Loading...
HomeMy WebLinkAboutAECOM - SA No. 6 - Univ Ave Midway to US 63 - 9.3.24AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO RECONSTRUCTION OF UNIVERSITY AVENUE FROM MIDWAY DRIVE TO U.S. 63 EXCESS RIGHT-OF-WAY PLATTING AND ADDITIONAL CONSTRUCTION -RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 6 WHEREAS, a Professional Services Agreement was entered into between City of Waterloo, Iowa, (Client), and AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated November 7, 2016, for preliminary and final design for reconstruction of University Avenue from Midway Drive to U.S. 63 in Waterloo, Iowa; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 on March 12, 2018, for construction -related services for the University Avenue Phase 1 Project from Greenhill Road to Evergreen Avenue; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 2 on December 17, 2018, for preliminary and final design of the enhancements for the University Avenue Reconstruction Project from Midway Drive to U.S. 63 in accordance with the concepts developed in 2017 by AECOM and City staff; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 3 on April 1, 2019, for construction -related services for the University Avenue Phase 2 Project from Midway Drive to Greenhill Road; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 4 on March 16, 2020, for construction -related services for the University Avenue Phase 3 Project from Evergreen Avenue to Highway 63 and the additional construction -related services for the University Avenue Phase 1 Project; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 5 on November 20, 2023, for platting, additional design for left -turn lane at development site, and additional construction -related services; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 6 for additional excess right-of-way platting and additional construction -related services. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. PROJECT DESCRIPTION The project consists of the creation of developable lots along University Avenue including the excess right-of-way at Fletcher Avenue west of the Black Hawk Creek levee. AECOM will assist the City of Waterloo with platting the property for future developments. The project also includes the associated construction -related services for additional change order work for the project completion including additional construction staking, design and construction inspection. AECOM Page 2 II. SCOPE OF SERVICES The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide survey, platting, design, administration and construction -related services for the project defined above. The Scope of Services is further defined as follows: Excess Right -of -Way Platting Tasks 1-3. These tasks include preparation of a plat of survey to transfer property from the Park Commission to the City of Waterloo and development of Preliminary and Final Plats for the proposed development. Proposed site shall include laying out lots for development. Fletcher Avenue platting shall include determination of plat limits along the Black Hawk Creek Levee and University Avenue, Black Hawk Road, and Falls Avenue right-of-way development as well as the establishment of utility easements. Leland Avenue platting shall include determination of excess right-of-way along Highway 63 near Leland Avenue and Sunnyside Avenue. Existing utilities will be shown, and proposed utility extension routes and easements will be identified. Storm water management plans, building and parking lot layouts and landscaping plans will not be included with the plats. The Fletcher Avenue and Leland Avenue Platting are further defined by the following tasks: Task 1 — Topographical Survey. This will include as -built survey of final site grading and utilities, property pins, section corners and roadway right-of-way. Task 2 — Development of Base Map Task 3 — Plat of Surveys (2) • Leland Avenue Area (1 Plat) • SE Black Hawk Road from University Avenue to Falls Avenue (1 Plat) Project Administration and Meetings Tasks 4-8. These tasks include project administration, coordination and attendance at Planning and Zoning and City Council meetings throughout the project. These tasks also include coordination with USACE for levee limits and Iowa DOT for right-of-way coordination. The following identifies tasks leading to the completion of project administration, meetings and coordination throughout the duration of the project. Task 4 — Planning and Zoning Meetings (3) Task 5 — City Council Meetings (2) Task 6 — USACE Coordination Task 7 — Iowa DOT Coordination Task 8 — Project Administration Construction -Related Services Tasks 9. This task includes providing construction staking, field review, materials testing and contract administration during the construction phase of the University Avenue Project Phases 2 & 3 additional construction -related services required for change order work. This additional change order work includes, but not limited to, the lighting modifications, sign repair, underdeck lighting and landscaping modifications. The Scope of Services is further defined as follows: • Provide construction staking for horizontal and vertical controls for the project. AECOM Page 3 • Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. • Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. • Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. • Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. • Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Assumptions The Client will provide current plat checklists and prepare Property Owner Notifications and mailing address list. Exclusions The following items are not included, but may be added by supplemental agreement if needed: • Storm Water Detention Design for Individual Lots • Building and Parking Lot Layout • Iowa DNR and USACE Permitting • Public Improvement and Utility Design Plans for Plat • Landscaping and Lighting Design Plans for Plats III. COMPENSATION Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be integrated with the fees in the original agreement and Supplemental Agreements No. 2 and No. 5. The total compensation for these services is an estimated fee of Fifty -Four Thousand Eight Hundred Dollars ($54,800.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated November 7, 2016. AECOM Page 4 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 6 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By DSuglas W. Schindel, P.E. Vice President APPROVED FOR CITY OF WATERLOO By: Qaeft ti. 91.art DIGITALLY SIGNED ✓. Quentin Hirt Mayor Date August 30, 2024 Date 9/3/2024 L:\Secure_DCS\Administration\AGREE\SUPPLE\SA6 Wat University Ave Platting Final Design.doc