HomeMy WebLinkAboutICAAP ROUNDABOUT APPLICATION 2024 - 9.16.24Form 230017 (05-20)
General Information:
IDWA DDT
PROJECT APPLICATION
IOWA CLEAN AIR ATTAINMENT PROGRAM (ICAAP)
Applicant Agency: City of Waterloo, Iowa
Public Agency (required)
Contact Person (Name and Title): Tina Schellhorn
E-mail: Tina.Schellhorn@waterloo-ia.org
Complete Mailing Address: 625 Glenwood Street
Waterloo
City
Street Address and/or Box Number
I� 50613 (319) 291-4440
State ZIP Code Daytime Phone
If more than one agency or organization is involved in this project, please state the name, contact person, mailing address, and
telephone number of the second agency. (Attach an additional page if more than two agencies are involved.)
Co -Applicant Agency: E-mail:
Public Agency, Non -Profit Organizations, For -Profit Organization', orindividuall
Contact Person (Name and Title):
Complete Mailing Address:
Street Address and/or Box N umber
City State ZIP Code Daytime Phone
Protect Information:
Project Title2: Hammond Avenue / Ridgeway Avenue Roundabout
Project Description (including length, if applicable):
Roundabout installation at the intersection of Hammond Avenue / Ridgeway Avenue.
*Project priority (1 = highest priority): (a sponsor submitting multiple applications in this funding cycle must assign a
numerical rank or priority to each application.)3
*Assign the proposed project to one or more of the following categories (check one or more):
❑ Transportation -Related Project in the State Implementation Plan (SIP)
Transportation Control Measure (TCM)
Traffic Flow Improvement (Intersection, Signalization, Other)
❑ Planning and Project Development
❑ Travel Demand Management (TOM)
❑ Transit -Related Improvement
▪ Shared -Ride
▪ Bicycle or Pedestrian Facility or Program (select one)
[] Intermodal Freight
❑ Passenger
❑ Alternative Fuels
❑ Vehicle Inspection and Maintenance Program
❑ Outreach Activity (Education, Advertising, or Technical Assistance)
is the project consistent with the State Implementation Plan for air quality for non -attainment areas? ❑ Yes ❑ No slot Applicable
*Is the project consistent with the MPO's local congestion management plan? ❑ Yes ❑ No j Jot Applicable
*Is the project consistent with the fir O ❑ RPA ❑ Statewide Long -Range Transportation Plan? ) Yes ❑ No ❑ Not Applicable
Notes: 1Requires public agency as co-sponsor of application.
2The term "project" means any ICAAP infrastructure or program proposal.
3The Iowa Department of Transportation will use the priority ratings to reflect the sponsor.
Project Costs (an itemized breakdown must be included on an attached sheet):
Total Cost:
Iowa Clean Air Attainment Program Fund Request:
Applicant Match
$1,200,000.00
$700,000.00
$500,000.00
Projects with a private for -profit co -applicant require a minimum 50 percent applicant match; all other projects require a minimum
20 percent applicant match.
2.
3.
List All Applicant Match Sources
Amount
Assured or Anticipated
(Date Anticipated)
City of Waterloo
$500,000.00
July 01, 2025
Are any state funds involved in this project? ❑ Yes lelo
If Yes, please explain the source and conditions:
Are any other federal funds involved in this project? ['Yes 01
If Yes, please explain the source and conditions:
Estimated Project Development Schedule:
Design:
Land Acquisition:
Construction:
Start Date: February 01, 2026
Start Date:
May 01, 2026
Start Date: July 01, 2026
Has any part of this project been started? ❑ Yes ,VV❑
If Yes, please explain: "�
How do you plan to measure the success of this project?
Before and after modeling.
Completion Date:
Completion Date:
Completion Date:
May 01, 2026
May 01, 2026
July 01, 2027
Page 2 of 6
Required Documentation and Narrative Information
The following documents and narratives must be submitted with this application. In the upper right corner of each document or
narrative write the corresponding letter shown below.
