HomeMy WebLinkAboutIowa Department of Natural Resources-Construction Permit-05.07.2007 . Crt
STATE OF IOWA
DEPARTMENT OF NATURAL RESOURCES
HENRY A.WALLACE BUILDING
DES MOINES,IOWA 50319
CONSTRUCTION PERMIT
Iowa Northern Railway Co. PERMIT NO: 2008-0058-S
P.O. Box 640 FILE: Waterloo,ewage
Greene,Iowa 50636 RE: Bryant Yard SSE
PROJECT NO: S2007-0470
In accordance with the provisions of Section 455B.173.9 and 455B.174.4, Code of Iowa, and Rule
567--64.2(455B) or Rule 567--65.5(455B), or Rule 567--41.12(455B) of the Iowa Administrative Code,the
Director of the Department of Natural Resources does hereby issue a permit for the construction of:
---400 feet of 8 inch sanitary sewer---
The construction of the project shall be initiated within one year of issuance of this permit or this permit is
no longer valid. Within thirty days after completion of construction, the permit holder shall submit a
certification by a licensed professional engineer that the project was completed in accordance with the
approved project documents.
Pursuant to Section 4558.174.4, Code of Iowa, you have the right to appeal any condition of this permit by
filing with the Director of the Department of Natural Resources a notice of appeal and request for
administrative hearing within thirty days of receipt of this permit.
Contact Billy Chen at 515/281-4305 with any questions or comments.
For the Department of Natural Resources
Richard A.Leopold, Director
By: l �
E ONMENTAL PROTECTION DIVISION
Date: August 6, 2007
cc: City Clerk-Waterloo
Field Office No. I
Plan Distribution
[3] Engineer; [0] Field Office; [0] DNR File
S-i-67
Iowa Department of Natural Resources K•-Co
Wastewater Section
Construction Permit Application
SEWAGE TREATMENT AGREEMENT
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e.,a
private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the
permit is issued,regardless of whether title to the proposed construction project will be transferred after completion of the project.
This agreement is not necessary when a contract for sewage treatment already exists;i.e.,service contracts between municipalities.
However,the Department of Natural Resources must be informed in writing that the contractual agreement does exist.
APPLICANT ENGINEER
OWNER FIRM
Iowa Northern Railway Company Iowa Northern Railway Company
ADDRESS ADDRESS
PO Box 640 1330 Sheffield Ave
Greene,Iowa 50636 Waterloo,Iowa 50702
REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE
Bill L.Magee 319-233-9702 Daniel P.Tegtmeier,PE 319-240-8348
PROJECT IDENTIFICATION
i 3 gsa
BRYANT YARD,MOW SHOP AND OFFICES
OWNER AND SYSTEM RECEIVING WASTES
City of Waterloo,Iowa
CERTIFICATE
I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified above.
SIGNA TITLE DATE
,, Assistant General Manager 4/24/07
•
AGREEMENT TO PROVIDE SEWAGE TREATMENT
I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary
sewerage facilities identified above is approved by the owner,and that the owner accepts responsibility for providing adequate
treatment of all wastes contributed by this project,in accordance with the provisions of Chapter 455B,Code of Iowa,and the rules
of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances,sewer
service agreements,or fee systems entered into between the parties.
SIGNATURE TYPED OR PRINTED NAME
TITLE Hc ley
PHONE NUMBER DATE
n/ayt,r
7- 0 7
Exhibit 8A
Iowa Department of Natural Resources Wastewater Section
Construction Permit Application
SCHEDULE A,General Information
APPLICANT ENGINEER
OWNER FIRM
Iowa Northern Railway Company Iowa Northern Railway Company
ADDRESS ADDRESS
PO Box 640,Greene,Iowa 50636 1330 Sheffield Ave,Waterloo,Iowa
REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE
Bill Magee 319-233-9702 Daniel Tegtmeier,PE 319-240-8348 _
PROJECT IDENTIFICATION ESTIMATED START DATE * ESTIMATED COMPLETION DATE
BRYANT YARD,MOW SHOP AND OFFICE SPACE April 2007 May 2007
PLEASE RESPOND TO ALL QUESTIONS YES NO
1. Has an engineering report, facilities plan or other information previously been submitted for this project? ❑
El
If Yes=> PROJECT IDENTITY DATE SUBMITTED
2. Does the project and construction permit application,as submitted,follow the recommendations,design
loadings,construction schedule,permit limits,and conclusions of the approved engineering report or
facilities plan? ® ❑
If No=> Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this application? ® ❑
For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design
Standard 11.1,two complete sets will be adequate for expeditious approval. For more complex projects,
three sets of plans and specifications may be requested.
4. Are approved standard s ecifications a art of this application? ® ❑
If Yes=> APPROVED STANDARD SPECIFICATIONS OF DATE APPROVED
(municipality or firm) �i
Ci of Waterloo, Iowa c> /I f/�9 77
5. Does each set of plans and specifications or engineering report accompanying this application contain a
"professional engineering seal"executed in conformance with 542B.16,Code of Iowa? ® ❑
If No=>Processing will be delayed pending receipt of applicable design schedules and certified plans,
specifications or engineering report.
