Dear Noel:
The enclosed drawing shows MidArnerican Energy Company's proposal for providing gas main
at the above location. The applicant charge for this installation is $11,785.67 which is a
refundable Advance for Construction. This proposal is valid for 90 days and if MidAmerican
Energy Company construction has not commenced within 12 months it may be voided.
MidAmerican Energy Company Proposes To:
1. Furnish and install gas main of the appropriate size to serve the load.
The Applicant Agrees To:
1. Provide without cost to MidAmerican Energy Company such easements as are necessary
for the installation and maintenance of MidArnerican Energy Company's facilities on
private property.
2. Pursuant to MidArnerican's tariff, the Applicant is required to pay actual permit fees.
Permit fees may not be offset by Revenue Credit and are to be paid regardless of whether
the applicant is required to pay a Refundable Advance or a Nonrefundable Contribution.
3. Grade the service route to within four (4) inches of final grade and clear the route of
construction materials, obstructions, trees, etc. Extra costs for additional excavation
beyond normal trenching operations due to unforeseen underground obstructions shall be
paid by the applicant.
4. Locate all underground facilities such as stonn and sanitary sewer, septic lines,
underground electric cable, comrmnication cable, irrigation systems and water lines that
are not located by members of One Call. MidArnerican Energy Company assumes no
liability for private facilities not located.
MidAmerican
ENERGY
OBSESSIVELY, KELENTLESSLY AT YOUR SERVICE*
MidAmerican Energy
Attn: Amy M Adams - DMCC
PO Box 657
Des Moines, IA 50306
5. It is specifically understood and agreed that the Applicant must certify that all of the
above requirements shall be met or this Agreements shall be deemed null and void.
The Advance for Construction is subject to refund based on the following terms and conditions if
additional customer(s) are connected:
1. Advance for construction payment shall not accrue interest.
2. Advance payment shall be subject to refired to the Applicant for a ten-year period from
the date of the original advance payment.
3. Refunds shall be equal to three times estimated base revenue for each new customer
connecting to the distribution extension; to the extent the base revenue exceeds the
additional distribution costs incurred by MidAmerican Energy Company to serve
individual customers.
4. The refund shall be equal to three times one year's actual use, less fuel expense costs.
5. Refunds will be made on the anniversary date of this Proposal.
6. MidAmerican Energy Company will make no refunds for revenue received after ten (10)
years from the date of this Proposal.
7. At no time shall the total of refunds exceed the original Advance for Construction
payment.
8. MidAmerican Energy Company will make no refunds for customers served from a
further extension of the above described gas main extension.
If MidAmerican Energy Company is required to start construction of gas facilities during the
winter season, the work will be subject to an additional winter construction charge.
It is MidAmerican Energy Company's responsibility to see that the various utility companies'
facilities are located before our construction. This includes electric, natural gas, telephone, cable
television, and generally water. It is the owner's responsibility to see that any privately owned
systems such as water systems, irrigation systems, drain pipes, septic lines and underground
wiring are located before MidAmerican Energy Company's construction. MidAmerican Energy
Company assumes no liability for private facilities that are not located.
MidAmei'iean
ENERGY
Ob5ESSIVUUY, KLLENrLESSLYAT SERVICEr
MidAmerican Energy
Attn: Amy IV Adams - DivICC
PO Box 657
Des Moines, IA 50306
MidAmerican Energy Company installed facilities will retrain the property of MiclAmerican
Energy Company.
If this proposal is satisfactory, please sign and return n one 1 copy of this letter to me.
MidAmerican Energy Company will. release the work for scheduling upon receipt of a signed
proposal, site readiness, easement, atxl payment of $11,785.67. Please keep us advised of your
plans so we may schedule our construction work at the appropriate time. If you have any
questions please call me at (515) 252-6701.
Sincerely,
MidAmerican merican Energy Company
Amy III Adams
Lead Customer Project Coordinator
Enclosures
62i-terdta.
Accepted �` ;
Date Service Required: 10/7/2024
DIGITALLY
SIGNED
GT DR - WATERLOO
rOJ
CO
•
1/4
•
1
I
MIDAMERICAN
ERCYCOMiPANY
Crew HQ• WAT
r
1
1
1
I
1
f
1
1
1
1
1
1•
I
I
I
1
I
1
•
1
1
2' PL 70# (70#1
1
I
1
1
1
1
s
I
1
1
1
1
1
1
1
1
1
L
0
0)
CV
.�
•
tr CO
Install 2" PL main for new commercial property.
Install Pup with 211 PL Cap, Test Box & 1-5# Anode.
L-ISM -------------
Cust:
Addr. NEAR 2255 GT DR
City: WATERLOO
X = 1966919 Y = 916530
r
GT DR
W M S_R E V:4071158-1
Date: 9/11/2024
Scale: 1 IN = X FT
Designer: MOLLY CLAIRE BROUWER
Job Desc: CITY OF WATERLOO
DISCLAIMER OF LIABILITY
NOTE. This drawing reflects facil.bes in place al the time of its preparation and is subject to change al any time. For current facility information, please contact MidAmercan Energy Company Furthef, MidAmerican Energy Company
disclaims all liability and responsibility for ail claims and damages including but not limited to. personal injury, death and property damage. resulting from any authorized or unauthorized use ofor reliance upon, the drawing
for an1EurEose.