Loading...
HomeMy WebLinkAboutWoodruff Construction CO #8 FY23 Gates Park, Cont. No. 1076 - 10.21.2024CHANGE ORDER NO. 8 Owner City of Waterloo Date: 9/23/2024 Project Gates Park Improvements Project Owner's Contract No. 1076 Contractor: Woodruff Construction Date of Contact Start 5/30/2023 Contract Amount: $ 9,362,172.81 You are directed to make the following changes in the Contract Documents. Description: 8-1 Lower Gates Electrical Feeder Relocate $ 5,265.70 /LS TOTAL ADDITIONS x 1 UNITS $ 5,265.70 $ 5,265.70 Reason for Change Order 8-1 The existing electrical feeder for the Lower Gates restroom shelter is too shallow for the proposed water detention area. The existing feeder was also directed buried. The new feeder will be encased in PVC conduit and placed under the detention area. CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 9,362,172.81 Original Working Days 2401 2401 Previous C.O.s (ADD/DEDUCT) $ (1,172,730.28) This C.O. (ADD/DEDUCT) $ 5,265.70 Revised Working Days: Contract Price with all approved Change Orders: $ 8,194,708.23 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: /�( BY: ui.� / (/ e 9-tar DIGITALLY SIGNED 10/21/2024 Owner (Authorized Si •:ture) Date ACCEPTED: 9/24/24 BY: PTED: BY: AECOM or (Authorized Signature) Date 9/26/24 Date AECOM 60672429 8 Project No. C.O. No. WOODRUFF CONSTRUCTION 100% Employee Owned Anthony Hemann AECOM 501 Sycamore St. #222 Waterloo, IA 50703 RE: FY 2023 Gates Park Improvements 820 E Donald St. Waterloo, IA 50703 SUBJ: Potential Change Order #039 - Lower Gates Electrical Feeder Relocate Dear Mr. Hemann, 1717 Falls Avenue I Waterloo, IA 50701 Ph: [319] 233-3349 Fax: [319] 233-3369 08/23/24 Per onsite observations, it has been discovered that the existing electrical feeder for the south restroom is too shallow for the installation of a water detention area. Rerouting of the electrical feeder will be required to place feeder under detention area. Updated plumbing & mechanical (quote attached) = $ 4,787.00 GC Markup (10%) = $ 478.70 Total = $ 5,265.70 Your written approval is required by (8/30/2024) When this potential change order is signed by the Owner and a copy is returned to the contractor, approval of change(s) is effective IMMEDIATELY and we will proceed with the change(s) described above. Approved changes will be included in a future contract change order. If you require additional clarification, please contact me. Thank you for your prompt response. Sincerely, WOODRUFF CONSTRUCTION, INC. Will McAllister Project Manager cc: File Owner Approval / Date Architect Approval / Date rECT r lC9 lll ca 1127 Lincoln St. PO Box 967 CedarFalls,IA50613 0: 319.277.0415 C: 319.269.3844 E: bdevries@k-welectric.com W: www.k-welectric.com Date: August 23, 2024 Company: Woodruff Construction Attention: Will RE: Gate Park Will, It has been discovered that the existing electrical feeder for the south restroom is too shallow for the installation of the retention pond. We propose to relocate the feeder for $4,787.00 If you have any questions, please call. Brian DeVries Estimator/Project Manager