2 A. A NARRATIVE assessing existing congestions/air quality conditions, outlining the concept of the proposed project, and
providing adequate project justification. How will this project reduce congestion, reduce travel or single occupant vehicle
usage, and/or improve air quality? Which transportation -related pollutant(s) are being addressed: carbon monoxide, ozone, or
particulate matter (PM)?
A DETAILED MAP identifying the location of the project and clearly differentiating the subject project from any past or future
project phases.
An ITEMIZED BREAKDOWN of the total project costs. This documentation does not need to be a detailed, line -item type of
estimate. However, it must accomplish two objectives: First, it must show the method by which the cost estimate was
prepared; and second, it must enable a reviewer to determine if the cost estimate is reasonable. The manner in which these
objectives are achieved may vary widely depending on the type, scope. and complexity of the project. Absent a fully itemized
list of costs, some general guidelines for possible methods of estimating each type of project cost are provided on Attachment A.
c D. A TIME SCHEDULE for the total project development.
[r E. An OFFICIAL CERTIFICATION from the applicant's governing body (authority) that it shall:
(1) commit the necessary local matching funding for project implementation and
(2) upon project completion, be responsible for adequately maintaining and operating the project for public use during
the project's useful life.
F• An ADOPTED FORMAL RESOLUTION from the appropriate MPO or RPA declaring the sponsor's proposed project or
program conforms to the MPO's or RPA's regional transportation planning process. (For MPOs, the project or program must
be identified in the fiscally constrained transportation plan and, if applicable, the congestion management plan in TMAs.)
• G. CALCULATIONS for vehicle emission reductions and total project cost-effectiveness for the targeted pollutants. Project
applicant must show through a quantitative analysis how many kilograms of pollutant will be reduced (CO, VOC, NOx, and, if
applicable, PM). Project sponsor must calculate the cost-effectiveness of the project by: Dividing the total annualized project
cost by the number of kilograms per year of pollutant reduced ($ per kg). Applicant must also show all assumptions and
source of data used to calculate the estimates. The applicant must use the most current vehicle emission factors developed by
the Iowa DNR and consistent with the U.S. EPA's MOBILE 6.2 air quality model. These emission factors are periodically
updated and may be obtained from the Iowa DOT's ICAAP website at: hops://iowadot.gov/systemsjlanning/Grant-Programs/
I owa-C lea n-Air-Attain ment- Program-ICAAP.
• H. Completed MINORITY IMPACT STATEMENT attached to application.
B.
• C.
The award of ICAAP funds; any subsequent funding or letting of contracts for design, construction, reconstruction, improvement, or
maintenance; and the furnishing of materials for this project shall not involve direct or indirect interest of any state, county, or city
official, elective or appointive. All of the above are prohibited by Iowa Code 314.2, 362.5, or 331.342. Any award of funding or any
letting of a contract in violation of the foregoing provisions shall invalidate the award of ICAAP funding and authorize a complete
recovery of any funds previously disbursed.
Certification
To the best of my knowledge and belief, all information included in this application is true and accurate, including the commitment of all
physical and financial resources. This application has been duly authorized by the participating local authority. I understand the
attached official endorsement(s) binds the participating local governments to assume responsibility for adequate maintenance of any
new or improved facilities.
If ICAAP funding assistance is approved for the project described in this application, I understand that an executed contract between
the applicant and the Iowa DOT is required before such funding assistance can be authorized for use in implementing the project.
Representing the City of Waterloo
Quefi /z 9-tari
DIGITALLY
SIGNED
Nif
Quentin Hart, Mayor
(Name of Applicant's Governing Authority)
Signature
9/16/2024
Date
9/16/2024
Typed Name and Title Date
(Governing Authority Official)
Page 3 of 6
CaIOWADOT
Form 105101 (3-18)
Minority Impact Statement
Pursuant to 2008 Iowa Acts, HF 2393, Iowa Code 8.11, all grant applications submitted to the State of Iowa that are due
beginning Jan. 1, 2009, shall include a Minority Impact Statement. This is the state's mechanism for requiring grant
applications to consider the potential impact of the grant project's proposed programs or policies on minority groups.
