TO BE MADE OR EXTRA WORK TO BE DONE: ADJUST CONSTRUCTION QUANTITIES TO ACTUAL CONSTRUCTION QUANTITIES. B. REASON FOR ORDERING CHANGE OR EXTRA WORK: AS -BUILT QUANTITIES VARIED FOR SOME BID ITEMS. C, SETTLEMENT FOR COST OF WORK TO BE MADE AS FOLLOWS: COMPENSATION ALREADY MADE TO CONTRACTOR THROUGH BID ITEMS, TOTAL DECREASE = $2372.0 atert i 9-tart SIGNED 8/19/2024 BY: VIETH CONSTRUCTION CORPORATION MAYOR DATE CONTRACTOR ATTEST: Re(Cey Fe(ChCe 'sicNEo 8/19/2024 CITY CLERK DATE BY: TITLE: FS'/,14,1„ IQ, to. /II_ APP VED: I ENGIP� &bilk DATE //_5/RY DATE F.Y. 2023 GREENBELT REAP PHASE II, CONT 1085 ITEM NO. ITEM DESCRIPTION UNIT ORIGINAL QUANTITY FINAL QUANTITY QUANTITY DIFFERENCE CONTRACTOR UNIT PRICE CONTRACTOR BID PRICE EXT. INCREASE/ DECREASE 1 SUBGRADE PREPARATION SY 188.0 188.0 0.0 $ 16.0 $ 3,008.0 $ - 2 STRIPPING, SALVAGING, AND SPREADING TOPSOIL SY 504 504.0 0.0 $ 15.0 $ 7,560.0 $ - 3 EXCAVATION, CLASS 10 CY 33.0 33.0 0.0 $ 110.0 $ 3,630.0 $ - 4 EXCAVATION, CLASS 10, BORROW CY 17.0 17.0 0.0 $ 115.0 $ 1,955.0 $ - 5 EXCAVATION, CLASS 10, WASTE CY 8.0 8.0 0.0 $ 105.0 $ 840.0 $ - 6 ROADSTONE, 3/4 INCH, 6 INCHES DEEP TON 8.0 4.4 -3.6 $ 105.0 $ 840.0 $ (378.0) 7 PAD, 5 INCH, PCC, CLASS C (SHELTER & KIOSK) SY 188.0 188.0 0.0 $ 75.0 $ 14,100.0 $ - 8 SIDEWALK, PCC, CLASS C, 4 INCH SY 76.0 75.6 -0.4 $ 65.0 $ 4,940.0 $ (26.0) 9 KAYAK LAUNCH SY 41.7 49.7 8.0 $ 205.0 $ 8,548.5 $ 1,640.0 10 SHELTER STRUCTURE, 20' x 28', COMPLETE LS 1.0 1.0 0.0 $ 67,500.0 $ 67,500.0 $ - 11 KIOSK, 8' X 13', COMPLETE LS 1.0 1.0 0.0 $ 37,500.0 $ 37,500.0 $ - 12 PARK IDENTIFICATION SIGN, LIMESTONE LS 1.0 1.0 0.0 $ 10,000.0 $ 10,000.0 $ - 13 GATE REMOVAL LS 1.0 1.0 0.0 $ 750.0 $ 750.0 $ - 14 GATE, 16 FOOT AGRICULTURAL WITH POSTS AND HARDWARE, COMPLETE LS 1.0 1.0 0.0 $ 2,175.0 $ 2,175.0 $ - 15 BOLLARD INSTALLATION EA 35.0 35.0 0.0 $ 250.0 $ 8,750.0 $ - 16 STRAW WATTLE INSTALLATION, MAINTENANCE, AND REMOVAL LF 345.0 151.0 -194.0 $ 7.0 $ 2,415.0 $ (1,358.0) 17 CONSTRUCTION ENTRANCE INSTALLATION, MAINTENANCE, AND REMOVAL LS 1.0 0.0 -1.0 $ 2,250.0 $ 2,250.0 $ (2,250.0) 18 MOBILIZATION LS 1.0 1.0 0.0 $ 15,000.0 $ 15,000.0 $ - 1A WOOD DECKING, SHELTER LS 1 1.0 0.0 $ 15,000.0 $ 15,000.0 $ - 2A WOOD DECKING, KIOSK LS 1 1.0 0.0 $ 7,500.0 $ 7,500.0 $ - TOTAL= $ 214,261.50 $ (2,372.0) M. PAYMENTS PAY ESTIMATE #1 $ 87,733.93 PAY ESTIMATE #2 $ 88,483.00 PAY ESTIMATE #3 $ 25,078.10 RETAINAGE $ 10,594.48 TOTAL PAYMENTS $ 211,889.5 FINAL AMOUNT ORIGINAL CONTRACT AMOUNT $ 214,261.50 REVISED CONTRACT AMOUNT $ 214,261.50 FINAL QUANTITY SUMMARY $ (2,372.00) FINAL CONTRACT AMOUNT $ 211,889.5