HomeMy WebLinkAboutVieth Construction FQS Cont. #1029 - 9.16.2024CITY OF WATERLOO, IOWA
FINAL QUANTITY SUMMARY
PROJECT: US63 Enhancements (TAP-U-8155(774)--8I-07) CONTRACT NO. 1029
Date Prepared: September 3, 2024 AMOUNT: $19,177.29 DECREASE
TO: Vieth Construction Corp. , Contractor
You are hereby ordered to perform the following extra work on your contract dated Feb. 11, 2021.
A. Description of extra work to be done:
Adjust original construction quantities to actual construction quantities.
B. Reason for ordering extra work:
As -built quantities varied for some bid items
C. Settlement for cost of extra work to be made as follows:
Compensation already made to contractor through bid items.
See attached summary.
TOTAL DECREASE $19,177.29_
ottertan 9 9/16/2024
Mayor DV CONTRACTOR
BY:
ATTEST:
R1eOEey Felchle
City
DICITAI
9/16/2024
Vieth Construction Corp.
LE: 15 1.. or/a,
APPROVED:
?E(42/,;(/
ate
09/04/2024
ty Engineer Date
FINAL QTY. SUMMARY
Cont #1029 Sheet 1 of 1
L,IOWADOT
Form 831240 (12-20)
Accounting ID No.(5-digit number):
CHANGE ORDER
For Local Public Agency Projects
No.. 08
Change Order No.:
Non -Substantial: Aug 22, 2024
Substantial: Administering Office
Concurrence Date
Accounting ID No. (5-digit number):37266 Project Number TAP-U-8155(774)--8I-07
Contract Work Type: PCC Sidewalk/Trail
Contractor: Vieth Construction Corp.
Local Public Agency: Waterloo
Date Prepared: August 22, 2024
You are hereby authorized to make the following changes to the contract documents.
A - Description of change to be made:
Bid Items 0080, 0120-0140, 0190, 0310-0440, 0490, 0520, 0540, 0570, 0610, 8003-8005, 8009, and 8010 - Adjust original
construction quantities to actual construction quantities. Bid Items 0120-0140, 0190, 0310-0390, 0430, 0440, 0490, 0520, 0540,
0570, 0610, 8003-8005, 8009, and 8010 are Division I Participating and Bid Items 0080, 0400-0420 are Division 2 Non -
Participating.
B - Reason for change:
Bid Items 0080, 0120-0140, 0190, 0310-0440, 0490, 0520, 0540, 0570, 0610, 8003-8005, 8009, and 8010 - As -built quantities varied
for some bid items.
C - Settlement for cost(s) of change as follows with items addressed in Sections F and/or G:
Bid Items 0080, 0120-0140, 0190, 0310-0440, 0490, 0520, 0540, 0570, 0610, 8003-8005, 8009, and 8010 - No change in costs.
Compensation already made to contractor through original bid items. Overall deduct for Division 1 is $14,463.29 and Division 2 is
$4,714.00.
D - Justification for cost(s) (See I.M. 6.000, Attachment D, Chapter 2.36, for acceptable justification):
Bid Items 0080, 0120-0140, 0190, 0310-0440, 0490, 0520, 0540, 0570, 0610, 8003-8005, 8009, and 8010 - No change in costs. Unit
bid prices remain the same.
E - Contract time adjustment: I No Working Days added ❑ Working Days added: ❑ Unknown at this time
Justification for selection:
Bid Items 0080, 0120-0140, 0190, 0310-0440, 0490, 0520, 0540, 0570, 0610, 8003-8005, 8009, and 8010 - No change in
working days as the overall is a deduct to the project.
