Loading...
HomeMy WebLinkAboutK. Cunningham Construction Co., Inc. - Change Order No,. 1 - 11.09.2009 CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: F.Y. 2010 Geraldine Road CONTRACT NO. 767 Date Prepared: November 6, 2009 AMOUNT: $26,692.80 INCREASE TO: K. Cunningham Construction Co., Inc. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated July 20, 2009. A. Description of change to be made or extra work to be done: 1. Exempt Bid Item No. 9, Special Backfill, Subgrade Repair, from consideration under the provisions of Section B. "Scope of Work," Paragraph 7 of the "General Specifications for Construction", for work that varies by more than twenty (20%) percent from the estimated quantities specified in the contract. 2. Increase Bid Item No. 9, from 100 CY to 857 CY equals a net increase of 757 CY. Quantity for subgrade repair is based on 12-inches of depth. 3. Furnish and install geogrid (Tensar BX1100 (BR-1), TENSAR BX4100 (SG-1) or Engineer-approved equal). 2,569 SY B. Reason for ordering change or extra work: Increase in subgrade repair and addition of geogrid was necessitated due to condition of poor subgrade soils. C. Settlement for cost of work to be made as follows: 1. No change in contract unit price of $25.25 per CY. 2. Agreement with contractor at $2.95 per SY. NET INCREASE $26,692.80 CITY OF WATERLOO BY: I((°t io°__ K. Cunningham Construction Co., Inc. Mayor Ti►M fiM Date CONTRACTOR BY: 11 6 o-5- Date ATTEST: 11 PRINTED NAME:- ( ( eu,vv .4-. 01 kX.ft ity Clerk( , ,i(fir Date �� JJ TITLE: FtMS;CI APPROVED: g, - Wog City Engineer Date 0 t