HomeMy WebLinkAboutITG Communications - CO - Waterloo Broadband Change Order Request - 10.7.24Change Order Request
Change Order
CITY OF ENTRUST
kJ �TERLOO SOLUTIONS GROUP
Communit
11/esign/Engineering
fO Mage//an
y Opportunity
Will Be Subject To The Withholdings and Release Set Forth In The Contract
Sections 6.2(f)(i) and (ii)
(Change Order Cost: $25,937.04
Retainage No
Change Order Name: CR-2024-0015
Construction Contractor Name (Attn) Entrust
-
9/17/2024
Magellan Project Manager: Michael Regan
PM Broadband Implementation
Requested By:
Construction Contractor
Client/Owner (Attn) City of Waterloo/Waterloo Fiber
Magellan Sign -Off
Warren Lyon
Director — Project Management Office (PMO)
Description of Change (include location)
The following Change Order has been created to account for the labor and material to replace a cabinet, fiber and splice
case damaged by a hit and run accident.
Reason for Change
A hit and run accident occurred along Dysart Rd (LCP 036/Task Order 2) on the evening of 8/30/24, hitting a fiber
cabinet and pulling the fiber along with it. This repair work needed to be addressed right away since the contractor, ITG,
was planning on turning this task order over to the City of Waterloo & Waterloo Fiber in the month of September.
Entrust received written email approval on 9/5/24 from Randy Bennett to proceed with the repair work.
Material Submittals/ Specifications
Repair costs has been provided by ITG, labor & material pricing came from original BOM pricing which was approved
by City of Waterloo & Waterloo Fiber
Location
Work Order #
Itemized Breakdown of Work
Description Qua . -
Patch Panels and Cabinets
Install Pad mounted FDH 288 Splitter Cabinet* Site prep and Prefab 1
Vault
$ 3,700.00
$ 3,700.00
Splicing
Install New Splice Case & Prep Cable FOSC 450D Splice Case 4
$ 200.00
$ 800.00
Underground -Buried
Installation, Underground Fiber Cable 144 CT - Including Slack (Micro 464
fiber must be blown in)
$ 1.20
$ 556.50
Splicing
Splicing, Fusion, Single Fiber 524
$ 25.00
$ 13,100.00
CR Labor Subtotal
$ 18,156.80
Materi
Patch Panels and Cabinets
288F Pad mounted FDH Splitter Cabinet
1
$ 5,480.16
$ 5,460.16
Closures FOSC 450 D Closure
4
$ 336.06
$ 1,344.24
Fiber 144 CT Micro Fiber Cable
464
$ 2.06
$ 955.84
CR Materials Subtotal
*** TOTAL CR COST
$
25,937.04
Approvals
Magellan Sign -Off
Print Name / Title:
Signature:
Date:
Gene Allred
Director of Construction
09/17/2024
Contractor Manager (not needed for design change requests)
Print Name / Title:
Signature:
Date:
Client/Owner (Attn)
Charles Smith
Regional Manager
Print Name / Title:
Signature:
Date:
9/17/2024
uentin Hart
62uertEuz rE
10/7/2024
DIGITALLY
SIGNED
**End**