Loading...
HomeMy WebLinkAboutDepartment of Natural Resources-Construction Permit-07.09.2007 STATE OF IOWA DEPARTMENT OF NATURAL RESOURCES HENRY A.WALLACE BUILDING DES MOINES,IOWA 50319 CONSTRUCTION PERMIT Lost Island Real Estate,LC PERMIT NO: 2008-0068-S 2225 E. Shaulis Road FILE: Waterloo, Sewage Waterloo, Iowa 50701 RE: Lost Island East Addition SSE PROJECT NO: S2008-0039 In accordance with the provisions of Section 455B.173.9 and 455B.174.4, Code of Iowa, and Rule 567--64.2(455B) or Rule 567--65.5(455B), or Rule 567--41.12(455B) of the Iowa Administrative Code, the Director of the Department of Natural Resources does hereby issue a permit for the construction of: ---903 feet of 8 inch sanitary sewer--- The construction of the project shall be initiated within one year of issuance of this permit or this permit is no longer valid. Within thirty days after completion of construction, the permit holder shall submit a certification by a licensed professional engineer that the project was completed in accordance with the approved project documents. Pursuant to Section 455B.174.4, Code of Iowa, you have the right to appeal any condition of this permit by filing with the Director of the Department of Natural Resources a notice of appeal and request for administrative hearing within thirty days of receipt of this permit. Contact Billy Chen at 515/281-4305 with any questions or comments. For the Department of Natural Resources Richard A. Leopold,Director By:dii /� C.' CX---------- iEIRONMENTAL PROTECTION DIVISION Date: August 9,2007 cc: City Clerk-Waterloo Field Office No. 1 Wayne Claassen-Waterloo Plan Distribution [2] Engineer; [0] Field Office; [0] DNR File Iowa Department of Natural Resources _3-'77 Wastewater Section �, , ().07 Construction Permit Application SEWAGE TREATMENT AGREEMENT INSTRUCTIONS This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e.,a private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the permit is issued,regardless of whether title to the proposed construction project will be transferred after completion of the project. This agreement is not necessary when a contract for sewage treatment already exists;i.e.,service contracts between municipalities. However,the Department of Natural Resources must be informed in writing that the contractual agreement does exist. APPLICANT ENGINEER OWNER FIRM Lost Island Real Estate,LC Wayne Claassen Engineering and Surveying,Inc. ADDRESS ADDRESS 2225 E. Shaulis Rd,Waterloo,IA 50701 P.O.Box 898,Waterloo,IA 50704 REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE Gary Bertch. 319-233-8414 William J.Claassen,P.E. 319-235-6294 PROJECT IDENTIFICATION Lost Island East Addition,Waterloo,Iowa OWNER AND SYSTEM RECEIVING WASTES City of Waterloo CERTIFICATE I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the treatment system identified above. SIGNATURE TITLE DATE Owner AGREEMENT TO PROVIDE SEWAGE TREATMENT I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary sewerage facilities identified above is approved by the owner,and that the owner accepts responsibility for providing adequate treatment of all wastes contributed by this project,in accordance with the provisions of Chapter 455B,Code of Iowa,and the rules of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances,sewer service agreements,or fee systems entered into between the parties. SIGNATURE TYPED OR PRINTED NAME Timothy J.Hurley TITLE ..*"..°?1517- PHONE NUMBER DATE Mayor 319-291-4301 -7-9-07 DNR form 29(Nov 00) 542-3219 Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE A,General Information APPLICANT ENGINEER OWNER FIRM Lost Island Real Estate,LC Wayne Claassen Engineering and Surveying,Inc. ADDRESS ADDRESS 2225 E. Shaulis Rd,Waterloo,IA 50701 2705 University Ave.,Waterloo,IA 50704-0898 REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE Gary Bertch,Owner. 