CITY OF WATERLOO, IOWA
LA PORTE ROAD/HESS ROAD CORRIDOR IMPROVEMENTS
SUPPLEMENTAL AGREEMENT NO. 3
WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo (Client), 715
Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite
222, Waterloo, Iowa, dated October 28, 2019, for preliminary and final design of improvements to the La Porte
Road / Hess Road Corridor from just north of Mitchell Avenue to the Shaulis Road intersection; and
WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 dated August 2, 2021, for
Phase IIA - Final Design the La Porte Road / Hess Road Corridor Improvements Project from Shaulis
Road to south of San Marnan Drive; and
WHEREAS, the Client and ATS entered into Supplemental Agreement No. 2 dated January 23, 2024, for
Phase IIB - Final Design the La Porte Road / Hess Road Corridor Improvements Project from just north
of Grimm Street to the Bopp Street intersection; and
WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 3 for additional
Final Design Services for the La Porte Road Corridor Improvements Project from Shaulis Road to the
Bopp Street intersection and Conceptual Design for the Highway 20 and La Porte Road interchange.
NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as
follows:
I. PROJECT DESCRIPTION
This project consists of improvements to the La Porte Road Corridor from just north of Mitchell
Avenue to the Shaulis Road intersection, including modifications to the existing traffic operations,
safety improvements, access management changes, transit accommodations, bike/pedestrian
facilities and corridor aesthetics.
The original design services have been split into three phases.
Phase I — Preliminary Engineering
Phase II — Final Design
Phase III — Construction -Related Services
This agreement is for additional Final Design Services on the La Porte Road Corridor from Shaulis
Road to Bopp Street and concept development of the Highway 20 and La Porte Road interchange
including traffic operations analyses.
II. SCOPE OF SERVICES
ADDITIONAL FINAL DESIGN SERVICES
Division 11— Final Design (Local Funding)
Final Design (Tasks 1-3)
These tasks include additional design modifications of the existing quadruple box culvert, culvert
railing, roadway lighting and additional project reviews and submittals. These tasks will be
completed by HR Green.
Task 1 — Structural and Railing Modifications (HR Green)
AECOM
Task 2 — Additional Lighting Modifications (HR Green)
Task 3 — Additional Project Reviews and Submittals(HR Green)
Division II — Local Funding
Highway 20 and La Porte Road Interchange Concept Development
Data Collection (Tasks 4-5)
Page 2
These tasks consist of collecting and reviewing data from the Iowa DOT and INRCOG for Highway
20, and available information from past studies and reports for the project location. It is anticipated
that AECOM will use the La Porte Road Traffic Analysis for the traffic data including volume data
(traffic forecasts, ADT, turning -movement counts, truck percentages, pedestrian and bicycle
counts, and speed studies), travel demand model and peak hour traffic forecast volumes, traffic
signal timing, as well as the Phase 1 design plans and aerial photography.
Task 4 — Data Collection
Task 5 — Review Data
Operational Analysis and Traffic Forecasting Memorandum (Tasks 6-9)
These tasks are to perform AM and PM peak hour level of service values for roadway links,
merge/diverge points, and intersections for existing, no -build, and proposed -build conditions.
Traffic forecasts will be developed using growth rates from the travel demand model provided by
INRCOG. Analyses will be completed using Highway Capacity Software (HCS) and/or Synchro.
AECOM will provide software outputs for analyses detailing performance factors including level of
service, total delay and 95th percentile queue lengths. AECOM will review queue lengths at ramp
terminal intersections and determine possible impacts to adjacent access points.
Task 6 — Traffic Forecasting and Coordination with INRCOG
Task 7 — Operational Analysis (One Alternative)
Task 8 — Queue Length Review
Task 9 — Operational Analysis and Traffic Forecasting Memorandum
Conceptual Interchange Exhibit (Task 10)
This task include development of conceptual roadway exhibits from aerial images and roadway
alignments. The proposed interchange exhibit will be developed at a concept planning level for one
alternative.
Task 10 — Conceptual Interchange Exhibit
Project Administration (Tasks 11-14)
These tasks include project administration, coordination and two review meetings with Iowa DOT,
City staff and AECOM, two project review meetings with City staff and AECOM, and quality control
review. The following identifies tasks leading to the completion of project administration, meetings
and coordination during this phase of the project.
