Loading...
HomeMy WebLinkAboutMidAmerican Energy Agreement - Cont. No. 1077 - 9.3.24MidAmerican ENERGY OBSESSIVELY, AL LENTLESSLY AT YOUR WPYICF. August 28, 2024 Waterloo Leisure Services Attn: Travis Nichols TRAVIS.NICHOLS@WATERLOO-IA.ORG MidAmerican Energy Attn: Amy M Adams - DMCC PO Box 657 Des Moines, IA 50306 Reference: Electric distribution to serve a reconstructed pool at 801 Campbell Ave., Waterloo, IA MX: 3214451 Dear Travis: We are pleased to submit the Refundable Advance for Construction Underground Electric Service Extension Proposal for the above project. This proposal is valid for 90 days and if MidAmerican Energy construction has not commenced within 12 months it may be voided. Please sign and return the proposal as soon as you are ready to commit to the work. You may withhold payment until 30 days before MidAmerican Energy Company is ready to schedule the work. In the meantime, please keep me informed of your schedule. After we have received your payment, we will sign and return a copy of the proposal for your records. If you have any questions, please call me at (515) 252-6701 Sincerely, MidAmerican Energy Company A1119 Alp*, Amy M Adams Customer Project Coordinator Enclosures MidAmerican ENERGY Ol3SESSlVELY, HELENTLESSLYAT YOUR SSRVIcI. MidAmerican Energy Attn: Amy M Adams - DMCC PO Box 657 Des Moines, IA 50306 MIDAMERICAN ENERGY COMPANY REFUNDABLE ADVANCE FOR CONSTRUCTION UNDERGROUND ELECTRIC SERVICE EXTENSION PROPOSAL MX: 3214451 MidAmerican Energy Company ("MidAmerican"), an Iowa corporation and Waterloo Leisure Services ("Applicant"), agree as follows: 1. MidAmerican will extend its electric lines underground to serve 3PHS, 277/480V to a reconstructed pool at 801 Campbell Ave., Waterloo, IA as shown on attached drawings. 2. MidAmerican will furnish the necessary labor and materials required to fulfill its undertaking, as specified above. Such work will commence by MidAmerican as soon as reasonable and practicable after the execution of this Proposal and receipt of Applicant's Advance payment, defined below. MidAmerican will complete the work with reasonable diligence. 3. In consideration of the receipt of a payment in the amount of $27,478.18 From Applicant, which is an advance for construction subject to refund ("Advance"), MidAmerican agrees to construct necessary electric facilities as set forth above. Please submit the Advance payment with Applicant's signed acceptance of this Proposal. If Applicant's acceptance and Advance payment is not received by November 28, 2024 the amount may be subject to change. 4. The Advance shall be subject to refund by MidAmerican to Applicant based upon the following terms and conditions: a. Advances shall not accrue interest and shall be subject to refund from the date of original advance payment. The refund will be based on twelve months usage of the incremental difference between the current annual metered electric service bill of the above Applicant, as described below, and Applicant's future usage through the following annual period, which will start after MidAmerican has completed the required work requested by the customer. The Applicant's current usage is based on 47,320 billed kWh for the twelve-month billing period starting September 22, 2023 through August 22, 2024 for electric meter S64177261, CSS Acct 37930-12016, resulting in the established annual billing of $5,290.58. The customer will receive a one-time refund equal to three times the actual annual revenue, less both fuel expenses and energy efficiency cost recovery charges, for the first 12 months of metered electric service of the above Applicant, as described below. MidAmerican ENERGY Ol3SESSlVELY, HELENTLESSLYAT YOUR SSRVICI. MidAmerican Energy Attn: Amy M Adams - DMCC PO Box 657 Des Moines, IA 50306 b. If additional single-phase customers are connected to the above described line extension within 10 years of the original Advance payment, the above Applicant shall receive refunds equal to three times estimated base revenue for each additional new customer to the extent that such revenue exceeds the additional distribution construction costs incurred by MidAmerican. Base revenue shall be estimated annual revenue, less both fuel expenses and energy efficiency cost recovery charges, based on similarly situated customers. c. Refunds shall be made annually on or about the anniversary date of the original Advance payment. d. Revenue for un-metered private lighting shall not be included in any refund. e. No refunds shall be made for revenue associated with customers connecting after 10 years from the date of the original Advance payment. f. In no case shall the total amount refunded exceed the refundable portion of the Advance payment stated above. g. No refunds shall be made for customers served from a further extension of the above described electric line extension. 