Please choose the statement(s) that pertains to this grant application. Complete all the information requested for
the chosen statement(s). Submit additional pages as necessary.
❑ The proposed grant project programs or policies could have a disproportionate or unique positive impact on
minority persons.
Describe the positive impact expected from this project.
Indicate which groups are impacted.
❑ Women ❑ Persons with a disability ❑ Blacks Latinos Asians
❑ Pacific Islanders ❑ American Indians ❑ Alaskan Native Americans ❑ Other
The proposed grant project programs or policies could have a disproportionate or unique negative impact on
minority persons.
Describe the negative impact expected from this project.
Present the rationale for the existence of the proposed program or policy.
Provide evidence of consultation with representatives of the minority groups impacted.
Indicate which groups are impacted.
❑ Women ❑ Persons with a disability ❑ Blacks ❑ Latinos ❑ Asians
❑ Pacific Islanders ❑ American Indians ❑ Alaskan Native Americans ❑ Other
The proposed grant project programs or policies are not expected to have a disproportionate or unique impact on
minority persons.
Present the rationale for determining no impact.
I hereby certify that the information on this form is complete and accurate, to the best of my knowledge.
Name Tina Schellhorn
Title Associate Traffic Engineer
❑efinitions
"Minority Persons," as defined in Iowa Code 8.11, means individuals wh❑ are women, persons with a disability, Blacks,
Latinos, Asians or Pacific Islanders, American Indians, and Alaskan Native Americans.
"Disability," as defined in Iowa Code 15.102, subsection 7, paragraph "b," subparagraph (1):
b. As used in this subsection:
(1) "Disability" means, with respect to an individual, a physical or mental impairment that substantially limits one or
more of the major life activities of the individual, a record of physical or mental impairment that substantially limits
❑ne or more of the major life activities of the individual, or being regarded as an individual with a physical or mental
impairment that substantially limits one or more of the major life activities of the individual.
"Disability" does not include any of the following:
(a) Homosexuality or bisexuality.
(b) Transvestism, transsexualism, pedophilia, exhibitionism, voyeurism, gender identity disorders not resulting
from physical impairments or other sexual behavior disorders.
(c) Compulsive gambling, kleptomania, or pyromania.
(d) Psychoactive substance abuse disorders resulting from current illegal use of drugs.
"State Agency," as defined in Iowa Code 8.11, means a department, board, bureau, commission, or other agency or
authority of the State of Iowa.
REQUEST FOR IOWA'S CLEAN AIR ATTAINMENT PROGRAM (ICAAP)
ATTACHMENT A
Itemized breakdown of total project costs guidelines.
Construction costs
These may be based on historical averages for entire projects of similar size and scope. Examples include:
• Typical cost per mile of trail (e.g., $200,000 per mile for moderate terrain and limited number of structures).
• Typical cost per square foot of bridge deck.
• Typical cost per square foot of fiber optic traffic signal interconnect cable (i.e., $178,000 per mile).
• Typical cost per traffic signal upgrade (i.e., $163,000 per lump sum signal bid item).
Design/Inspection costs
These may be estimated based on the following typical percentages of construction costs, such as:
• 8 to 10 percent for preliminary up through final design and letting activities.
• 12 to 15 percent for construction inspection activities.
Right of way acquisition costs
These may be estimated based on:
• Impact and description of impact.
• Typical cost per square foot for permanent right of way.
• Typical cost per square foot for temporary easements.
Utility and railroad costs
These may be estimated based on:
• Impact and description of impact.
• Typical cost per linear foot of relocated or reconstructed facility (i.e., track, pipe, electrical lines).
• Typical cost per installation (i.e., railroad switches, utility poles, transformers, control boxes).
Indirect costs
If indirect costs are involved (e.g., wages):
• Estimated hours.
• Estimated hourly rate, salary.
• Estimated fringe, direct.
• Other direct cost estimate.
• Other indirect cost estimate.
