Loading...
HomeMy WebLinkAboutMidAmerican Gas Easement Agreement NE INdustrial - 10.7.24MidArnerican ENERGY OBSESSIVELY, KELENTLESSLY AT YOUR SERVICE* 9/13/2024 City of Waterloo Attn: Noel Anderson Noel.Anderson@waterloo-ia.org MidAmerican Energy Attn: Amy M Adams - DMCC PO Box 657 Des Moines, IA 50306 Reference: New gas main to serve future connection(s) along GT Dr., Waterloo, IA- MX: 4071158 Dear Noel: The enclosed drawing shows MidArnerican Energy Company's proposal for providing gas main at the above location. The applicant charge for this installation is $11,785.67 which is a refundable Advance for Construction. This proposal is valid for 90 days and if MidAmerican Energy Company construction has not commenced within 12 months it may be voided. MidAmerican Energy Company Proposes To: 1. Furnish and install gas main of the appropriate size to serve the load. The Applicant Agrees To: 1. Provide without cost to MidAmerican Energy Company such easements as are necessary for the installation and maintenance of MidArnerican Energy Company's facilities on private property. 2. Pursuant to MidArnerican's tariff, the Applicant is required to pay actual permit fees. Permit fees may not be offset by Revenue Credit and are to be paid regardless of whether the applicant is required to pay a Refundable Advance or a Nonrefundable Contribution. 3. Grade the service route to within four (4) inches of final grade and clear the route of construction materials, obstructions, trees, etc. Extra costs for additional excavation beyond normal trenching operations due to unforeseen underground obstructions shall be paid by the applicant. 4. Locate all underground facilities such as stonn and sanitary sewer, septic lines, underground electric cable, comrmnication cable, irrigation systems and water lines that are not located by members of One Call. MidArnerican Energy Company assumes no liability for private facilities not located. MidAmerican ENERGY OBSESSIVELY, KELENTLESSLY AT YOUR SERVICE* MidAmerican Energy Attn: Amy M Adams - DMCC PO Box 657 Des Moines, IA 50306 5. It is specifically understood and agreed that the Applicant must certify that all of the above requirements shall be met or this Agreements shall be deemed null and void. The Advance for Construction is subject to refund based on the following terms and conditions if additional customer(s) are connected: 1. Advance for construction payment shall not accrue interest. 2. Advance payment shall be subject to refired to the Applicant for a ten-year period from the date of the original advance payment. 3. Refunds shall be equal to three times estimated base revenue for each new customer connecting to the distribution extension; to the extent the base revenue exceeds the additional distribution costs incurred by MidAmerican Energy Company to serve individual customers. 4. The refund shall be equal to three times one year's actual use, less fuel expense costs. 5. Refunds will be made on the anniversary date of this Proposal. 6. MidAmerican Energy Company will make no refunds for revenue received after ten (10) years from the date of this Proposal. 7. At no time shall the total of refunds exceed the original Advance for Construction payment. 8. MidAmerican Energy Company will make no refunds for customers served from a further extension of the above described gas main extension. If MidAmerican Energy Company is required to start construction of gas facilities during the winter season, the work will be subject to an additional winter construction charge. It is MidAmerican Energy Company's responsibility to see that the various utility companies' facilities are located before our construction. This includes electric, natural gas, telephone, cable television, and generally water. It is the owner's responsibility to see that any privately owned systems such as water systems, irrigation systems, drain pipes, septic lines and underground wiring are located before MidAmerican Energy Company's construction. MidAmerican Energy Company assumes no liability for private facilities that are not located. MidAmei'iean ENERGY Ob5ESSIVUUY, KLLENrLESSLYAT SERVICEr MidAmerican Energy Attn: Amy IV Adams - DivICC PO Box 657 Des Moines, IA 50306 MidAmerican Energy Company installed facilities will retrain the property of MiclAmerican Energy Company. If this proposal is satisfactory, please sign and return n one 1 copy of this letter to me. MidAmerican Energy Company will. release the work for scheduling upon receipt of a signed proposal, site readiness, easement, atxl payment of $11,785.67. Please keep us advised of your plans so we may schedule our construction work at the appropriate time. If you have any questions please call me at (515) 252-6701. Sincerely, MidAmerican merican Energy Company Amy III Adams Lead Customer Project Coordinator Enclosures 62i-terdta. Accepted �` ; Date Service Required: 10/7/2024 DIGITALLY SIGNED GT DR - WATERLOO rOJ CO • 1/4 • 1 I MIDAMERICAN ERCYCOMiPANY Crew HQ• WAT r 1 1 1 I 1 f 1 1 1 1 1 1• I I I 1 I 1 • 1 1 2' PL 70# (70#1 1 I 1 1 1 1 s I 1 1 1 1 1 1 1 1 1 L 0 0) CV .� • tr CO Install 2" PL main for new commercial property. Install Pup with 211 PL Cap, Test Box & 1-5# Anode. L-ISM ------------- Cust: Addr. NEAR 2255 GT DR City: WATERLOO X = 1966919 Y = 916530 r GT DR W M S_R E V:4071158-1 Date: 9/11/2024 Scale: 1 IN = X FT Designer: MOLLY CLAIRE BROUWER Job Desc: CITY OF WATERLOO DISCLAIMER OF LIABILITY NOTE. This drawing reflects facil.bes in place al the time of its preparation and is subject to change al any time. For current facility information, please contact MidAmercan Energy Company Furthef, MidAmerican Energy Company disclaims all liability and responsibility for ail claims and damages including but not limited to. personal injury, death and property damage. resulting from any authorized or unauthorized use ofor reliance upon, the drawing for an1EurEose.