5. Applicant shall provide, without cost to MidAmerican, all easements necessary and incidental to such installation and use of MidAmerican's facilities on private property within the area served. If a third party easement is required, any cost associated in obtaining the easement will be paid by the Applicant. 6. Pursuant to MidAmerican's tariff, the Applicant is required to pay actual permit fees. Permit fees are to be paid regardless of whether the applicant is required to pay a Refundable Advance or a Nonrefundable Contribution. Permit fees are not refundable. 7. Applicant shall be responsible for locating and marking all privately owned systems such as water services, culverts, irrigation systems, drainpipes, septic lines, and underground wiring before MidAmerican's construction. 8. All distribution systems or other facilities constructed or installed by MidAmerican under this Proposal shall remain the sole property of MidAmerican and MidAmerican shall determine, at its own judgment, the manner and method of use thereof. MidAmerican also shall determine, at its own judgment, whether to extend the facilities, connect other facilities, or serve other customers from the facilities, subject only to such obligations as MidAmerican shall have assumed in this Proposal; and no other person shall have any right, title, interest or claim, in or to MidAmerican's distribution system or other facilities under this Proposal. MidAmerican ENERGY Of3SESS1VELY, HELENTLESSLYAT YOUR S RVICf. MidAmerican Energy Attn: Amy M Adams - DMCC PO Box 657 Des Moines, IA 50306 9. Applicant shall furnish, install, own and maintain all 4-inch ducts as shown on attached prints. All ducts shall be black w/red stripe or grey in color, PVC type schedule 40 or schedule 40 HDPE coil -able. Applicant shall install ducts a minimum of forty-two (42) inches and a maximum of forty-eight (48) inches below finish grade with capped and staked ends and equipped with pull wires. MidAmerican Energy Company will provide marker balls for the duct ends. These are available at MidAmerican Energy Company's storeroom. Applicant is responsible for correct placement and depth of conduit. Note: No more than ten (10) conduits allowed within the secondary compartment of the transformer pad. Proposed this 28th day of August, 2024 MIDAMERICAN ENERGY COMPANY By: Title: APPLICANT By: Que/ /z art Title: 9/3/2024 DIGITALLY SIGNED Byrnes Park Extention 100964 101 MB._.OMNI.-.L._. 93-4-590 1nn4 TOP STLT POLE 0001 J096 Lam • J O • F —' 0— 0001009..8 01552161E � ACSR ( /0 ACSR 6/1 40T REMOVE TEMP TRANSFORMER BANK REMOVE OH WIRE. EXISTING POLE IN WAY OF SIDEWALK 5-3 WOOD 2 5F05.)48 9 932 • 0001009660 928 • 40-2 WOOD 801-901 922 916 910 INSTALL 45' POLE INTALL CR8M106 FRAME INSTALL GGC523 GUY INSTALL RPC302 RISER 25T FUSE LABEL: 05F05948 HOFFMAN BORE IN APPROX 90' OF 4" CONDUIT <8.8488411111.1i PULL IN APPROX 400' OF 1/0 PARA CUSTOMER TO INSTALL 4" CONDUIT TO ROW INSTALL MEDIUM TRANSFOMER PAD 'BC PHS 150 KVA 480/277 T04772 INSTALL 150KVA 480/277 XFMR INSTALL (4) TCC202'S LABEL 05T04772 jIYIIDAMERICAN ENIERCYCOMPANY. Gust: Waterloo Leisure Services Addr: 801 801 CAMPBELL AVE AVE Crew HQ:WAT City: WATERLOO I X = 1945197 Y = 907061 WMS_REV:3214451-1 Date: 8/8/2024 Scale: 1 IN = X FT Designer:ROBERT D HOLM Job Desc: BYRNES PARK POOL DISCLAIMER OF LIABILITY NOTE: This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, Company. Further, MidAmerican Energy Company disclaims all liability and responsibility for all claims and damages including but not property damage, resulting from any authorized or unauthorized use of, or reliance upon, this drawing for any purpose. please contact MidAmerican Energy limited to, personal injury, death and