Task 11 — Iowa DOT Meeting (2)
Task 12 — Project Administration
Task 13 — Project Review Meetings (2)
Task 14 — Quality Control Review
AECOM
Division 11 (Local Funding)
Phase I Pre -Construction Conference
Pre -Construction Conference (Tasks 15-16)
Task 15 — Preparing Agenda and Coordination for Pre -Construction Conference
Task 16 — Conducting Pre -Construction Conference and Distribution of Meeting Minutes
Exclusions
Page 3
The following design elements are not anticipated for this phase of the project and are not included
in the Scope of Services but will be added to the project by supplemental agreement as required.
• Safey Analysis
• Methods and Assumptions Memo
• Interchange Justification Report
• No -Build Analysis
• Topographic Survey & Base Map Development
• Renderings
• Preliminary and Final Interchange Design
• Traffic Simulation Video
• IOR Report
• Geometric Alternative Layout
III. COMPENSATION
The Consultant shall be reimbursed for the actual costs incurred in accordance with Article VI of
the original Agreement.
The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for this
supplemental agreement is $66,800.00, as stated below and shown in attached documents, and
shall be integrated with the fees in the original agreement and Supplemental Agreements 1 and 2.
Estimated Actual Costs
Fixed Fee (Prime Only)
Contingency (Prime Only)
Contingency (Subs)
Maximum Amount Payable
Estimated Actual Costs
Fixed Fee (Prime Only)
Contingency (Prime Only)
Contingency (Subs)
Maximum Amount Payable
Original Agreement S.A. No. 1 S.A. No. 2 S.A. No. 3 Total
Division I Division I Division I
Division I (SWAP) (SWAP) (SWAP) (SWAP) Division I
$305,700.00 $736,100.00 $113,900.00 $0.00 $1,155,700.00
26,200.00 69,800.00 14,500.00 0.00 110,500.00
21,200.00 54,700.00 11,400.00 0.00 87,300.00
2,900.00 8,200.00 0.00 0.00 11,100.00
$356,000.00 $868,800.00 $139,800.00 $0.00 $1,364,600.00
Original Agreement S.A. No. 1 S.A. No. 2 S.A. No. 3 Total
Division II Division II Division II Division II
Division II (Local) (Local) (Local) (Local) (Local)
$160,400.00 $101,500.00 $6,100.00 $55,700.00 $323,700.00
8,600.00 13,000.00 800.00 5,700.00 28,100.00
6,800.00 10,200.00 600.00 4,400.00 22,000.00
5,500.00 0.00 0.00 1,000.00 6,500.00
$181,300.00
$124,700.00 $7,500.00
$66,800.00 $380,300.00
AECOM
Page 4
IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the
Professional Services Agreement dated October 28, 2019.
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 3 as of the
dates shown below:
APPROVED FOR CITY OF WATERLOO APPROVED FOR AECOM
By: 62ueft tz
By: edit, c;4?/47r-
Printed Name: Quentin Hart Printed Name: Michelle M. Sweeney, PE PTOE
Title: Mayor Title: Associate Vice President
10/7/2024
Date: Date: 09/18/2024
L:\Secure DCS\Administration\AGREE\SUPPLE\SA3 WAT La Porte Rd Hess Rd.docx
La Porte Road - Shaulis Road to Bopp Street
SA No. 3 - Final Design
City of Waterloo, Iowa
COST ANALYSIS - Division II - LOCAL
I. Direct Labor Cost (AECOM Technical Services)
Category Hours Rate/Hour Amount
2.3 Senior Professional 18 $93.42 $1,681.56
2.0 Project Professional 0 $80.55 $0.00
3.0 Staff Professional 70 $58.20 $4,074.00
3.2 Staff Professional 0 $61.18 $0.00
4.0 Professional 192 $36.60 $7,027.20
4.3 Professional 88 $41.35 $3,638.80
5.0 CADD Operator II 16 $39.35 $629.60
7.1 SeniorTechnician 6 $50.00 $300.00
8.1 Technician 6 $38.44 $230.64
9.1 Project Support 44 $40.53 $1,783.32 $19,365.12
440
II. Payroll Burden and Overhead Provisional Costs 125.50% $24,303.23
III. Direct Project Expenses
Category Units Rate/Unit Amount
Mileage 0 0.67 0.00
Per Diem 0 50.00 0.00
Lodging 0 90.00 0.00
B/W Copies 0 0.06 0.00
Color Copies 0 0.22 0.00
Total Station Survey Equip. 0 15.00 0.00
GPS Survey Equipment 0 15.00 0.00
Miscellaneous, Other 500.00
$500.00
IV. AECOM Estimated Actual Costs $44,168.35
Rounded $44,200.00
V. Subcontract Expense
HR Green $11,500.00
$11, 500.00
VI. Estimated Actual Costs $55,700.00
VII. Fixed Fee (13%) $5,676.88
Rounded $5,700.00
VIII. Contingency (10%) $4,420.00
Rounded $5,400.00
AECOM $4,400.00
HR Green $1,000.00
IX. Maximum Amount Payable $66,800.00
La Porte Road - Shaulis Road to Bopp Street
SA No. 3 - Final Design
City of Waterloo, Iowa
AECOM Technical Services, Inc.
