Iowa Department of Natural Resources riw 4t,o. 9 D o5' _ 1//
Wastewater Section
Construction Permit Application
SEWAGE TREATMENT AGREEMENT
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e.,a
private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the
permit is issued,regardless of whether title to the proposed construction project will be transferred after completion of the project.
This agreement is not necessary when a contract for sewage treatment already exists;i.e., service contracts between municipalities.
However,the Department of Natural Resources must be informed in writing that the contractual agreement does exist.
APPLICANT ENGINEER
OWNER FIRM
Martinson Real Estate Eve. LLC VJ Engineering
ADDRESS ADDRESS
3842 W.Airline Hwy.,Waterloo,IA 50703 1501 Technology Pkwy,Cedar Falls,IA 50613
REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE
Dave Martinson 319-232-4000 Bruce Radue,PE 319-266-5829
PROJECT IDENTIFICATION
South Port
OWNER AND SYSTEM RECEIVING WASTES
City of Waterloo
CERTIFICATE
I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified above.
SIGN TITLE DATE
AGREEMENT TO PROVIDE SEWAGE TREATMENT
I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary
sewerage facilities identified above is approved by the owner,and that the owner accepts responsibility for providing adequate
treatment of all wastes contributed by this project,in accordance with the provisions of Chapter 455B,Code of Iowa,and the rules
of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances,sewer
service agreements,or fee systems entered into between the parties.
SIGNATURE TYPED OR PRINTED NAME
TITLE PHONE N BER14,tf DATE
111'\ay 0 r '7- 0 d
DNR form 29(Nov 00) 542-3219
Exhibit 8A
Iowa Department of Natural Resources Wastewater Section
Construction Permit Application
SCHEDULE A,General Information
APPLICANT ENGINEER
OWNER FIRM
Martinson Real Estate Dev.LLC VJ Engineering
ADDRESS ADDRESS
3842 W.Airline Hwy., Waterloo,IA 50703 1501 Technology Pkwy, Suite 100,Cedar Falls,IA 50613
REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE
Dave Martinson 319-232-4000 Bruce Radue,PE 319-266-5829
PROJECT IDENTIFICATION ESTIMATED START DATE* ESTIMATED COMPLETION DATE
South Port 7/20/09 10/30/09
PLEASE RESPOND TO ALL QUESTIONS YES NO
1. Has an engineering report,facilities plan or other information previously been submitted for this project? ❑
If Yes=> PROJECT IDENTITY DATE SUBMITTED
2. Does the project and construction permit application,as submitted,follow the recommendations,design
loadings,construction schedule,permit limits,and conclusions of the approved engineering report or
facilities plan? ❑ ❑
If No=> Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this application? ® ❑
For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design
Standard 11.1,two complete sets will be adequate for expeditious approval. For more complex projects,
three sets of plans and specifications may be requested.
4. Are approved standard specifications a part of this application? ® ❑
If Yes=> APPROVED STANDARD SPECIFICATIONS OF DATE APPROVED
(municipality or firm)
City of Waterloo
5. Does each set of plans and specifications or engineering report accompanying this application contain a
"professional engineering seal"executed in conformance with 542B.16,Code of Iowa? ® ❑
If No=>Processing will be delayed pending receipt of applicable design schedules and certified plans,
specifications or engineering report.
6. Is this a joint wastewater and water supply project? ® ❑
If Yes=>A construction premit application for the water supply project should be submitted separately to the
Water Supply Section. A water supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction? ❑ ��
If No=>A Sewage Treatment Agreement(DNR Form 29)executed by the authority providing treatment must
accompany this application.
8. Is a new or amended operation permit necessary to use the facilities described in this application? ❑
If Yes=>A new or amended permit to operate may be requested prior to the receipt of a construction permit.
9. Is any waterline located within 10 feet;or any private or public well, lake,or public recreation area located
within 400 feet of the proposed construction? ❑
If Yes=>Identify and locate the facility(s)relative to the proposed construction.
10. Will construction inspection be conducted by a licensed engineer employed by the applicant? ❑
If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION
City of Waterloo Engineering Dept.
11. Will this project utilize CWSRF loan funds? 0 El
CERTIFICATION
APPLICANT ENGINEER
I certify that I am the authorized representative of the owner and I certify that all aspects of design included in this application
state that the project identified above is approved by the owner. conform to applicable standards contained in Chapter 567 IAC
64,or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the
information contained in this application,and to the best of my
knowledge,such information is complete and accurate.
SIGNATU DATE SIGNATURE DATE
_75- 44r.__/2
* Estimated Construction Start Date: Complete applications must be submitted at least 120 days in advance of the date for
starting construction in accordance with Rules 567 IAC 60.4 and 64.2
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
DNR form 28A (Apr 04) 542-3129
Exhibit 8A
Iowa Department of Natural Resources Wastewater Section
Construction Permit Application
SCHEDULE A,General Information
DOCUMENT CHECKLIST
Identify all categories included in this project. Also, identify schedules attached to this application.
