Loading...
HomeMy WebLinkAboutMunicipal Pipe Tool Company, LLC- Quote-09.14.2009 q—/ cf— d9 MUNICIPAL PIPE TOOL COMPANY LLC QUOTATION 515 5TH STREET HUDSON, IA 50643-0398 Quote Number: 1319 Quote Date: Sep 3, 2009 Page: 1 Voice: 319-988-4205 Fax: 319-988-3506 Quoted To: CITY OF WATERLOO CITY CLERK 715 MULBERRY ST WATERLOO, IA 50703 Customer ID Good Thru Payment Terms ' Sales Rep WATERLcity 10/3/09 Net 30 Days 00PATT Quantity Item Description Unit Price Amount Attn: Jeff Bales RE: Trench less repair under bike trail. Option B.After reviewing Bike t-ail 2 video. CIPP entire MH to MH section due to 18 cracked bells,crack from 128'to 131', 3 capped wye's that caps are cracked, 2.5 sections of clay pipe and line is under bike trail with RR tracks on one side& major highway on other side. Clean line, remove protruding tap, remove concrete in joints, CIPP line entire section, drill grout injection holes, pressure grout void area. Does not indude railroad permits or railroad insurance. Need access to MHs by bike trail. 1.00 Clean line with 5 degree nozzle to prep for 250.00 250.00 — repair. 1.00 Cut protruding tap &remove concrete out 1,000.00 1,000.00 of joints. 375.00 CIPP10 CIPP line 10"Sanitary Sewer-per foot 34.00 12,750.00 4.00 LATERAL Lateral Reinstatements-each 250.00 1,000.00 1.00 Drill grout injection holes after line CIPP 350.00 350.00 lined 1.00 Grout void area. 950.00 950.00 70.00 GROUT-JOINTGALLONS Gallons of Grout-each. Estimate, actual 8.00 560.00 gallons will be invoiced Subtotal 16,860.00 Approved by: Sales Tax /Li-0 TOTAL 16,860:00 Tim Hurley, May r Date i