Loading...
HomeMy WebLinkAboutCardinal Construction-Change Order-10.12.2009 AIA au Document G7OITM - 2001 Change Order PROJECT(Name and address): CHANGE ORDER NUMBER:001 OWNER:[] New Fire Station#8 for the City of DATE:September 29,2009 ARCHITECT:❑ Waterloo,IA. CONTRACTOR:❑ TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER:08068 FIELD:❑ Cardinal Construction,Inc. CONTRACT DATE:September 14,2009 531 Commercial Street CONTRACT FOR:General Construction OTHER:❑ PO Box 897 Waterloo,IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable,any undisputed amount attributable to previously executed Construction Change Directives) A. Please note the substantial completion date has been changed to September 30,2010 in lieu of July 30,2010 as originally stated in the contract. The original Contract Sum was $ 1,601,780.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 1,601,780.00 The Contract Sum will be unchanged by this Change Order in the amount of $ 0.00 The new Contract Sum including this Change Order will be $ 1,601,780.00 The Contract Time%Oil be increased by Sixty-two(62)days. The date of Substantial Completion as of the date of this Change Order therefore is September 30,2010. NOTE:This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects,PLC Cardinal Construction.Inc. City of Waterloo ARCHITECT(Firm name) CONTRACTOR(Finn name) OWNER(Firm name) 314 East 4th Street,Waterloo, IA 531 Commercial Street,PO Box 897, 715 Mulberry Street,Waterloo,IA 50703 Waterloo,IA 50704 50703 ADDRESS ? ADDRE ADDRESS tV� , c - Y(Signature) BY(Signanae) BY(Signature) Daniel C.Channer Jon Mixdorf Timothy Hurley (Typed name) (Typed name) (Typed name) 1 /z0�ci9 9-30- © � 10- r2-1041 DATE DATE DATE MA Document G701 TM-2001.Copyright 22 1979,1987,2000 and 2001 by The American Institute of Architects,All rights reserved.WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this A1Aa Document,or any 1 portion of it,may result in severe civil and criminal oenafties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 10:33.14 on 09/29/2009 under Order No.1000367524_1 which expires on 08/21/2010,and is not for resale. User Notes: (1817209427) 1tAiA Document G701TM - 2001 Change Order PROJECT(Name and address): CHANGE ORDER NUMBER:001 OWNER:❑ New Fire Station#8 for the City of DATE: September 29,2009 ARCHITECT:❑ Waterloo,IA. CONTRACTOR:❑ TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER:08068 FIELD:❑ Cardinal Construction,Inc. CONTRACT DATE:September 14,2009 531 Commercial Street CONTRACT FOR:General Construction OTHER:❑ PO Box 897 Waterloo,IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable,any undisputed amount attributable to previously executed Construction Change Directives) A. Please note the substantial completion date has been changed to September 30,2010 in lieu of July 30,2010 as originally stated in the contract. The original Contract Sum was $ 1,601,780.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 1,601,780.00 The Contract Sum will be unchanged by this Change Order in the amount of $ 0.00 The new Contract Sum including this Change Order will be $ 1,601,780.00 The Contract Time will be increased by Sixty-two(62)days. The date of Substantial Completion as of the date of this Change Order therefore is September 30,2010. NOTE:This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects,PLC Cardinal Construction,Inc. City of Waterloo ARCHITECT(Finn name) CONTRACTOR(Firm name) OWNER(Firm name) 314 East 4th Street,Waterloo,IA 531 Commercial Street,PO Box 897, 715 Mulberry Street,Waterloo,IA 50703 Waterloo,IA 50704 50703 ADDRESS ADDRESS ADDRESS xzt44...fr BY(Signature) BY(Signature (Signature) Daniel C.Channer Jon Mixdorf Timothy Hurley (Typed name) (Typed name) (Typed name) 30 c 9' (6 --pp`/ DATE DATE DATE AIA Document G701 TM-2001.Copyright©1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA®Document,or any 1 portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 10:33:14 on 09/29/2009 under Order No.1000367524_1 which expires on 08/21/2010,and is not for resale. User Notes: (1817209427) •a 1