FORM OF BID OR PROPOSAL
F.Y. 2010 SANITARY SEWER RELOCATION
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
1. The undersigned, being a Corporation existing under the laws of the State of
. c7c,u(-c_- , a Partnership consisting of the following partners:
, having familiarized (himself)
(themselves) (itself) with the existing conditions on the project area affecting the cost of the
work, and with the General Specifications, hereby proposes to furnish all supervision,
technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and
services, including utility and transportation services required to construct and complete this
F.Y. 2010 SANITARY SEWER RELOCATION, all in accordance with the General
Specifications for the attached Extra Work Authorization based on Time and Materials for a
cost not to exceed $35,649.17.
SUBMITTED BY: >-� ;��r Aco,A0,--,i )(.1..'
(Bidder)
C _ ceDox
,e;k r`o�ec A S0 �
(Address):,--
nED :
,..)::{..,t A.,,_.,,v_sl_d--- 4kV
(Title) (Date)
ACCEPTED BY CITY OF WATERLOO:
SIGNED BY: ---,..-7-77-9(0/
(Title) , l
VQ 1 ff0(1
.� Y�NI
(Date)
FORM OF BID Page 1 of 1
F.Y. 2010 SANITARY SEWER RELOCATION
• s
�EZ�RS�H PETERSON CONTRACTORS, INC.
'1AZRACZ'ilRS EXTRA WORK AUTHORIZATION
11C. .3:115MIMILMIDU
NEiNOEEN • IOWO
PO Box A Phone: 319-345-2713
Reinbeck,Iowa 50669 Fax:319-345-2991 wwW.peter soncontractors com
Project None City of Waterloo Sanitary Sewer Relocation - PCI Job# _.
Date
11/06/09 Extra Work Autorization#
Remarks or Description of Extra Work:
The Railroad is reconstructing a bridge along Broadway in Waterloo,IA and the new piers are in conflict with the existing Sanitary Sewer
line. PCI will relocate this Sanitary Sewer approximately 15'SE of the existing location to miss the new piers. This will be completed
with a series of manholes. Please note that PCI excludes all railroadflaggers for the project.We are providing this pricing as a Time and
Materials project Not to Exceed.
Total cost sh• all not exceed, $35,649. 17
Item# t Description I Quantity I Units I Unit Rate I %Mark Up I %Discount I Total Amount
Equipment&Labor
** Gradall Excavator 30.00 HR $180 00 0.00% 10.00% $4,860.00
* 315 Cat Excavator with Head Shaker 15.00 HR ;°$215.00 0.00% , "10.00%_ $2,902.50
.**
277 Cat Skid Loader ..:; ;:. 15.00 HR $110 00: 0 00%:' i0 00%`:' $1,485.00
D5 Cat Dozer, 5.00 .: .HR ;$150 00:;. 0.00% .10.00% ` $675.00
***** Laborer 35.00 HR $50.0.0, 0.0.09.6 0.00%:' $1,750.00
***** Supervisor : 35.00 HR $8500.. .0.00% .' 0.00%: $2,975.00
**"** Water Pump 72 00 HR.. i $25.00 0.00% 0.00% $1,800.00
**** 315 Cat Excavator with Breaker . 3.00 HR $215.00. 0.00%` 10.00% $580.50
****• 315 Cat Excavator • • 5.00 HR $170.00 0.00% : 10.00% $765.00
•
Mack End Dump ' • 1.00 HR $75.00 0.00%.` 10.00% $67.50
Mobilization of Equipment : 4.00 LD $350.00. 0.00% :' 0.00% $1,400.00
Equipment&Labor Subtotal- $19,260.50
Materials
o**** 48":Manhole Sections • 24•00 VF $104.00 15 00%`: 0 00% $2,870.40
***** •• 48°Manhole Base. 3 00 EA $175 00.: 15 00%;. 0 00%.:. $603.75
***** Neenah.R1643 3.00 _..::EA :$300.00 15,00% :000%...`.. $1,035.00
**** Chimney Seal .:'$00 :EA ``.:;$300 00 15 00%; fl 00%:.[: $1,035.00
***** 12''.Truss Pipe -9000 • LF $11.14 1500% 0.00% $1,148.85
1".Clean Bedding Stone. 76.00 TN $1418. 15 00%,: 0 00% $1,239.33
"**** 3:Clean Rock 125.00 TN $13.81 15.00%: 0.00% $1,985.19
1"Road Stone •• 125.00 TN $12.85 15 00% ; 0.00%0 $1,847.19
***** Concrete 14.00 CY $110.00 15.00%:: 0.00%.:. $1,771.00
Equipment&Labor Subtotal- $13,535.71
Bond!Insurance
Railroad Protective Ins,(2 Million Per 1.00 LS $2,500.00 0.00% 0.00% $2,500.00
Occurence/6 Million Aggregate)
***** Performance Payment Bond 1.00 LS - $352.96 0.00% 0.00% $352.96
Bond I Insurance- $2,852.96
TE1nRAt At"t44/1-
�� EXTRA WORK AUTHORIZATION *.
R E I M R E C R IOWA .,"
***** Performance Payment Bond I 1.00 LS $352.96 0.00% 0.00% $352.96
Bond/Insurance- $2,852.96
Total Amount: $35,649.17
The work covered by this authorization shall be performed in accordance with the same terms and conditions as included it the original contract,
Work Authorized and Changes Approved by;
Prime Contractor or Owner:
Peterson Contractors,Inc.
By. oc
4y,
Date: tt d 9 10°1 Date 11/06/2009