Loading...
HomeMy WebLinkAboutTechline-Professional Services Agreement-07.13.2009 ec Ine. 501 Sycamore Street Suite 101 Waterloo,IA 50703 P:319-233-7701 F:319-235-5211 Contractual Agreement City of Waterloo 2"d Floor City Hall Administrative Work Station Project 715 Mulberry Street Waterloo, Iowa 50703 319-291-4319 Louis Cutwright Date: July 13, 2009 Designer: Bridget Moroney Page 2 Your selections for product are according to the final approved plan dated 6-26-09 Desking Area 1: (Patty) 9' x 7' L Shaped Worksurface 39"high panels in front of workstation w/a transaction counter Box/Box/File Pedestal 30"wide lateral file Pencil drawer Keyboard tray 48"wide overhead storage bin w/door 36"wide overhead storage bin w/door Tackable Panels Paper Management to include paper trays and diagonal trays Task Chair Desking Area 2: (Tracia) 6' x 6'-6"L Shaped Worksurface 68"high side panels 68"high front panel w/half glass 39"high front panel w/transaction counter Box/Box/File pedestal File/File Pedestal Keyboard tray 48"wide overhead storage bin w/door 30"wide open shelf Tackable Panels Paper Management to include paper trays and diagonal trays Small stand for printer(I have mentioned that this stand may be too big for area but she is okay w/that) Task Chair Desking Area 3: (Pauline) 6' x 8' U Shaped Worksurface 39"high panels to front and side of workstation, front panel has transaction counter Box/Box/File pedestal 30"wide lateral file Pencil drawer Keyboard tray 36"wide overhead storage bin w/door Tackable Panels Paper Management to include paper trays and diagonal trays Task Chair Page 3 Desking Area 4: (Craig) 6' x 4' L Shaped Worksurface 30"wide counter, lateral file and overhead storage unit 39"high panels to the front of the workstation 48"high panels to the side of the workstation Box/Box/File pedestal Keyboard tray Tackable Panels Paper Management to include paper trays and diagonal trays Task Chair Desking Area 5 &6: (Joyce&Judy) 6' x 8' U Shaped Worksurface 54"high panels dividing workstation 1-Box/Box/File pedestal 2-30"wide lateral file 2-Pencil drawer 2-Keyboard tray 3-48"wide overhead storage bin w/door 36"open shelf 36"wide overhead storage bin w/door Tackable Panels Paper Management to include paper trays and diagonal trays Task Chair Printer Area: Techline Laminate Cabinets and Countertops 3 Base Cabinets w/Double Doors 1 4 Drawer File 3 Wall Cabinets w/Double Doors 1 Wall Cabinet w/Single door 1 Corner Wall Cabinet w/Open Shelves Furniture will be a Maispace Panel system with laminate and metal storage similar to the existing furnishings on the main floor. Task Chairs will be mid-back height with adjustable arms and feature Synchro-tilt with adjustable tension resistance, pneumatic seat height adjustment and multi-position tilt-lock control. Power and data will be accessed from the structural walls and not included with the panels. Page 4 Scope of Work to Be Performed According to plan date 6-26-09: Techline of Iowa's professional carpenters will assemble accessories and install the new furniture included in this agreement and according to the approved plan. The existing cabinetry, countertops and files will be moved and disposed of by the flooring contractors. Any necessary,electrical work or fixtures will be installed and provided by subcontractors. Project Investment: $24,946.00 If Techline performs work other than work described in the approved plan will modify the contracted amount. Any additional changes made throughout your project will be documented with a written change order and will be presented to you with each change before the material is ordered and/or work is performed. The adjusted amount of the contract will be reflected on your invoice. Terms: All materials are specifically ordered for your project. We cannot accept returns of cabinetry or countertops other than for warranty reasons and product must be presented in the original packing materials. Unapproved modification from the approved original plans and/or damage to the product after delivery will be the owner's responsibility. Payment is due upon receipt of invoice when the work is completed and payable to Techline of Iowa. When an outstanding balance exceeds thirty days from the due date, a finance charge at a rate of 1.5%per month or 18%annum will be assessed to the balance of the account. Tech Line of Iowa is not responsible for any structural or preexisting impairments of the building. If structural or preexisting impairments need to be corrected in order to meet building code or to properly execute the installation of the project requirements,then a change order will be presented as outlined above. Warranty work will be covered by the manufacturers,and is not subject to non-remittance of the account balance. We appreciate the opportunity to serve you! Owner's Acceptance The foregoing terms, specifications and conditions are satisfactory and are hereby agreed to. You are authorized to perform the work as specified and payment will be made according to the contract terms as stated The owner upon signing this agreement represents that he/she has read and understands the agreement and is the owner or lessee of aforesaid premises. Mayor's Signature: /fiJ'tStiAA Date: City of Waterloo, Iowa Techline Of Iowa: � � Date: 7 !3. 09