6. Is this a joint wastewater and water supply project? ❑
PPY
If Yes=>A construction premit application for the water supply project should be submitted separately to the
Water Supply Section. A water supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction? ❑
If No=>A Sewage Treatment Agreement(DNR Form 29)executed by the authority providing treatment must
accompany this application.
8. Is a new or amended operation permit necessary to use the facilities described in this application? El
If Yes=>A new or amended permit to operate may be requested prior to the receipt of a construction permit.
9. Is any waterline located within 10 feet;or any private or public well, lake,or public recreation area located
within 400 feet of the proposed construction? ❑
If Yes=>Identify and locate the facility(s)relative to the proposed construction.
10. Will construction inspection be conducted by a licensed engineer employed by the applicant? ® ❑
If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION
Iowa Northern Railway Company,Daniel Tegtmeier,PE
11. Will this project utilize CWSRF loan funds? ❑
CERTIFICATION
APPLICANT ENGINEER
I certify that I am the authorized representative of the owner and I certify that all aspects of design included in this application
state that the project identified above is approved by the owner. conform to applicable standards contained in Chapter 567 IAC
64,or that an explanation and justification for any proposed
Bill L. Magee variations from such standards is attached. I am familiar with the
Assistant General Manager information contained in this application,and to the best of my
Iowa Northern Railway Company knowledge,such information is complete and accurate.
SIGN - DATE SI ATURE DATE��
,ertr,r 4/24/07 Gx T /r1elu/ / 4/24/07
* Estimated Constructionyr vv 6 3`��Start Date: Complete applications must be submitted at least 120 days in advance of the date for
starting construction in accordance with Rules 567 IAC 60.4 and 64.2
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
DNR form 28A (Apr 04) 542-3129
Exhibit 8A
Iowa Department of Natural Resources Wastewater Section
Construction Permit Application
SCHEDULE A,General Information
DOCUMENT CHECKLIST
Identify all categories included in this project. Also,identify schedules attached to this application.
INCLUDED IN SUBMITTAL
SCHEDULE TITLE ATTACHED PROJECT DATE
B Collection system ® ® 4/24/07
C Lateral Sewer Extension ® ® 4/24/07
D Trunk&Interceptor Sewer 0
E Wastewater Pump Station El El
F Treatment Project Site Selection 0 El
G Treatment Project Design Data El 0
HI Schematic Flow Diagram 0 El
H2 Treatment Process Loading and
Removal Efficiency
H3 Mechanical Plant Reliability El El
I Screening,Grit Removal and Flow El 0
Measurement
J Septic Tank System D El
Kl Controlled Discharge Pond 0 El
K2 Aerated Pond El El
K3 Anaerobic Lagoon El El
L Setting Tanks El 0
M Fixed Film Reactor—Stationary Media
N Rotating Biological Contactor 0 El
O Aeration Tanks or Basins El El
P Gas Chlorination 0 El
Q Sludge Digestion and Holding
R1 Sludge Dewatering and Disposal 0 El
R2(A&B) Low Rate Land Application of Sludge 0 El
R3 Land Application of Sewage Sludge 0 El
(To be developed)
S Land Application of Wastewater
(To be developed)
Sewage Treatment Agreement El 0
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A(Apr 04) 542-3129
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B,Collection system
DATE PREPARED PROJECT IDENTITY DNR USE
4/24/07 BRYANT YARD,MOW SHOP AND OFFICE SPACE PROJECT NO.
DATE REVISED
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the
system. If no portion is subject to flooding,state none.
Segment Flooding Protection
MH S-1 Water Tight Manholes
*2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station,and
3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Segment Segment Segment
Location
Sheffield Ave
8"Truss
Design capacity,MGD
0.42
Peak Hourly Dry weather Flow
MGD(actual) 0.005
Peak Hourly Wet Weather Flow
MGD(actual) 0.011
*3. Identify treatment facility,the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Pollution
Pollution Control Plant _,z'4 Q 7 9 4'/ f=-p DD4A65-a
Facility Loading MGD #BOD5/day
Design 34.8 88,000
Average Wet Weather(actual) 24.53 31,500 ave day
Peak Hourly Wet Weather(actual) 60+ 48,000 peak day
Provide projected design loading increase,which will be added to this facility as a result of this project.
Design Loading Initial Design Year(2026)
Residential service area Acres Acres
Population Persons 10 Persons
Flow(100 GPCD) GPD 1,000 GPD
BOD5(0.17#/d/cap) #/day 170 #/day
Industrial service area Acres Acres
Rated flow GPD GPD
BOD5 #/day #/day
Other Private Utility 5.0 Acres 5.0 Acres
Rated Flow 5,000 GPD 5,000 GPD
BOD5 850 #/day 850 #/day
Total BOD5 850 #/day 1,020 #/day
Total Flow 5000 GPD 6,000 GPD
Peak Hourly Flow 11,3223 GPD 13,152 GPD
* Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded.
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE C,Lateral Sewer Extension
DATE PREPARED PROJECT IDENTITY DNR USE
4/24/07 BRYANT YARD,MOW SHOP AND OFFICE SPACE PROJECT NO.
