HomeMy WebLinkAboutDNR - Prairie Meadows Estates Combined Sanitary - 9.16.2024IOWA DEPARTMENT OF NATURAL RESOURCE
Wastewater Disposal System Construction Per it
Application Fee Form
Owner Name: Robson Homes Inc.
Address: 5901 WILLIAMS BLVD SW
City, State, Zip: CEDAR RAPIDS, IA 52404
Project Identification: PRAIRIE MEADOW ESTATES FIRST ADDITION
■❑ $100 Fee enclosed
CASHIER'
0945-542-N
32-3202
Owner
S USE
PDE-C
ONLY
P-0570
Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources".
Place it and the check or money order on top of other Construction Permit Application documents.
Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by
Iowa Code 4556.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by
Iowa Code 4556.197 and Iowa Administrative Code 567 IAC 64.16(3)"c".
The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump
stations, treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents
necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well
as the appropriate schedules indentified on page 2 of Schedule A). The construction permitting process is initiated as
planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility plans
precedes submittal of technical documents necessary to constitute a construction permit application. The application
fee is not necessary when submitting a planning document but must accompany construction permit application
documents. A fee should accompany each permit application received on or after July 1, 2006.
Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions
regarding the application fee, please contact Donna Gomm at 515-725-8427 or Donna.Gomm@dnr.iowa.gov
Signature of Owner or Representative:
Printed Name: (logo,-. 1-1-Ctriz " IA_ , c�l� " obSCry-Nl
Telephone or email contact: Q.A Scrn hovxz.5
Mail to:
Iowa Department of Natural Resources
Wastewater Engineering Section
502 East 9th Street
Des Moines, IA 50319-0034
11/2014 cmc
DNR Form 542-1245
Iowa Department of Natural ¶tesources
Wastewater Sectior
Construction Permit Appli
SCHEDULE A, Construction Perm
Exhibit 11A
ration
t Application
APPLICANT
Owner: Robson Homes Inc.
Firm: Snyder & As
ENGINEER
ociates, Inc.
Address: 5901 WILLIAMS BLVD SW CEDAR RAPIDS, IA 52404
Address: 2727 SW
nyder Blvd., Ankeny, IA 50023
Representative: Joe Robson
Project Officer: Eri
Cannon
Phone Number: 319-350-3781
Phone Number: 51
-964-2020
Email:
Email: ecannon@s
der-associates.com
Project Identification: PRAIRIE MEADOW ESTATES FIRST ADDITION
Estimated Start Date*: 08/01/2024 Estimated Completion Date: 08/01/2027
I
PLEASE RESPOND TO ALL QUESTIONS
1. Has an engineering report, facilities plan or other information previously been submit
If Yes: Project Identity: Date Submitted:
2. Does the project and construction permit application, as submitted, follow the recom
construction schedule, permit limits, and conclusions of the approved engineering re
If No: Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this applicati
For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa
sets will be adequate for expeditious approval. For more complex projects, three set
requested.
4. Are approved standard specifications a part of this application?
If Yes: Approved Standard Specifications of
(municipality or firm): SUDAS
5. Does each set of plans and specifications or engineering report accompanying this app
"professional engineering seal" executed in conformance with 542B.16, Code of lowa
If No: Processing will be delayed pending receipt of applicable design schedules a
engineering report.
6. Is this a joint wastewater and water supply project?
If Yes: A construction permit application for the water supply project should be su
Section. A Water Supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction?
If No: A Sewage Treatment Agreement executed by the authority providing treat
8. Is a new or amended operation permit necessary to use the facilities described in this
If Yes: A new or amended permit to operate may be requested prior to the receip
9. Is any waterline located within 10 feet; or any private or public well, lake, or public re(
400 feet of the proposed construction?
If Yes: Identify and locate the facility(ies) relative to the proposed construction.
10. Will construction inspection be conducted by a licensed engineer employed by the al
If No: Name of Engineering Firm Conducting Inspection: City of Waterloo
11. Will this project utilize CWSRF loan funds?
t
ed for this project?
mendations, design loadings,
port or facilities plan?
on?
and Design Standard 11.1, two complete
s of plans and specifications may be
Yes No
❑ a
❑X ❑
CERTIFICATION
Date Approved: 2024
lication contain a
❑X ❑
El 0
El El
nd certified plans, specifications or
❑x ❑
bmitted separately to the Water Supply
El a
ment must accompany this form.
application? ❑ ❑X
t of a construction permit.
reation area located within
plicant?
