Loading...
HomeMy WebLinkAboutBoulder Contracting CO # - WCC Underground Parking Ramp Repairs Project - 10.7.24CHANGE ORDER NO. 2 Owner City of Waterloo Date: 9/16/2024 Project Waterloo Convention Center Parking Ramp Repairs Owner's Contract No. Contractor: Boulder Contrating, LLC. Date of Contact Start 5/13/2024 Contract Amount: $ 53,650.00 You are directed to make the following changes in the Contract Documents, Description: 5 Electrical Conduit Removal and Reinstall $ 3,393.50 /LS x 1 LS $ 3,393.50 TOTAL ADDITIONS $ 3,393.50 Reason for Change Order 5 For electrical conduit removal and reinstallation to install plaster replacement and to restore to previous location. Lump Sum price includes prime 10% markup. CONTRACT PRICE Original: $ 53,650.00 Original Completion Date: Previous C.O.s (ADD/DEDUCT) $ 121,965.00 This C.O. (ADD/DEDUCT) $ 3,393.50 Revised Completion Date: Contract Price with all approved Change Orders: $ 179,008.50 CONTRACT TIME To Substantial To Final Completion Completion It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the changels) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVE[//•z n� BY: %/U e �� T� Owner (Authorized Signature) ACCEPTED: BY: Contractor (Authorized Signature) ACCEPTED: BY: 10/7/2024 Date Date AECOM Date AECOM 60720067 I 2 Project No. C.O. No. ESTIMATE Steinmeyer Electric LLC 25499 200th St Grundy Center, IA 50638 steinmeyerelectric@gmail.com (319)269-2297 C111121AEVIEN Boulder Contracting Bill to 5 Sullivan Brothers Parking Ramp Waterloo, IA 50702 Estimate details Estimate no.: 1122 Estimate date: 09/09/2024 Ship to Boulder Contracting Grundy Center, Iowa 50638 # Date Product or service 1. 2. Parking Garage Material Description Will install a field built wall to support the 2-1/2" conduit that is existing. The conduit needs to be dropped so the ceiling plaster can be repaired. Existing straps will be removed where needed to lower the conduit for the ceiling repair. Will install new straps when the ceiling repair is completed. Straps will be placed according to National Electric Code. Will support the 1-1/4" conduit with a field built wall. Existing straps will be removed where needed to lower the conduit for the ceiling repair. Will install new straps when the repair is done. Will lower the existing 1" conduit wire that is coming from the 12x12x4 hoffman box. Wire is being used for computer networking. Will temporarily strap conduits to the field built wall to support the existing conduits. Conduit is metal and can not guarantee that it will move to the required spacing needed to repair the ceiling. If additional work is required it will be billed as an extra. The 2-1/2" conduit is a sub feed and exits the parking garage in PVC conduit underground. If the conduit does not sag enough then locating where the conduit goes and shutting it down will be required. 2x6 lumber for the field built walls. (8) 2-1/2" mini straps (25) 3"x10-24 toggle bolts. (6) 1-1/4" mini straps. Total $3,085.00 Note to customer Thank you for the opportunity to submit an estimate. All work will be done in accordance with the National Electric Code. No trenching or utility costs figured in this estimate. Accepted date Accepted by