INCLUDED IN SUBMITTAL
SCHEDULE TITLE ATTACHED PROJECT DATE
B Collection system ® ❑
C Lateral Sewer Extension ® ❑
D Trunk& Interceptor Sewer ❑ ❑
E Wastewater Pump Station ❑ ❑
F Treatment Project Site Selection ❑ ❑
G Treatment Project Design Data ❑ ❑
H1 Schematic Flow Diagram ❑ ❑
H2 Treatment Process Loading and ❑ ❑
Removal Efficiency
H3 Mechanical Plant Reliability ❑ ❑
I Screening,Grit Removal and Flow ❑ ❑
Measurement
J Septic Tank System ❑ ❑'
K1 Controlled Discharge Pond ❑ ❑
K2 Aerated Pond ❑ ❑
K3 Anaerobic Lagoon ❑ ❑
L Setting Tanks ❑ ❑
M Fixed Film Reactor—Stationary Media ❑ ❑
N Rotating Biological Contactor ❑ ❑
0 Aeration Tanks or Basins ❑ ❑
P Gas Chlorination ❑ ❑
Q Sludge Digestion and Holding ❑ ❑
R I Sludge Dewatering and Disposal ❑ ❑
R2(A&B) Low Rate Land Application of Sludge ❑ ❑
R3 Land Application of Sewage Sludge ❑ ❑
(To be developed)
S Land Application of Wastewater ❑ ❑
(To be developed)
Sewage Treatment Agreement ® ❑
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A(Apr 04) 542-3129
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B,Collection system
DATE PREPARED PROJECT IDENTITY DNR USE
7-8-09 South Port PROJECT NO.
DATE REVISED
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the
system. If no portion is subject to flooding,state none.
Segment Flooding Protection
none
*2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station,and
3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Segment Segment Segment
Location
Airline Hwy.
Lift Station
Design capacity, MGD
1.152
Peak Hourly Dry weather Flow
MGD(actual) 0.143
Peak Hourly Wet Weather Flow
MGD(actual) 0.356
*3. Identify treatment facility,the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Water
Pollution Control Plant
Facility Loading MGD #BOD5/day
Design 34.8 88,000
Average Wet Weather(actual) 24.53 31,500
Peak Hourly Wet Weather(actual) 60+ 48,000+
Provide projected design loading increase,which will be added to this facility as a result of this project.
Design Loading Initial Design Year(2-47/2—)
Residential service area Acres Acres
Population Persons Persons
Flow(100 GPCD) GPD GPD
BOD5(0.17#/d/cap) #/day #/day
Industrial service area 5.4 Acres 22.2 Acres
Rated flow 27,000 GPD 111,000 GPD
BOD5 45.9 #/day 188.7 #/day
Other Acres Acres
Rated Flow GPD GPD
BOD5 #/day #/day
Total BOD5 45.9 #/day 188.7 #/day
Total Flow 27,000 GPD 111,000 GPD
Peak Hourly Flow 102,600 GPD 421,800 GPD
* Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded.
• • Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE C,Lateral Sewer Extension
DATE PREPARED PROJECT IDENTITY DNR USE
7-8-09 South Port PROJECT NO.
DATE REVISED
PERMIT NO.
1. Design Basis Initial Design Year(2c12-- )
Residential service area Acres Acres
Population Persons Persons
Flow(100 GPCD) GPD GPD
BOD5(0.17#/d/cap) #/day #/day
Industrial service area 5.4 Acres 22.2 Acres
Rated Flow 27,000 GPD 111,000 GPD
BOD5 45.9 #/day 188.7 #/day
Other Acres Acres
Rated Flow GPD GPD
BOD5 #/day #/day
Total BOD5 45.9 #/day 188.7 #/day
Total Flow 27,000 GPD 111,000 GPD
Peak Hourly Flow 102,600 GPD 421,800 GPD
2. Pipe
Diameter 8 Inch 10 Inch 12 Inch
Material PVC Truss
Joint Elastomeric
Minimum Slope 0.40 % %
Maximum Manhole Space 273 ft. ft. ft.
Total Sewer Length 428 ft.. ft. ft.
Maximum Cover 17.2 ft. ft. ft.
Minimum Cover 10.9 ft. ft. ft.
3. Construction specifications(indicate ASTM No.or other standard included in the specifications). A brief description is required
in each part.
A. Bedding class ASTM Class II,D2321-75 except as
modified by ASTM D2680-01
B. Pipe laying ASTM Class II, D2321-75 except as
modified by ASTM D2680-01
C. Compaction 95%Standard Proctor Density
D. Manhole ASTM C478,48"dia
E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI
F. Infiltration/exfiltration test procedures v-notch weir,televising,or air test
G. Alignment&grade test procedures
(1) During construction: Stake&batter board yes Laser yes
(2) After construction: Lamping yes _ Other televising
H. Deflection test procedures na
4. Are detailed manhole drawings included: Yes ❑ No
Typical frame and cover assembly Neenah R-1643
Are manhole covers nonvented: Yes ® No ❑
Manhole diameter 48 in.
Manhole opening diameter 24 in. Material concrete
5. Minimum sewer&water main separation: Horizontal 10 ft. Vertical 18 in.
Are specifications included? no
6. Stream,road,or railroad crossing protection na
Are specifications included? na