Loading...
HomeMy WebLinkAboutEntrust Solutions - As-Built Contract - 9.16.2024ENENGINEERING Contact: ct: Cole Henkle, VP of Design chenkle@entrustsol.com Prepared for• ity of Waterloo Proposal ber: 1234-00 June 26, 2024 •l r a of July 23, 2024 City of Waterloo RE: As-builts Dear, Mayor Hart On behalf of ENTRUST and Cole Henkle, thank you for allowing EN Engineering, LLC (EN) the opportunity to present you with this proposal. EN is committed to providing high quality and cost- effective engineering and design services that will ensure Waterloo's projects are successfully implemented. Our technical experts, engineers, designers and drafting professionals have developed strong working -relationships with the City of Waterloo. We are confident that EN's expertise will result in another successful project for the City. We appreciate this opportunity to provide a proposal and look forward to meeting with your team to further discuss our proposal in more detail. Should you have any questions or require any additional information, please contact Cole Henkle at 913.706.3306 chenkle@entrustsol.com. Sincerely, /e8.12-41.7 esse Rodriguez Executive Vice President Commercial Operations Page 2 SCOPE OF WORK As-builts EN proposes to complete the as -built digitization 2,819,260 ft of fiber project as-builts, which will enable the City of Waterloo to accurately collect, track, analyze and report on key broadband infrastructure assets that it has deployed and operates across the city. We propose to first build a layer for the City's conduit and fiber, identifying placed conduit, type, size status (occupied/vacant) and related information as listed below under GIS Data Feature Class Layer Assumptions. A second layer will incorporate all outside plant structures owned by the city, including vaults, handholes, manholes pedestals, poles, transitions, and related information that can easily be incorporated into the city s Fiber Management System (FMS). From these layers, we will proceed to identify all fiber-optic assets placed during the city's Fiber Optic Network roll -out and document types of fiber cable, strand count, splice points, splice cases, slack loops, terminations, and related information. This process includes compiling the collected location of all boxes, conduit, fiber cables and other structures. All field data and information related to changes in the field, as -built and redlines will be implemented into the digital record. Our as -built team will compile the dailies and red -lines that are coming from the field and be process them into a digital As -Built record that can be imported into the City's FMS. EN will use the existing Waterloo FMS Schema and/or work with the FMS vendor to accurately import the as -built data. Timeline As-builts to be completed by Task Order and aligned with the construction schedule by Task Order. As-builts will be delivered within 90 days of the construction completion of a Task Order. Page 3 PRICING The costs outlined below are EN Engineering's estimated work effort required to complete the tasks described within this document. Work is intended to be performed on a unit basis, not to exceed basis. Any additional work necessary outside the scope of work described in this proposal will be completed per the established rate schedule below. The provided pricing is valid for 180 days from submittal. Total Price Unit Units TOTAL As-Builts $0.17 FT 2,819,260 $479,274.20 2024 (PHASE 1 — FIRE STATION 6) $0.17 FT 1,198,186 $203,691.62 2025 (PHASE 2 — LINDEN) $0.17 FT 768,113 $130,579.21 2026 (PHASE 3 — FLETCHER) $0.17 FT 764,815 $130,018.55 EDA PROJECT $0.17 FT 71,878 $12,219.26 LA PORTE RD PROJECT $0.17 FT 16,268 $2,765.56 TOTAL $0.17 FT 2,819,260 $479,274.20 EN Engineering, LLC By: L �c L Name: Patrick Carr Title: Executive Vice President Page 4 City of Waterloo �/ By: 62cieftWZ art Name: Quentin Hart DIGIIAL.r SIGNED Title: Mayor