Page 1 of 3
C IOWADOT
Form 831240 (12-20)
Accounting ID No.(5-digit number):37266
Change Order No.:08
F - Items included in contract:
Participating
For deductions enter as
Federal-
aid
State-
aid
Line
Number
Item Description
Unit Price
.xx
Quantity
.xxx
Amount
.xx
0080
GRANULAR SURF ON RD, CL A CR STONE
$65.00
-30.000
-$1,950.00
x
0120
RMV+REINSTALL CONC PIPE APRON LE 36"
$1,250.00
-0.500
-$625.00
x
0130
MODULAR BLOCK RETAIN WALL
$22.00
807.400
$17,762.80
x
0140
MANHOLE ADJUSTMENT, MINOR
$500.00
1.000
$500.00
x
0190
LIGHTING POLE
$4,763.00
-8.000
-$38,104.00
x
0310
COLORED TOOLED PORTLAND CEMENT
CONCRETE
$95.00
-62.400
-$5,928.00
x
0320
MULCH, BONDED FIBER MATRIX
$10,600.00
0.960
$10,176.00
x
0330
SEED+FERTILIZE (URBAN)
$10,600.00
0.960
$10,176.00
x
0340
STABILIZE CROP - SEED+FERTILIZE (URBAN)
$10,600.00
-0.300
-$3,180.00
x
0350
PERIMETER+SLOPE SEDIMENT CNTL DEVICE, 9"
$3.75
294.200
$1,103.25
x
0360
RMVL OF PERIMETER+SLOPE SEDIMNT CNTL DEV
$1.10
294.200
$323.62
x
0370
OPEN -THROAT CURB INTK SED FILT, EC-602
$32.00
52.000
$1,664.00
x
0380
MAINT OF OPEN-THRT CURB INTKE SDMNT FLTR
$53.00
-18.000
-$954.00
x
0390
RMVL OF OPEN-THRT CURB INTKE SDMNT FLTR
$53.00
-1.000
-$53.00
0400
GRATE INTAKE SEDIMENT FILTER BAG
$371.00
-4.000
-$1,484.00
0410
MAINT OF GRATE INTAKE SEDIMENT FLTR BAG
$160.00
-4.000
-$640.00
0420
RMVL OF GRATE INTAKE SEDIMENT FILTER BAG
$160.00
-4.000
-$640.00
x
0430
MOBILIZATION, EROSION CONTROL
$500.00
7.000
$3,500.00
x
0440
MOBILIZATION, EMERGENCY EROSION CONTROL
$1,000.00
-1.000
-$1,000.00
x
0490
TREE GROUNDCOVER (FEATHER REED GRASS 1
GAL. CONT.)
$9.00
-28.000
-$252.00
x
0520
TREE NORWAY MAPLE 2.5 IN. CAL. B&B
$400.00
1.000
$400.00
x
0540
TREE PRAIRIEFIRE CRABAPPLE 1.5 IN. CAL. B&B
$240.00
3.000
$720.00
x
0570
B&BE SPRING SNOW CRABAPPLE 1.5 IN. CAL.
$240.00
-6.000
-$1,440.00
x
0610
WATER -PLANT
$32.00
-500.000
-$16,000.00
x
8003
Additional Electrical Circuit
$25.71
-30.000
-$771.30
x
8004
1/2" Expansion Joint
$2.91
-172.500
-$501.98
x
8005
Curb, Special, As Per Plan
$34.87
-7.000
-$244.09
x
8009
Painted Pavement Markings Waterborne or
Solvent- Based
$672.22
10.560
$7,098.64
x
8010
Pavement Markings Removed
$932.61
1.250
$1,165.76
Page 2 of 3
�' IOW DEW-
�t� -�I� 8312 0 (12
Line
Number
Item Description
Unit Price
.xx
Quantity
.xxx
Amount
.xx
Add Row
Delete Row
TOTAL
-$19,177.29
G - Items not included in contract:
Participating
For deductions enter as
"-x.xx"
Federal-
aid
State-
aid
Change
Number
Item Number
Item Description
Unit Price
.xx
Quantity
.xxx
Amount
.xx
Add Row
H. Signatures
Delete Row
TOTAL
Signatures will be applied through DocExpress.
Page 3 of 3
Doc Express® Document Signing History
Contract: 07-8155-774 Document: CO 08
Date
Signed By
08/30/2024
Alex Weber
Vieth Construction
Electronic Signature
(Approved by Contractor)
08/30/2024
Michelle Sweeney
AECOM - Iowa
Electronic Signature
(Recommended by Engineer / Approved)
08/30/2024
Jamie Knutson
City of Waterloo
Electronic Signature
(Approved by PIRC (when applicable))
09/03/2024
Kurt Harvey
Iowa Local Systems
Electronic Signature
(Approved by Administering Office or designee)