Loading...
HomeMy WebLinkAboutAECOM - SA3 La Porte Rd Hess Rd. Cont. No. 1016 - 10.7.24pdfAECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO, IOWA LA PORTE ROAD/HESS ROAD CORRIDOR IMPROVEMENTS SUPPLEMENTAL AGREEMENT NO. 3 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo (Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated October 28, 2019, for preliminary and final design of improvements to the La Porte Road / Hess Road Corridor from just north of Mitchell Avenue to the Shaulis Road intersection; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 dated August 2, 2021, for Phase IIA - Final Design the La Porte Road / Hess Road Corridor Improvements Project from Shaulis Road to south of San Marnan Drive; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 2 dated January 23, 2024, for Phase IIB - Final Design the La Porte Road / Hess Road Corridor Improvements Project from just north of Grimm Street to the Bopp Street intersection; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 3 for additional Final Design Services for the La Porte Road Corridor Improvements Project from Shaulis Road to the Bopp Street intersection and Conceptual Design for the Highway 20 and La Porte Road interchange. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. PROJECT DESCRIPTION This project consists of improvements to the La Porte Road Corridor from just north of Mitchell Avenue to the Shaulis Road intersection, including modifications to the existing traffic operations, safety improvements, access management changes, transit accommodations, bike/pedestrian facilities and corridor aesthetics. The original design services have been split into three phases. Phase I — Preliminary Engineering Phase II — Final Design Phase III — Construction -Related Services This agreement is for additional Final Design Services on the La Porte Road Corridor from Shaulis Road to Bopp Street and concept development of the Highway 20 and La Porte Road interchange including traffic operations analyses. II. SCOPE OF SERVICES ADDITIONAL FINAL DESIGN SERVICES Division 11— Final Design (Local Funding) Final Design (Tasks 1-3) These tasks include additional design modifications of the existing quadruple box culvert, culvert railing, roadway lighting and additional project reviews and submittals. These tasks will be completed by HR Green. Task 1 — Structural and Railing Modifications (HR Green) AECOM Task 2 — Additional Lighting Modifications (HR Green) Task 3 — Additional Project Reviews and Submittals(HR Green) Division II — Local Funding Highway 20 and La Porte Road Interchange Concept Development Data Collection (Tasks 4-5) Page 2 These tasks consist of collecting and reviewing data from the Iowa DOT and INRCOG for Highway 20, and available information from past studies and reports for the project location. It is anticipated that AECOM will use the La Porte Road Traffic Analysis for the traffic data including volume data (traffic forecasts, ADT, turning -movement counts, truck percentages, pedestrian and bicycle counts, and speed studies), travel demand model and peak hour traffic forecast volumes, traffic signal timing, as well as the Phase 1 design plans and aerial photography. Task 4 — Data Collection Task 5 — Review Data Operational Analysis and Traffic Forecasting Memorandum (Tasks 6-9) These tasks are to perform AM and PM peak hour level of service values for roadway links, merge/diverge points, and intersections for existing, no -build, and proposed -build conditions. Traffic forecasts will be developed using growth rates from the travel demand model provided by INRCOG. Analyses will be completed using Highway Capacity Software (HCS) and/or Synchro. AECOM will provide software outputs for analyses detailing performance factors including level of service, total delay and 95th percentile queue lengths. AECOM will review queue lengths at ramp terminal intersections and determine possible impacts