HomeMy WebLinkAboutBoulder Contracting CO # - WCC Underground Parking Ramp Repairs Project - 10.7.24CHANGE ORDER NO. 2
Owner City of Waterloo Date: 9/16/2024
Project Waterloo Convention Center Parking Ramp Repairs
Owner's Contract No. Contractor: Boulder Contrating, LLC.
Date of Contact Start 5/13/2024 Contract Amount: $ 53,650.00
You are directed to make the following changes in the Contract Documents, Description:
5 Electrical Conduit Removal and Reinstall $ 3,393.50 /LS x 1 LS $ 3,393.50
TOTAL ADDITIONS
$ 3,393.50
Reason for Change Order
5 For electrical conduit removal and reinstallation to install plaster replacement and to restore to previous location.
Lump Sum price includes prime 10% markup.
CONTRACT PRICE
Original: $ 53,650.00 Original Completion Date:
Previous C.O.s (ADD/DEDUCT) $ 121,965.00
This C.O. (ADD/DEDUCT) $ 3,393.50 Revised Completion Date:
Contract Price with all approved
Change Orders: $ 179,008.50
CONTRACT TIME
To Substantial To Final
Completion Completion
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the changels) ordered herein,
including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further
time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
APPROVE[//•z n�
BY: %/U e �� T�
Owner (Authorized Signature)
ACCEPTED:
BY:
Contractor (Authorized Signature)
ACCEPTED:
BY:
10/7/2024
Date
Date
AECOM Date
AECOM
60720067 I 2
Project No. C.O. No.
ESTIMATE
Steinmeyer Electric LLC
25499 200th St
Grundy Center, IA 50638
steinmeyerelectric@gmail.com
(319)269-2297
C111121AEVIEN
Boulder Contracting
Bill to
5 Sullivan Brothers Parking Ramp
Waterloo, IA 50702
Estimate details
Estimate no.: 1122
Estimate date: 09/09/2024
Ship to
Boulder Contracting
Grundy Center, Iowa 50638
# Date Product or service
1.
2.
Parking Garage
Material
Description
Will install a field built wall to support the 2-1/2" conduit that is
existing.
The conduit needs to be dropped so the ceiling plaster can be
repaired.
Existing straps will be removed where needed to lower the
conduit for the ceiling repair.
Will install new straps when the ceiling repair is completed.
Straps will be placed according to National Electric Code.
Will support the 1-1/4" conduit with a field built wall. Existing
straps will be removed where needed to lower the conduit for the
ceiling repair.
Will install new straps when the repair is done.
Will lower the existing 1" conduit wire that is coming from the
12x12x4 hoffman box. Wire is being used for computer
networking.
Will temporarily strap conduits to the field built wall to support the
existing conduits.
Conduit is metal and can not guarantee that it will move to the
required spacing needed to repair the ceiling. If additional work is
required it will be billed as an extra. The 2-1/2" conduit is a sub
feed and exits the parking garage in PVC conduit underground. If
the conduit does not sag enough then locating where the conduit
goes and shutting it down will be required.
2x6 lumber for the field built walls.
(8) 2-1/2" mini straps
(25) 3"x10-24 toggle bolts.
(6) 1-1/4" mini straps.
Total $3,085.00
Note to customer
Thank you for the opportunity to submit an estimate. All work will be
done in accordance with the National Electric Code. No trenching or
utility costs figured in this estimate.
Accepted date Accepted by