Page 6 of 6
A. Narrative
B. Map
Existing Condition
Hammond Avenue is a two-lane urban roadway classified as a minor arterial with a 30 mph speed limit.
Ridgeway Avenue is a two-lane urban roadway classified as a minor arterial with a 35 mph speed limit.
The 2021 DOT traffic map shows an AADT on the north leg of Hammond Avenue of 9000, 9200 on the
south leg of Hammond Avenue, 8900 on the west leg of Ridgeway Avenue, 7100 on the east leg of
Ridgeway Avenue. Hammond Avenue is offset to the north and south of Ridgeway Avenue which
creates a skewed intersection. At the intersection, there is an eastbound right turn lane and a
channelized northbound right turn lane. The intersection is controlled by all way stop control.
The intersection experiences a large number of crashes. Broadside (front to side) and rear -end crashes
are the predominant type of crashes. A high number of crashes related to running a stop sign occur at
the intersection. The intersection is at capacity and a lot of the crashes are likely due to congestion and
frustrated drivers. Excess emissions are also a result of congestion. A roundabout can reduce the
crashes and congestion considerably.
Proposed Concept
A single lane roundabout is proposed. A roundabout can improve safety and congestion of the
intersection. A roundabout will reduce the number of conflict points at the intersection and improve
traffic flow. Drivers entering a roundabout will have only one conflict point with circulating traffic. Drivers
entering the existing intersection have multiple conflict points. Reducing the number of conflict points will
increase safety. A roundabout will also improve the geometry of the skewed intersection.
I- pc Martin
Memorial P
Le su -
Howard Johnson by
Wyndham Waterloo/Cedar...
SunnysiaeGolf
Country Club
9
Van 44,1er W y
Grady Instrument
Services
Anstzmugh pre
Wate
E Rrtlgesay Ave
r,riercyOrle Waterloo
Medical Center
w San Marlon Dr
Furniture Row
Indepenvence.Ave Ince Fe ndenceAve
rs'Plus
kesi.dency.WaL.
riI
UScellu]ar
Country & Suites by
Radisson, Waterloo, EAR
Waterloo
Lost Island
KOA Resort
Thp.ra7ed
Project Location
u �
• `t41.0 ,.
I
Oe Prarkwrd
Evansdale
Iowa
Isle Casino
tel Waterloo
Lost island Themepark
e-rnrorarily •fee
C
C. Itemized Costs
Preliminary Cost Estimate
Units
Unit
Cost
Quantity
Total
Cost
Removal of Pavement
SY
$16.00
3400
$54,400
Topsoil, Strip, Store, Spread
CY
$20.00
200
$4,000
Signage
LS
$2,500.00
1
$2,500
PCC Roadway
SY
$85.00
3533
$300,305
Curb and Gutter
LF
$45.00
2200
$99,000
Granular Subbase
SY
$12.00
3886
$46,636
Storm Sewer
LS
$50,000.00
1
$50,000
Sanitary Sewer
LS
$40,000,00
1
$40,000
Water Main
LS
$40,000 00
1
$40,000
Pavement Markings
LS
$12,000,00
1
$12,000
Street Lighting
EA
$10,000,00
20
$200,000
Topsoil
CY
$30.00
500
$15,000
Seeding
LS
$2,500.00
1
$2,500
Erosion Control
LS
$5,000.00
1
$5,000
Traffic Control
LS
$50,000 00
1
$50,000
Mobilization
LS
$15,000 00
1
$15,000
Contingencies (10% of Construction Cost)
LS
$93,634,06
1
$93,634
Engineering
$125,000
Total
$1,154,975
Rounded Total
$1,200,000
ICAAP Funds
$500,000
City Funds
$700,000
D. Schedule
Preliminary Schedule
Funds Available
JULY 2025
Preliminary / Check Plans
FEBRUARY 2026
Right of Way Acquisitions
MAY 2026
Final Plans
APRIL-MAY 2026
Construction Letting
JULY 2026
Construction
JULY 2026-JULY 2027
E. BLANK PAGE FOR CITY APPROVAL OF FUNDING
F. BLANK PAGE FOR FORMAL RESOLUTION CITY APPROVAL OF FUNDING
G. CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS
The following calculations represent the specific emission reductions expected as a result of
improved traffic operations throughout the intersection area.