❑ a
O El
❑ ❑
APPLICANT
I certify that I am the authorized representative of the owner
and state that the project identified above is approved by the
owner.
Date
1-ZZ-ZY
ENGINEER
I certify that all aspects of the design included in this application
conform to applicable standards contained in Chapter 567 IAC
64, or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the
information contained in this application and, to the best of my
knowledge, such information is complete and accurate.
Signature
Date 7/23/2024
*Estimated Cop 'truction Start Date: Complete applications must be submitted at least 120 days in advance of the date for starting
construction in accordance with Rules 567 IAC 60.4 and 64.2
Please complete the Schedule Checklist on the following page of this form.
04/2016 cmc
DNR Form 542-3129; 28A
DOCUMENT CHECKLIST
Identify all categories included in this project. Also, identify schedules attached to this application.
Schedule Title
B Collection System
C Lateral Sewer Extension
D Trunk & Interceptor Sewer
E Wastewater Pump Station
F Treatment Project Site Selection
G Treatment Project Design Data
H1 Schematic Flow Diagram
H2 Treatment Process Loading and Removal Efficiency
H3 Mechanical Plant Reliability
Screening, Grit Removal and Flow Measurement
Septic Tank System
K1 Controlled Discharge Pond
K2 Aerated Pond
K3 Anaerobic Lagoon
L Setting Tanks
M Fixed Film Reactor -Stationary Media
N Rotating Biological Contactor
O Aeration Tanks or Basins
P Gas Chlorination
Q Sludge Digestion and Holding
R1 Sludge Dewatering and Disposal
R2 (A&B) Low Rate Land Application of Sludge
R3 Land Application of Sewage Sludge (To be developed)
S Land Application of Wastewater (To be developed)
Sewage Treatment Agreement
Attached
0
0
0
0
0
0
Included in Project
El
Submittal Date
Identify any categories included in this project which are not provided in the above list of schedules.
11/2015 cmc
DNR Form 542-3129; 28A
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
Sewage Treatment Agreement
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treat
i.e., a private subdivision connecting to a municipal system. This agreement must be exe
time the permit is issued, regardless of whether title to the proposed construction proje
project.
This agreement is not necessary when a contract for sewage treatment already exists; i.
However, the Department of Natural Resources must be informed in writing that the co
ent will be provided by different parties;
uted by the parties who are owners at the
t will be transferred after completion of the
., service contracts between municipalities.
tractual agreement does exist.
APPLICANT
Owner: Robson Homes Inc.
Firm: Snyder & Asgociates,
ENGINEER
Inc.
Address: 5901 WILLIAMS BLVD SW
Address: 2727 Snyder Blvd., Ankeny, IA 50023
Representative: CEDAR RAPIDS, IA 52404
Project Officer: Eric Cannon
Phone Number: 319-350-3781
Phone Number: 515-964-2020
Project Identification: PRAIRIE MEADOW ESTATES FIRST ADDITION
Owner and System Receiving Wastes: City of Waterloo
CERTIFICATION
I am the authorized representative of the owner identified above and state that the proposed sanitary sewage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified a ove.
Signature I---- Title: U Date 2-Z Z_ e i
AGREEMENT TO PROVIDE SEWAGE TREATMENT
am the authorized representative of the owner of the system identified above and state that the connection of the proposed
sanitary sewage facilities identified above is approved by the owner, and that the owner accepts responsibility for providing
adequate treatment of all wastes contributed by this project, in accordance with the provisions of Chapter 455B, Code of Iowa, and
the rules of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances,
sewer service agreements, or fee systems entered into between the parties.
Name: Quentin Hart
Title: Mayor
(/�� �/
Signature Que J (LG
SIGNED
Date 9/16/2024 Phone:
9/2018 cmc
DNR Form 542-3219; 29
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B, Collection System
DNR USE ONLY
Project No.
Permit No.
Date Prepared
7/23/2024
Date Revised
Project Identity
PRAIRIE MEADOW ESTATES FIRST ADDITION
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the
system. If no portion is subject to flooding, state none.
