HomeMy WebLinkAboutBrock Even Construction FQS Cont. #1082 - 9.16.2024CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT:FY 2024 SIDEWALK REPAIR ASSESSMENT PROGRAM -- ZONE 3, CONTRACT NO. 1082 DATE PREPARED: AUGUST 27, 2024 AMOUNT: $5327.99 DECREASE TO: BROCK EVEN CONSTRUCTION,LLC , CONTRACTOR YOU ARE HEREBY ORDERED TO MAKE THE FOLLOWING CHANGES FROM THE PLANS AND SPECIFICATIONS OR PERFORM THE FOLLOWING EXTRA WORK ON YOUR CONTRACT DATED SEPTEMBER 18, 2023 . A. DESCRIPTION OF CHANGE TO BE MADE OR EXTRA WORK TO BE DONE: ADJUST CONSTRUCTION QUANTITIES TO ACTUAL CONSTRUCTION QUANTITIES. B. REASON FOR ORDERING CHANGE OR EXTRA WORK: AS -BUILT QUANTITIES VARIED FOR SOME BID ITEMS. C. SETTLEMENT FOR COST OF WORK TO BE MADE AS FOLLOWS: COMPENSATION ALREADY MADE TO CONTRACTOR THROUGH BID ITEMS. BY: QCCertari 9/16/2024 MAYOR DATE CONTRACTOR ATTEST: Nlelley Felchle CITY CLERK 9/16/2024 DATE TOTAL DECREASE = $5327.99 BROCK EVEN CONSTRUCTION, LLC BY: DATE TITLE: C� APPROVED: ITY ENGIN ER f/oeVA/ DATE 1 F.Y. 2024 SIDEWALK ASSESSMENT PROGRAM - ZONE 3 FINAL QUANTITY ADJUSTMENT CONTRACT NO. 1082 INCREASE/ DECREASE[1. Nr-� oe, CONTRACTOR BID PRICE EXT. $ 3,346.70I 2,100.00 004OOZ'L $ I 00'006 $ CONTRACTOR UNIT PRICE $ 75.00 $ 350.00 $ 200.00 DIVISION TOTALS QUANTITY DIFFERENCE FINAL QUANTITY OD et 10 03 28.0 6.0 6.0 0.0 Z r 0 p Om Legg N m 2,805.40.E 295.90 29.00 6.00 6 co 25.30 F. D N 0 0 CO EACH EACH EACH EACH EACH LF ITEM DESCRIPTION 4" PCC R/R SIDEWALK 5" PCC R/R SIDEWALK 6" PCC R/R SIDEWALK CLASS A PCC R/R SIDEWALK CLASS F SIDEWALK PATCH ICLEAN WALK WATER VALVE ADJUSTMENT WATER VALVE CAP REPLACEMENT DETECTABLE WARNING SURFACE JOINT SEAL OW F F nnv an co nm $ 7,409.92 26,752.44 to l$ 27,040.60 F 8,295.66 1 co re a PAYMENTS: PAY ESTIMATE#1 PAY ESTIMATE #2 PAY ESTIMATE#3 PAY ESTIMATE #4 PAY ESTIMATE#5 PAY ESTIMATE #6 PAY ESTIMATE #7 PAY ESTIMATE#8 PAY ESTIMATE#9 RETAINAGE TOTAL PAYMENTS: eft to ui 0 FQ Z 0 Q z IA FINAL QTY. ADJUSTMENT