Staff Hour Estimate
Description of Work
2.3 Senior
Prof
2.0 Project
Prof
3.0 Staff
Prof
3.2 Staff
Prof
4.0 Prof
4.3 Prof
5.0 CADD
Op II
7.1 Senior
Technician
8.1
Technician
9.1 Project
Support
Total
Division I - SWAP Funding
Additional Final Design - HR Green
1 Structural and Railing Modifications (HR Green).
0
2 Additional Lighting Modifications (HR Green).
0
3 Additional Project Reviews and Submittals (HR Green).
0
Division I- SWAP Funding - Total
u
u
u
u
OM
Division II - LOCAL Funding
wa igy an a o oa Interchange Concept Development
0
4 Data Collection
8
32
8
48
5 Review Data
8
32
8
48
6 Traffic Forecasting and/or Cordination with MPO
28
20
48
7 Operational Analysis (One Alternative)
4
64
68
8 Queue Length Review
4
12
16
9 Final Operational Analysis and Traffic Forecasting Memorandum
8
32
40
10 Conceptual Roadway Exhibit
2
16
16
34
11 Iowa DOT Meetings
4
8
12
12 Project Administration
20
20
40
13 Project Review Meetings
4
8
12
14 Quality Control Review
4
20
20
44
Phase I Preconstruction Conference
15 Preparing Agenda and Preparation for Pre -Construction Conference
2
2
2
2
0
12
4
16 Conducting Pre -Construction Conference and Distribution of Meeting Minutes
2
6
4
4
2
18
Division 11- LOCAL Fundin - Total
TOTAL HOURS
18
0
70
0
192
88
16
6
6
44
440
La Porte Road - Shaulis Road to Bopp Street
SA No. 3 - Final Design
City of Waterloo, Iowa
HR Green
COST ANALYSIS - Division II - Local
I. Direct Labor Cost
Category Hours Rate/Hour Amount
Senior Prof. (Roadway) 2 $71.61 $143.22
Senior Prof. (Electrical) 2 $67.96 $135.92
Senior Prof. (Structural) 20 $55.71 $1,114.20
Professional (Electrical) 8 $78.85 $630.80
Professional (Structural) 30 $41.58 $1,247.40
Trans. Des. II (Lighting) 11 $31.23 $343.53
Jr. Professional (Structutal) 0 $33.06 $0.00
Admin. Coordinator 0 $31.30 $0.00 $3,615.07
73
II. Payroll Burden and Overhead Costs 184.56% $6,671.97
III. Direct Project Expenses
Category Units Rate/Unit Amount
Mileage 0 0.67 0.00
Misc 0 0.00
$0.00
IV. Estimated Actual Costs (1+11+111) $10,287.04
Rounded $10,300.00
V. Fixed Fee (12%) $1,234.45
Rounded $1,200.00
VI. Contingency (10%) $1,028.70
Rounded $1,000.00
VII. Maximum Amount Payable (IV+V+VI) $12,500.00
La Porte Road - Shaulis Road to Bopp Street
SA No. 3 - Final Design
City of Waterloo, Iowa
HR Green
Staff Hour Estimate
Wiles
Junod
Connor
Brown
Allenback
Tvrell
Description of Work
PIC
Senior
Prof. (Rdwy)
Senior
Prof. (Elec)
Senior
Prof. (Struc)
Prof.
(Electrical)
Prof.
(Structural)
Trans. Des.
II (Lighting)
Jr. Prof.
(Structural)
Admin.
Coordinator
Total
Division I - SWAP Funding
20
INK
30
50
Additional Final Design - HR Green
1 Structural and Railing Modifications (HR Green).
2 Additional Lighting Modifications (HR Green).
2
8
11
21
3 Additional Project Reviews and Submittals (HR Green).
2
2
Division I - SWAP Funding - Total
0
2
30
11
TOTAL HOURS
0
2
2
20
8
30
11
0
0
73