to adjacent access points. Task 6 — Traffic Forecasting and Coordination with INRCOG Task 7 — Operational Analysis (One Alternative) Task 8 — Queue Length Review Task 9 — Operational Analysis and Traffic Forecasting Memorandum Conceptual Interchange Exhibit (Task 10) This task include development of conceptual roadway exhibits from aerial images and roadway alignments. The proposed interchange exhibit will be developed at a concept planning level for one alternative. Task 10 — Conceptual Interchange Exhibit Project Administration (Tasks 11-14) These tasks include project administration, coordination and two review meetings with Iowa DOT, City staff and AECOM, two project review meetings with City staff and AECOM, and quality control review. The following identifies tasks leading to the completion of project administration, meetings and coordination during this phase of the project. Task 11 — Iowa DOT Meeting (2) Task 12 — Project Administration Task 13 — Project Review Meetings (2) Task 14 — Quality Control Review AECOM Division 11 (Local Funding) Phase I Pre -Construction Conference Pre -Construction Conference (Tasks 15-16) Task 15 — Preparing Agenda and Coordination for Pre -Construction Conference Task 16 — Conducting Pre -Construction Conference and Distribution of Meeting Minutes Exclusions Page 3 The following design elements are not anticipated for this phase of the project and are not included in the Scope of Services but will be added to the project by supplemental agreement as required. • Safey Analysis • Methods and Assumptions Memo • Interchange Justification Report • No -Build Analysis • Topographic Survey & Base Map Development • Renderings • Preliminary and Final Interchange Design • Traffic Simulation Video • IOR Report • Geometric Alternative Layout III. COMPENSATION The Consultant shall be reimbursed for the actual costs incurred in accordance with Article VI of the original Agreement. The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for this supplemental agreement is $66,800.00, as stated below and shown in attached documents, and shall be integrated with the fees in the original agreement and Supplemental Agreements 1 and 2. Estimated Actual Costs Fixed Fee (Prime Only) Contingency (Prime Only) Contingency (Subs) Maximum Amount Payable Estimated Actual Costs Fixed Fee (Prime Only) Contingency (Prime Only) Contingency (Subs) Maximum Amount Payable Original Agreement S.A. No. 1 S.A. No. 2 S.A. No. 3 Total Division I Division I Division I Division I (SWAP) (SWAP) (SWAP) (SWAP) Division I $305,700.00 $736,100.00 $113,900.00 $0.00 $1,155,700.00 26,200.00 69,800.00 14,500.00 0.00 110,500.00 21,200.00 54,700.00 11,400.00 0.00 87,300.00 2,900.00 8,200.00 0.00 0.00 11,100.00 $356,000.00 $868,800.00 $139,800.00 $0.00 $1,364,600.00 Original Agreement S.A. No. 1 S.A. No. 2 S.A. No. 3 Total Division II Division II Division II Division II Division II (Local) (Local) (Local) (Local) (Local) $160,400.00 $101,500.00 $6,100.00 $55,700.00 $323,700.00 8,600.00 13,000.00 800.00 5,700.00 28,100.00 6,800.00 10,200.00 600.00 4,400.00 22,000.00 5,500.00 0.00 0.00 1,000.00 6,500.00 $181,300.00 $124,700.00 $7,500.00 $66,800.00 $380,300.00 AECOM Page 4 IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated October 28, 2019. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 3 as of the dates shown below: APPROVED FOR CITY OF WATERLOO APPROVED FOR AECOM By: 62ueft tz By: edit, c;4?