Segment
none
Flooding Protection
*2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor; 2) the nearest downstream lift station; and 3) all
downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Segment Segment Segment
Location
Design Capacity, MGD
Peak Hourly Dry weather Flow MGD (actual)
Peak Hourly Wet weather Flow MGD (actual)
Segment
41723-41722
0.72
0.0001
0.09
All values provided from sanitary
sewer model
*3. Identify treatment facility, the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility Name and Number Waterloo City of STP, IA 079001
Facility Loading
Design
Average Wet Weather (actual)
Peak Hourly Wet Weather (actual)
MGD
#BOD5/day
34.8
88,000
24.53
31,500
60
48,000
Provide projected design loading increase, which will be added to this facility as a result of this project.
Design Loading Initial Design Year (2029 )
Residential Service Area 9.6 Acres 9.6 Acres
Population 0 Persons 153 Persons
Flow (100 GPCD) 0 GPD 15,300 GPD
BOD5(0.17/#/d/cap) 0 #/day 26.0 #/day
Industrial Service Area 0 Acres 0 Acres
Rated Flow 0 GPD 0 GPD
BOD5 0 #/day 0 #/day
Other 0 Acres 0 Acres
Rated Flow 0 GPD 0 GPD
BOD5 0 #/day 0 #/day
Total BOD5 0 #/day 26 #/day
Total Flow 0 GPD 15,300 GPD
Peak Hourly Flow 0 GPD 64,080 GPD
*Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded.
11/2015 cmc
DNR Form 542-3095; 28B
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE C, Lateral Sewer Extension
DNR USE ONLY
Project No.
Permit No.
Date Prepared
7/23/2024
Date Revised
Project Identity
PRAIRIE MEADOW ESTATES FIRST ADDITION
1. Design Basis
Residential Service Area
Population
Flow (100 GPCD)
BODS (0.17/#/d/cap)
Industrial Service Area
Rated Flow
BODS
Other
Initial
9.6
Design Year (2029 )
Acres 9.6 Acres
0 Persons 153 Persons
0 GPD 15,300 GPD
0 #/day 26.0 #/day
0 Acres 0 Acres
0 GPD 0 GPD
0 #/day 0 #/day
0 Acres 0 Acres
Rated Flow 0 GPD 0 GPD
BODS 0 #/day 0 #/day
Total BODs 0 #/day 26 #/day
Total Flow 0 GPD 15,300 GPD
Peak Hourly Flow 0 GPD 64,084 GPD
2. Pipe Diameter 8 Inch 10 Inch 12 Inch
Material PVC
Joint Gasketed
Minimum Slope 0.5
Maximum Manhole Space 305
Total Sewer Length 1,663
Maximum Cover 16.70
Minimum Cover 9.06
ft. ft. ft.
ft. ft. ft.
ft. ft. ft.
ft. ft. ft.
3. Construction specifications (indicate ASTM Number or other standard included in the specifications). A brief description is
required in each part.
A. Bedding class Figure 3010.103 - Class I Bedding Material
B. Pipe laying Section 4010 3.02 B Proceed upstream with bells pointing upstream
C. Compaction Section 3010.306
D. Manhole Section 6010 Precast 48" Manhole
E. Specified maximum infiltration/exfiltration rate 200 GPDPMPI
F. Infiltration/exfiltration test procedures Section 4060.304 Water and air pressure
G. Alignment & grade test procedures
(1) During construction Stake & batterboard Laser Section 4010 3.02
(2) After construction Lamping Section 4060 3.02 Other Video Inspection
H. Deflection test procedures Section 4060 3.05 Ball of mandrel pulled through 95% DIA.
4. Are detailed manhole drawings included: ❑ Yes No Typical frame and cover assembly Figure 6010.601
Are manhole covers nonvented: Yes ❑ No Manhole diameter 48 in.
Manhole opening diameter 24
In Material Cast Iron frame and grate, concrete manhole
5. Minimum sewer & water main separation: Horizontal 10
Are specifications included No
ft. Vertical 18 in.
6. Stream, road, or railroad crossing protection No
Are specifications included
11/2015 cmc
DNR Form 542-3096; 28C