DATE REVISED
PERMIT NO.
1. Design Basis Initial Design Year( )
Residential service area Acres 2.0 Acres
Population Persons 10 Persons
Flow(100 GPCD) GPD 1,000 GPD
BOD5(0.17#/d/cap) #/day 170 #/day
Industrial service area Acres Acres
Rated Flow GPD GPD
BOD5 #/day #/day
Other Private Utility 5.0 Acres 5.0 Acres
Rated Flow 5,000 GPD 5,000 GPD
BOD5 850 #/day 850 #/day
Total BOD5 850 #/day 1,020 #/day
Total Flow 5,000 GPD 6,000 GPD
Peak Hourly Flow 11,322 GPD 13,152 GPD
2. Pipe
Diameter 8 Inch 10 Inch 12 Inch
Material PVC Truss
Joint Elastomeric
Gasket
Minimum Slope 0.50 % % %
Maximum Manhole Space 400 ft. ft. ft.
Total Sewer Length 400 ft.. ft. ft.
Maximum Cover ft. ft. ft.
Minimum Cover ft. ft. ft.
3. Construction specifications(indicate ASTM No.or other standard included in the specifications). A brief description is required
in each part.
A. Bedding class Class B
B. Pipe laying ASTM C-12
C. Compaction ASTM D-698
D. Manhole ASTM C-478
E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI
F. Infiltration/exfiltration test procedures Air Pressure-as per City of Waterloo Standard Specifications
G. Alignment&grade test procedures
(1) During construction: Stake&batter board Laser X
(2) After construction: Lamping X Other
H. Deflection test procedures Mandrel-as per City of Waterloo Standard Specifications
4. Are detailed manhole drawings included: Yes ❑ No
Typical frame and cover assembly Neehah R-1648
Are manhole covers nonvented: Yes ® No ❑
Manhole diameter 48-inch in.
Manhole opening diameter 24-inch in. Material Precast Concrete
5. Minimum sewer&water main separation: Horizontal 10 ft. Vertical 18
in.
Are specifications included? City of Waterloo Std Spec
6. Stream,road,or railroad crossing protection N/A
Are specifications included? N/A
DNR form 28C(Nov 00) 542-3096
119;)a
7\[orhrn
s Nti
Railway 131.0 Date: April 27,2007
L,nmpany 21 �@
CO t`6Y1�e7
IOWA NORTHERN RAILWAY COMPA% c �G
To: Dennis Gentz,PE c g •1. Daniel Tegtmeier,PE
City of Waterloo Engineering Dept Iowa Northern Railway Co
715 Mullberry Street 1330 Sheffield Ave
Waterloo,IA 50702 Waterloo,Iowa 50702
Ph:319-833-1984
Fax:319-287-9043
Item # Description Quantity
1 Sanitary Sewer Permti to be signed and returned to IANR
2 Plan of Improvements for Approval 3
crease call uan Iegtmeier Cd1.3 rY-z4u-2 345 wnen me rermrrs are ready To ne picked up.monK
vnn
Please contact Customer Service at 1-800-392-3342 with any questions or concerns.
Thank you for your business!
1330 SHEFFIELD AVE,WATERLOO,IOWA 50702
IOWA DEPARTMENT OF NATURAL RESOURCES
Wastewater Disposal System Construction Permit
Application Fee Form
OWNER:_Iowa Northern Railway Company 32-3202
ADDRESS: PO Box 640,Greene,Iowa 50636
PROJECT IDENTIFICATION:
BRYANT YARD,MOW SHOP AND OFFICE SPACE
X $100 Fee enclosed IDNR Cashier's Use Only
0945-542-NPDE-0570
Please sign and return this form with a check or money order payable to "Iowa
Department of Natural Resources". Place it and the check or money order on top of
other Construction Permit Application documents.
Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems
required by Iowa Code 455B.173 and rules in Iowa Administrative Code 567 IAC 64, must be
accompanied by the fee required by Iowa statute(HF2540).
The fee is$100 for each application,regardless of project size and project type including sanitary sewers,
pump stations, treatment units or a combination thereof. The fee shall be submitted with the certified
engineering documents necessary to apply for a construction permit (plans, specifications and related
application schedules A,F,and G as well as the appropriate schedules identified on page 2 of Schedule A).
The construction permitting process is initiated as planning for construction begins. Planning coordination
and submittal of preliminary engineering reports or facility plans precedes submittal of technical documents
necessary to constitute a construction permit application. The application fee is not necessary when
submitting a planning document but must accompany construction permit application documents. A fee
should accompany each permit application received on or after July 1,2006.
Failure to submit a fee with the application may delay the processing of a construction permit. If you have
any questions regarding the application fee, please contact Wayne Farrand at 515/281-8877 or
wayne.farrand@dnr.state.ia.us
j•
.,
Signature of owner or representative CV-
Telephone or email contact 319-233-9702 wmagee.ianr@,mchsi.com
Send with application to:
Iowa Department of Natural Resources,Wastewater Construction Section
Wallace State Office Building
502 East 9th Street
Des Moines,IA 50319
C\S.
• •