HomeMy WebLinkAboutWRH CO #2 TITUS Cont. #975 - 9.16.2024,4=COM August 30, 2024 Mr. Jesse Gaherty Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa, 50702 Subject: Titus Lift Station and Force Main Change Order No. 2 City of Waterloo, Iowa City Contract No. 975 AECOM #60726355 Dear Mr. Gaherty: AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com Attached is Change Order No. 2 for the Titus Lift Station and Force Main project submitted by WRH, Inc. 319-232-6531 tel 319-232-0271 fax The following are the details for the requested changes. • Final Completion Date — CAR No. 7 - WRH has requested to add 31 calendar days to the project. This time is for work approved with Change Order No. 1. We feel this time addition is justified. • Bedrock was encountered at Grandview Avenue that prevented directional drilling the force main. It takes more time to remove and replace the pavement and open cut the force main across Grandview Avenue than installing by direction drilling. • Manhole No. 2 was added to the project to connect the force main to the gravity sewer at the south end of the project. Additional time is needed to do this work. • Bid Item No. 44 - 16' Chain -Link Fence Gate — CAR No. 8 — MidAmerican Energy requested that the transformer be placed in the swing path of the east side gate. To accommodate this request, we decided to change the gate from a swing gate to slide gate so the gate can be fully opened. This change is an addition of $1,942.50. • Bid Item No. 49 — MidAmerican Transformer Pad — CAR No. 10 — The MidAmerican Transformer Pad was not included in the design. It is typically unknown at the time of design whether MidAmerican Energy will require a concrete pad for the transformer or if the transformer will be located on a power pole. MidAmerican Energy requested a ground mounted transformer. This work is required to power the lift station. This change is an addition of $25,845.23. AECOM recommends the City approves Change Order No. 2 for the addition of $27,787.73 and a revised total contract cost of $6,270,696.88. The increase is 1.40% of the original contract. Yours sincerely, Christopher G. Oelkers, PE Enclosure: Change Order No. 1 dated 08/30/2024 WRH Inc Change Authorization Request Nos. 7, 8, and 10 L:\DCS\Projects\WTR\60726355_Titus_LS_and_FM_CRS\600_Construction_Support\670_Change-Orders\CO 2\975 TITUS - CO 02 LTR.docx CHANGE ORDER 2 A=COM Owner City of Waterloo Project TITUS LIFT STATION AND FORCE MAIN Date: August 30, 2024 Owner's Contract No. 975 Contractor: WRH, INC. SRF NON-SRF Date of Contact Start January 2, 2024 Contract Amount: $6,184,087.00 $ You are directed to make the following changes in the Contract Documents. Description: 44 16' CHAIN -LINK GATE WRH CR 8 $ 1,942.50 49 MIDAM TRANSFORMER PAD WRH CR 10 $ 25,845.23 TOTAL $ 27,787.73 ADDITION Reason for Change Order Bid Item 44 - MidAmerican Energy wanted the transformer to be located in the swing path of the east side gate. The gate style was changed to accommodate that location and to fully open the gate. Bid Item 49 - MidAmerican Transformer Pad was not included in the design. It is typically unknown at the time of design whether MidAmerican Energy will require a concrete pad for the transformer or if the transformer will be located on a power pole. MidAmerican Energy requested a ground mounted transformer. This work is required to power the lift station. 31-Days added to the final completion date to accommodate the work added in Change Order No. 1 for open cutting Grandview Av and the addition of Manhole No. 2 near Newton Av. CONTRACT PRICE SRF NON- SRF Original: $ 6,184,087.00 $ 6,184,087.00 $ - Previous C.O.s This C.O. $ 58,822.15 $ 27,787.73 $ 58,822.15 $ 27,787.73 $ $ - Contract Price with all approved $ 6,270,696.88 $ 6,270,696.88 $ - Total Change Orders: $ 86,609.88 1.40% Total CO % TOTAL $ 6,270,696.88 Original Completion Date: Revised Completion Date: CONTRACT TIME To Substantial To Final Completion Completion 11/30/2024 WRH CR 7 12/31/2024 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVE(/ /�/ �. 11�u /z-& z 9 U161 A, BY: SIGNED Owner (Authorized Signature) Date 9/16/2024 ACCEPTED: BY: August 30, 2024 Contractor (Authorized Signature) Date ACCEPTED: BY: August 30, 2024 AECOM Date AECOM 60726355 I 2 Project No. C.O. No. Project: CAR No. 7 Reference: RFQ # Chanye hull iui 14auuil Request (CAR) DATE 08/09/24 Job No. 2401-00-1428 Location Waterloo, IA Contract No. A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this authorization is requested so that the material may be purchased and to prevent any delay in field operations. Reason for Change: ( ) Design Request ( ) Owner Request ( ) Other ---- Explain ( ) Field Condition ( X) Suggested by Contractor 1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable) Project deadline extension request to accommodate change order #1. Grandview Av and MH No. 2 2) It is requested that the completion date be; by 31 calendar days. 3) Basis of Payment: a) ( ) Firm price for performing this change is ( ) increased / ( ) decreased by is ( ) increased / ( ) decreased by is ( ) increased / ( ) decreased by b) c) d) ( ( ( ) Unit Price ( X ) extended ( ) decreased $0.00 $0.00 $0.00 $0.00 Change to be performed per unit prices in Contract $0.00 The time required to prepare and agree upon a detailed estimate prior to proceeding with the change would unduly