319-233-8414 William J.Claassen,P.E. 319-235-6294 PROJECT IDENTIFICATION ESTIMATED START DATE* ESTIMATED COMPLETION DATE Lost Island East Addition 8/01/07 08/031/07 PLEASE RESPOND TO ALL QUESTIONS YES NO 1. Has an engineering report,facilities plan or other information previously been submitted for this project? ❑ X If Yes=> PROJECT IDENTITY DATE SUBMITTED 2. Does the project and construction permit application,as submitted,follow the recommendations,design loadings,construction schedule,permit limits,and conclusions of the approved engineering report or N facilities plan? A ❑ If No=> Provide the design basis and technical information justifying all changes. ❑ 3. Are there three complete sets of plans and specifications accompanying this application? X ❑ For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design Standard 11.1,two complete sets will be adequate.,for expeditious approval. For more complex projects, three sets of plans and specifications may be requested. 4. Are approved standard specifications a part of this application? X ❑ If Yes=> APPROVED STANDARD SPECIFICATIONS OF DATE APPROVED (municipality or firm) Waterloo 5. Does each set of plans and specifications or engineering report accompanying this application contain a "professional engineering seal"executed in conformance with 542B.16,Code of Iowa? X ❑ If No=>Processing will be delayed pending receipt of applicable design schedules and certified plans, specifications or engineering report. 6. Is this a joint wastewater and water supply project? ❑ X If Yes=>A construction premit application for the water supply project should be submitted separately to the Water Supply Section. A water supply permit fee may be required. 7. Is the applicant to provide treatment of effluent resulting from this construction? ❑ X If No=>A Sewage Treatment Agreement(DNR Form 29)executed by the authority providing treatment must accompany this application. 8. Is a new or amended operation permit necessary to use the facilities described in this application? ❑ X If Yes=>A new or amended permit to operate may be requested prior to the receipt of a construction permit. 9. Is any waterline located within 10 feet;or any private or public well,lake,or public recreation area located within 400 feet of the proposed construction? ❑ X If Yes=>Identify and locate the facility(s)relative to the proposed construction. 10. Will construction inspection be conducted by a licensed engineer employed by the applicant? ❑ X If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION Wayne Claassen Engineering and Surveying,Inc 11. Will this project utilize CWSRF loan funds? El X CERTIFICATION APPLICANT ENGINEER I certify that I am the authorized representative of the owner and I certify that all aspects of design included in this application state that the project identified above is approved by the owner. conform to applicable standards contained in Chapter 567 IAC Hayek Enterprises,Inc.,Norm Hayek,President 64,or that an explanation and justification for any proposed variations from such standards is attached. I am familiar with the information contained in this application,and to the best of my knowledge,such information is complete and accurate. SIGNATURE DATE SIG TURF DATE 6:8/5 f36 A7 *Estimated onstruction Start Date: Complete applications must be submit at least 120 days in advance of the date for starting co struction in accordance with Rules 567 IAC 60.4 and 64.2 PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM DNR form 28A (Apr 04) 542-3129 m Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE A,General Information DOCUMENT CHECKLIST Identify all categories included in this project. Also, identify schedules attached to this application. INCLUDED IN SUBMITTAL SCHEDULE TITLE ATTACHED PROJECT DATE B Collection system X C Lateral Sewer Extension X D Trunk&Interceptor Sewer ❑ E Wastewater Pump Station ❑ ❑ F Treatment Project Site Selection ❑ 0 G Treatment Project Design Data H1 Schematic Flow Diagram ❑ 0 H2 Treatment Process Loading and ❑ 0 Removal Efficiency H3 Mechanical Plant Reliability ❑ 0 I Screening,Grit Removal and Flow 0 0 Measurement J Septic Tank System El ❑ K1 Controlled Discharge Pond 0 0 K2 Aerated Pond 0 0 K3 Anaerobic