Loading...
HomeMy WebLinkAboutAECOM-Supplemental Agreement No. 1-11.16.2009 AECOM AECOM 501 Sycamore Street,Suite 222,Waterloo, Iowa 50703 T 319.232.6531 F 319.232.0271 www.aecom.com Supplemental Agreement No. 1 Cedar River Water Trail Portages at Park Avenue, Paramount Park and 6th Street Dam Waterloo, Iowa WHEREAS, an Agreement for Professional Services was entered into by the City of Waterloo, Iowa ("City"), and AECOM Technical Services, Inc., previously known as Earth Tech, Inc. ("Consultant"), of Waterloo, Iowa, dated August 6, 2007, for the construction of two portages on the proposed Cedar River Water Trail in Waterloo, Iowa; and WHEREAS, the City and the Consultant now desire to enter into Supplemental Agreement No. 1 for Phase II, Construction-Related Services, for the construction of three portages on the north side of the Cedar River located near Park Avenue, Paramount Park and the 6th Street Dam. NOW THEREFORE, it is mutually agreed to amend the original Agreement for Professional Services as follows: Project Description The project consists of the construction of the three portages on the north side of the Cedar River located near Park Avenue, Paramount Park and the 6th Street Dam. The project will become part of the Cedar River Water Trail in Black Hawk County. II. Scope of Services The Scope of Services provided by the Consultant under this Agreement shall consist of construction staking, field review and contract administration. The Scope of Services to complete Phase II -Construction-Related Services is further defined as follows: Task 1. Attend a preconstruction conference attended by representatives of the Contractor, City, Consultant and affected utilities. Task 2. Provide construction-staking for horizontal and vertical controls for the project as follows: a. Set Project Control b. Set Stakes for Removal Limits c. Set Stakes for Park Avenue Portage d. Set Stakes for Paramount Park Portage e. Set Stakes for 6th Street Dam Portage f. Set Stakes for Bollards g. Assist in Locating Buoys h. Set Stakes for Signing Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Page 2 Task 4. Answer design interpretation questions from the City, Contractor, review staff and appropriate agencies. Task 5. Review bi-monthly applications for payment based on information provided by field review staff and Contractor and forward to the City for execution with recommendation for approval and payment. Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 7. Prepare and assist the City and Contractor in preparing and processing contract change orders. Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 9. Report to the City any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the City of any work that should be corrected or rejected. Task 10. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the City. Task 11. Participate in a review of the project with the City and review staff near completion and prepare a list of items to be completed or corrected. Task 12. Participate in a field observation of the completed project with the City and review staff before a final application for payment is processed for the Contractor. Task 13. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project-related documents. Task 14. Provide the City with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 15. Assist the City with the final close-out documentation from the Contractor. III. Compensation Compensation for the above services will be a lump sum fee of Forty-Six Thousand Dollars ($46,000.00) and shall not be exceeded without authorization of the City. Page 3 IV. In all other respects, the obligations of the City and the Consultant shall remain as specified in the Agreement for Professional Services dated August 6, 2007. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: CITY OF WATERLOO, IOWA By: ��u�-r� Date NOVON1,120/- \lb� Timothy J. y Mayor ATTEST: By: @afite..) ek45,t4,- 4 Ci4 AECOM TECHNICAL SERVICES, IN . By Date November 9, 2009 Joe A. Becker Vice President L:\work\ADMIN\AGREE\SUPPLE\SA1 CedarRiverWaterTrail.doc c''t>