delay job progress. The following is an approximate estimate to assist Owner in determining whether or not change should be made. If notified to proceed, a detailed estimate in the form agreed upon, with supporting details, will be submitted after receipt of said notice. Approximate Estimate is $0.00 ( X ) CHANGE WILL NOT BE MADE PROCEED ON THE FOLLOWING BASIS: ( ) Firm Price ( ) Time and Material ( ) Estimate of Price ( ) Change in Completion Date ( ) Unit Price in Contract ( ) No Change Comments: No monetary change requested for CAR #7. Time extension only. Monetary requests were approved in change order #1. Submitted by: $u01 a Approved by Brad Oja, Project Manager Owner WRH, Inc. Date: 8/9/2024 Date: Project: CAR No. 8 Reference: RFQ # Chanye hull iui 14auuil Request (CAR) DATE 08/09/24 Job No. 2401-00-1428 Location Waterloo, IA Contract No. A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this authorization is requested so that the material may be purchased and to prevent any delay in field operations. Reason for Change: ( ) Design Request ( ) Owner Request ( ) Other ---- Explain ( X ) Field Condition ( ) Suggested by Contractor 1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable) Fence gate modification. Change gate from double -drive swinging gate to double -cantilever "rolling" style gate. Walk gate change already approved in CO#1, will be included in west cantilever gate and not perimeter fence. 2) It is requested that the completion date be; by 2 calendar days. 3) Basis of Payment: a) ( X ) Firm price for performing this change is ( X ) increased / ( ) decreased by is ( ) increased / ( ) decreased by is ( ) increased / ( ) decreased by b) c) d) ( ( ( ) Unit Price ( X ) extended ( ) decreased $1,942.50 $0.00 $0.00 $0.00 Change to be performed per unit prices in Contract $0.00 The time required to prepare and agree upon a detailed estimate prior to proceeding with the change would unduly delay job progress. The following is an approximate estimate to assist Owner in determining whether or not change should be made. If notified to proceed, a detailed estimate in the form agreed upon, with supporting details, will be submitted after receipt of said notice. Approximate Estimate is $1,942.50 CHANGE WILL NOT BE MADE PROCEED ON THE FOLLOWING BASIS: Firm Price Estimate of Price Unit Price in Contract Comments: ( ) Time and Material ( ) Change in Completion Date ( ) No Change Submitted by: $u01 a Approved by Brad Oja, Project Manager Owner WRH, Inc. Date: 8/9/2024 Date: Nag Change Autnonzation Request (CAR) Project: CAR No. 10 DATE 08/19/24 Job No. 2401-00-1428 Reference: RFQ # Location Waterloo, IA Contract No. A Change in the scope of work is indicated below and Owner's prompt approval or rejection of this authorization is requested so that the material may be purchased and to prevent any delay in field operations. Reason for Change: ( X ) Design Request ( ) Owner Request ( ) Other ---- Explain ( ) Field Condition ( ) Suggested by Contractor 1) Description of Change: (Refer to drawings, specification, addenda, bulletin if applicable) MidAmerican transformer pad 2) It is requested that the completion date be; by 5 calendar days. 3) Basis of Payment: a) ( X ) Firm price for performing this change is ( X ) increased / ( ) decreased by is ( ) increased / ( ) decreased by is ( ) increased / ( ) decreased by b) c) d) ( ( ( ) Unit Price ( X ) extended ( ) decreased $25,845.23 $0.00 $0.00 $0.00 Change to be performed per unit prices in Contract $0.00 The time required to prepare and agree upon a detailed estimate prior to proceeding with the change would unduly delay job progress. The following is an approximate estimate to assist Owner in determining whether or not change should be made. If notified to proceed, a detailed estimate in the form agreed upon, with supporting details, will be submitted after receipt of said notice. Approximate Estimate is $25,845.23 CHANGE WILL NOT BE MADE PROCEED ON THE FOLLOWING BASIS: Firm Price Estimate of Price Unit Price in Contract Comments: ( ) Time and Material ( ) Change in Completion Date ( ) No Change Submitted by: E.,1401 D Approved by Brad Oja, Project Manager Owner WRH, Inc. Date: 8/19/2024 Date: 08/19/24 C.A.R. Calculation C.A.R. # 10 Subcontractors Quantity Unit Unit Rate Line Total Team Services 2.0 EA $600.00 $1,200.00 $0.00 $0.00 $0.00 Sub -total $1,200.00 Material: Concrete 3.3 CY $205.00 $666.25 Rebar 0.2 TN $1,375.35 $275.07 Rock 24.0 TN $21.00 $504.00 $0.00 $0.00 $0.00 $0.00 Sub -total $1,445.32 Labor: Project Manager 2.0 Hr $195.17 $390.34 Carpenter 40.0 Hr $96.08 $3,843.20 Laborer 80.0 Hr $90.08 $7,206.40 Equipment Operator 24.0 Hr $102.55 $2,461.20 Foreman 20.0 Hr $105.09 $2,101.80 Superintendent 10.0 Hr $111.09 $1,110.90 Sub -total $17,113.84 Equipment: Field Truck 8.0 Hr $13.46 $107.68 Skid loader 8.0 Hr $53.86 $430.88 Scissor Lift Hr $22.44 $0.00 Excavator (Mini) 16.0 Hr $60.59 $969.44 Excavator (Mid -size) Hr $121.18 $0.00 Excavator (Large) Hr $215.42 $0.00 Crane Hr $333.23 $0.00 Dozer (small) Hr $121.18 $0.00 Dozer (large) Hr $127.91 $0.00 $1,508.00 Sub -total Totals from above Sales Tax on Material Contractor's Fee (Self -performed) Contractor's Fee (Sub -contracts) Bond & Insurance Total Proposed Change 0.00% 15.00% 5.00% 2.00% $21,267.16 $0.00 $3,010.07 $60.00 $25,845.23 $0.00 $25,845.23 MidAmerican transformer pad 2 of 2