Lagoon 0 0 L Setting Tanks El ❑ M Fixed Film Reactor—Stationary Media 0 0 N Rotating Biological Contactor 0 0 O Aeration Tanks or Basins 0 ❑ P Gas Chlorination ❑ ❑ Q Sludge Digestion and Holding 0 0 RI Sludge Dewatering and Disposal El 0 R2(A&B) Low Rate Land Application of Sludge ❑ 0 R3 Land Application of Sewage Sludge El 0 (To be developed) S Land Application of Wastewater 0 El (To be developed) Sewage Treatment Agreement ❑ 0 Identify any categories included in this project which are not provided in the above list of schedules. DNR form 28A(Apr 04) 542-3129 Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE B,Collection system DATE PREPARED PROJECT IDENTITY DNR USE 6/30/07 Lost Island East Addition,Waterloo,IA PROJECT NO. DATE REVISED PERMIT NO. 1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the system. If no portion is subject to flooding,state none. Segment Flooding Protection N.A. N.A. *2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station,and 3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data. Segment Segment Segment Location 30"Sink Creek Interceptor Design capacity,MGD 18.72 Peak Hourly Dry weather Flow MGD(actual) 1.1 Peak Hourly Wet Weather Flow MGD(actual) 1.31 *3. Identify treatment facility,the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data. Facility name and number Waterloo Water IA 079001 Fed 0042650 Pollution Control Plant Facility Loading MGD #BOD5/day Design 34.8 88,000 Average Wet Weather(actual) 24.53 31,500 avg day Peak Hourly Wet Weather(actual) 60+ 48,000 peak day Provide projected design loading increase,which will be added to this facility as a result of this project. Design Loading Initial Design Year(2010 ) Residential service area 0 Acres 0 Acres Population 0 Persons 0 Persons Flow(100 GPCD) 0 GPD 0 GPD BOD5(0.17#/d/cap) 0 #/day 0 #/day Industrial service area 0 Acres 0 Acres Rated flow 0 GPD 0 GPD BOD5 0 #/day 0 #/day Other Commercial 0 Acres 13.3 Acres Rated Flow 0 GPD 52,000 GPD BOD5 0 #/day 89 #/day Total BOD5 0 #/day 89 #/day Total Flow 0 GPD 52,000 GPD Peak Hourly Flow 0 GPD 260,000 GPD * Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded. DNR form 28B(Nov 00) 542-3095 Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE C,Lateral Sewer Extension DATE PREPARED PROJECT IDENTITY DNR USE 06/30/07 Lost Island East Addition,Waterloo,IA PROJECT NO. DATE REVISED PERMIT NO. 1. Design Basis Initial Design Year(2010) Residential service area 0 Acres 0 Acres Population 0 Persons 0 Persons Flow(100 GPCD) 0 GPD 0 GPD BOD5 (0.17#/d/cap) 0 #/day 0 #/day Industrial service area 0 Acres 0 Acres Rated Flow 0 GPD 0 GPD BOD5 0 #/day 0 #/day Other Commercial 0 Acres 13.3 Acres Rated Flow 0 GPD 52,000 GPD BOD5 0 #/day 89 #/day Total BOD5 0 #/day 89 #/day Total Flow 0 GPD 52,000 GPD Peak Hourly Flow 0 GPD 260,000 GPD 2. Pipe Diameter 8 Inch 10 Inch 12 Inch Material PVC TRUSS Joint ELASTOMERIC Minimum Slope 0.4 % % % Maximum Manhole Space 287 ft. ft. ft. Total Sewer Length 903 ft.. ft. ft. Maximum Cover 9.5 ft. ft. ft. Minimum Cover 9 ft. ft. ft. 3. Construction specifications(indicate ASTM No.or other standard included in the specifications). A brief description is required in each part. A. Bedding class CLASS 1A,95%STD PROCTOR B. Pipe laying ASTM D3034,D2321, SEC 305-4 C. Compaction ASTM D698 D. Manhole ASTM C476,C443 E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI F. Infiltration/exfiltration test procedures LOW PRESSURE AIR G. Alignment&grade test procedures (1) During construction: Stake&batter board Laser X (2) After construction: Lamping Other TV H. Deflection test procedures NA 4. Are detailed manhole drawings included: Yes X No 0 Typical frame and cover assembly NEENAH R1643 Are manhole covers nonvented: Yes X No 0 Manhole diameter 48 in. Manhole opening diameter 24 in. Material PRECAST PCC&CAST IRON 5. Minimum sewer&water main separation: Horizontal 10 ft. Vertical 18 in. Are specifications included? YES 6. Stream,road,or railroad crossing protection NA Are specifications included? NA DNR form 28C(Nov 00) 542-3096 �Il