/47r- Printed Name: Quentin Hart Printed Name: Michelle M. Sweeney, PE PTOE Title: Mayor Title: Associate Vice President 10/7/2024 Date: Date: 09/18/2024 L:\Secure DCS\Administration\AGREE\SUPPLE\SA3 WAT La Porte Rd Hess Rd.docx La Porte Road - Shaulis Road to Bopp Street SA No. 3 - Final Design City of Waterloo, Iowa COST ANALYSIS - Division II - LOCAL I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount 2.3 Senior Professional 18 $93.42 $1,681.56 2.0 Project Professional 0 $80.55 $0.00 3.0 Staff Professional 70 $58.20 $4,074.00 3.2 Staff Professional 0 $61.18 $0.00 4.0 Professional 192 $36.60 $7,027.20 4.3 Professional 88 $41.35 $3,638.80 5.0 CADD Operator II 16 $39.35 $629.60 7.1 SeniorTechnician 6 $50.00 $300.00 8.1 Technician 6 $38.44 $230.64 9.1 Project Support 44 $40.53 $1,783.32 $19,365.12 440 II. Payroll Burden and Overhead Provisional Costs 125.50% $24,303.23 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 0 0.67 0.00 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 0 0.06 0.00 Color Copies 0 0.22 0.00 Total Station Survey Equip. 0 15.00 0.00 GPS Survey Equipment 0 15.00 0.00 Miscellaneous, Other 500.00 $500.00 IV. AECOM Estimated Actual Costs $44,168.35 Rounded $44,200.00 V. Subcontract Expense HR Green $11,500.00 $11, 500.00 VI. Estimated Actual Costs $55,700.00 VII. Fixed Fee (13%) $5,676.88 Rounded $5,700.00 VIII. Contingency (10%) $4,420.00 Rounded $5,400.00 AECOM $4,400.00 HR Green $1,000.00 IX. Maximum Amount Payable $66,800.00 La Porte Road - Shaulis Road to Bopp Street SA No. 3 - Final Design City of Waterloo, Iowa AECOM Technical Services, Inc. Staff Hour Estimate Description of Work 2.3 Senior Prof 2.0 Project Prof 3.0 Staff Prof 3.2 Staff Prof 4.0 Prof 4.3 Prof 5.0 CADD Op II 7.1 Senior Technician 8.1 Technician 9.1 Project Support Total Division I - SWAP Funding Additional Final Design - HR Green 1 Structural and Railing Modifications (HR Green). 0 2 Additional Lighting Modifications (HR Green). 0 3 Additional Project Reviews and Submittals (HR Green). 0 Division I- SWAP Funding - Total u u u u OM Division II - LOCAL Funding wa igy an a o oa Interchange Concept Development 0 4 Data Collection 8 32 8 48 5 Review Data 8 32 8 48 6 Traffic Forecasting and/or Cordination with MPO 28 20 48 7 Operational Analysis (One Alternative) 4 64 68 8 Queue Length Review 4 12 16 9 Final Operational Analysis and Traffic Forecasting Memorandum 8 32 40 10 Conceptual Roadway Exhibit 2 16 16 34 11 Iowa DOT Meetings 4 8 12 12 Project Administration 20 20 40 13 Project Review Meetings 4 8 12 14 Quality Control Review 4 20 20 44 Phase I Preconstruction Conference 15 Preparing Agenda and Preparation for Pre -Construction Conference 2 2 2 2 0 12 4 16 Conducting Pre -Construction Conference and Distribution of Meeting Minutes 2 6 4 4 2 18 Division 11- LOCAL Fundin - Total TOTAL HOURS 18 0 70 0 192 88 16 6 6 44 440 La Porte Road - Shaulis Road to Bopp Street SA No. 3 - Final Design City of Waterloo, Iowa HR Green COST ANALYSIS - Division II - Local I. Direct Labor Cost Category Hours Rate/Hour Amount Senior Prof. (Roadway) 2 $71.61 $143.22 Senior Prof. (Electrical) 2 $67.96 $135.92 Senior Prof. (Structural) 20 $55.71 $1,114.20 Professional (Electrical) 8 $78.85 $630.80 Professional (Structural) 30 $41.58 $1,247.40 Trans. Des. II (Lighting) 11 $31.23 $343.53 Jr. Professional (Structutal) 0 $33.06 $0.00 Admin. Coordinator 0 $31.30 $0.00 $3,615.07 73 II. Payroll Burden and Overhead Costs 184.56% $6,671.97 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 0 0.67 0.00 Misc 0 0.00 $0.00 IV. Estimated Actual Costs (1+11+111) $10,287.04 Rounded $10,300.00 V. Fixed Fee (12%) $1,234.45 Rounded $1,200.00 VI. Contingency (10%) $1,028.70 Rounded $1,000.00 VII. Maximum Amount Payable (IV+V+VI) $12,500.00 La Porte Road - Shaulis Road to Bopp Street SA No. 3 - Final Design City of Waterloo, Iowa HR Green Staff Hour Estimate Wiles Junod Connor Brown Allenback Tvrell Description of Work PIC Senior Prof. (Rdwy) Senior Prof. (Elec) Senior Prof. (Struc) Prof. (Electrical) Prof. (Structural) Trans. Des. II (Lighting) Jr. Prof. (Structural) Admin. Coordinator Total Division I - SWAP Funding 20 INK 30 50 Additional Final Design - HR Green 1 Structural and Railing Modifications (HR Green). 2 Additional Lighting Modifications (HR Green). 2 8 11 21 3 Additional Project Reviews and Submittals (HR Green). 2 2 Division I - SWAP Funding - Total 0 2 30 11 TOTAL HOURS 0 2 2 20 8 30 11 0 0 73