HomeMy WebLinkAboutFailor-Hurley Construction-Change Order No. 3-10.12.2009 CHANGE ORDER NO. 3 Owner: City of Waterloo,Iowa Date: October 8,2009 Project: Commercial Street Parking Garage Repairs,Phase I-Stairwells Owner's Contract No.: --- Contractor: Failor-Hurley Construction Date of Contract Start: May 18,2009 $ 621,100.00 You are directed to make the following changes in the Contract Documents. Description: 8010: Delete Sheet Metal Pipe Enclosure in Stair 3 and Paint to Match Rest of Stair ($ 912.00) 8011: Add Preparation and Painting for Two Garage Doors in Level 3 615.00 8012: Add Preparation and Painting on Mandoor in Level 1 150.00 8013: Add Preparation and Painting for All Green Metal Surfaces at Commercial Street Main Entrance... 6,639.00 8014: Add Preparation and Painting for Green Motor Vehicle Parking Office Exterior,West 5th Street Parking Garage 900.00 8015: Add Automatic Door Operators at Openings 5 and 7 on Subterranean Level and Opening 5 on Level 4 14,703.00 8016: Revise Double Doors Between Garage and Stair No.1 From 1 Active/1 Inactive to Both Active 11,264.00 8017: Add Plaster Finish Top of Walls to Match Surrounding Finish 920.00 TOTAL ADD $34.279.00 Reason for Change Order: 8010: To avoid conflicts on upper level and lower level and reduce potential for damage due to vandalism. 8011-14: Owner request subsequent to receiving bids. 8015: Enhance handicap use of Stairwell No.1. 8016: Provide both doors active to match previous door arrangement for ramp users. 8017: Raised ceiling resulted in strip of unfinished wall surface. CONTRACT PRICE CONTRACT TIMES (Calendar Days) To Completion Original: $ 621,100.00 Original: Sept.30,2009 Previous C.O.s(ADD/DEDUCT): $ 2,031.00 Previous C.O.s(ADD/DE-DUCT): 30 Days This C.O.(ADD/DEDUCT): $ 34,279.00 This C.O.(ADD/DEDUCT): 15 Days Contract Price With All Approved Change Orders: $ 653,348.00 REVISED: Nov. 15,2009 Revised Completion Date: Nov. 15,2009 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)ordered herein,including all impact,delays,and acceleration costs. Other than the dollar amount and time allowance listed above,there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL.BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO APPROVED: / i -cc By: 7, to`La Owner(Authorized Signatur 'p4-ivr(.&�r �"�A , Date: ACCEPTED: �4 ^U("' y�2 By: �0//5 )Vy Contar�ctor(Authorized Sig ature Date: AECOM 113100-Ph 1 3 Project No. Change Order No. 1131 00/CO3-CommStParking-Ph I.doc