Peak hour traffic volumes used in the emission reduction calculations were counted in May 2024.
ADT traffic volumes used were obtained from the Iowa DOT 2021 ADT map.
Average speed data was obtained from Sidra Intersection modeling of the before (all -way stop
control) and after (roundabout control).
Emission factors in grams/mile for hydrocarbons volatile organic compounds (VOC (HC3)),
carbon monoxide (CO), and nitrogen oxide (NOx) were obtained from the EPA's MOBILE 6.2 air
quality model for operating speeds along city arterials.
Cost Effectiveness of Total Emissions Reductions
The following Summary Table depicts the anticipated total annual emissions reduction in the
intersection area, within the project limits, and the annual cost per kg of reduced pollutant for
VOC, CO and NOx. Detailed calculation is depicted in the tables on the next page under Detailed
Calculation - Conversion to Roundabout.
Summary Table
Estimated Emissions Reductions
VOC (HC)
CO
NOx
CO2
Total Annual Reduction (kg/yr)
899
3458
511
0
Cost Effectiveness
Total Estimated Project Cost ($)
1,200,000
Effective Project Life (Years)
25
Annual Project Cost ($)
48,000.00
Annual Cost per kg of Reduced Pollutant ($/kg/yr)
$ 53.37
$ 13.88
$ 93.87
Detailed Calculation - Conversion to Roundabout
Intersection Data
Roadway Length Analyzed (miles)
0.76
Average Daily Traffic (ADT)
17,100
Vehicle Miles Traveled
12,996
AM Peak Hour VMT
780
PM Peak Hour VMT
1,170
Off -Peak Hour VMT
11,047
% AM Peak Hour of ADT
6%
% PM Peak Hour of ADT
9%
Estimated Emissions - Existing Conditions Speed
VOC (HC)
CO
NOx
CO2
Average Speed - AM Peak Hour (mph) 22
Average Speed - PM Peak Hour (mph) 15
Average Speed - Off -Peak Hour (mph) 23
Emissions Factor -AM Peak Hour (g/mi)
1.913
13.282
1.864
563.190
Emissions Factor -PM Peak Hour (g/mi)
2.340
15.242
2.086
563.190
Emissions Factor -Off Peak Hour (g/mi)
1.879
13.137
1.843
563.190
Peak Hour Emissions = AM Peak VMT x EF (g)
1492
10357
1453
439153
Peak Hour Emissions = PM Peak VMT x EF (g)
2737
17828
2440
658730
Off -Peak Emissions = Off -Peak VMT x EF (g)
20757
145119
20359
6221335
Daily Emissions = 1 Emissions (g/day)
24985
173304
24252
7319217
Estimated Emissions - Post Conditions Speed
VOC (HC)
CO
NOx
CO2
Average Speed - AM Peak Hour (mph) 29
Average Speed - PM Peak Hour (mph) 26
Average Speed - Off -Peak Hour (mph) 29
MI
Emissions Factor -AM Peak Hour (g/mi)
1.727
12.587
1.755
563.190
Emissions Factor -PM Peak Hour (g/mi)
1.793
12.799
1.792
563.190
Emissions Factor -Off Peak Hour (g/mi)
1.727
12.587
1.755
563.190
Peak Hour Emissions = AM Peak VMT x EF (g)
1347
9815
1368
439153
Peak Hour Emissions = PM Peak VMT x EF (g)
2097
14970
2096
658730
Off -Peak Emissions = Off -Peak VMT x EF (g)
19077
139044
19387
6221335
Daily Emissions = F Emissions (g/day)
22521
163829
22851
7319217
Estimated Emissions Reduction
Speed VOC (HC)
CO
NOx
CO2
Daily Emissions = X Emissions (g/day)
2464
9475
1401
0
Annual Reduction = daily reduction x 365 (kg/yr)
899
3458
511
0