Loading...
HomeMy WebLinkAboutWRH, Inc. - CO #4 Titus Lift Station, Cont. No. 975 - 10.21.2024AECOM October 2, 2024 Mr. Jesse Gaherty Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa, 50702 Subject: Titus Lift Station and Force Main Change Order No. 4 City of Waterloo, Iowa City Contract No. 975 AECOM #60726355 Dear Mr. Gaherty: AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Attached is Change Order No. 4 for the Titus Lift Station and Force Main project submitted by WRH, Inc. This change order is to compensate WRH, Inc for dewatering work and equipment over and above what was anticipated at the time of the bid. The months of May and June received considerably more than normal precipitation. That excess precipitation required more dewatering pumps and more labor hours to drawdown the groundwater at the lift station site to install the wet well than was anticipated in December 2023 at the time of the bid. AECOM and City Staff recommends the City approves Change Order No. 4 for the addition of $16,250.00 and a revised total contract cost of $6,279,720.88. The increase is 1.55% of the original contract including all change orders. ``\`�1 011111111111 u,,,„ o.R�pESSfOH4`,, z :CHRISTOPHER G.'. 63 W QELKERS . Z 22053 ; m ''%end '''n/ 0 W N ,,,\'' I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the state of Iowa. 09/25/2024 CHRISTOPHER G. OELKERS, P.E. Date License No. 22053 My license renewal date is December 31, 2025. Pages or sheets covered by this seal: All Pages Enclosure: Change Order No. 4 dated 10/02/2024 L:\DCS\Projects\WTR\60726355_Titus_LS_and_FM_CRS\600_Construction_Support\670_Change-Orders\CO 4\975 TITUS - CO 04 LTR.docx CHANGE ORDER 4 ACOM Owner City of Waterloo Project TITUS LIFT STATION AND FORCE MAIN Date: October 2, 2024 Owner's Contract No. 975 Contractor: WRH, INC. SRF NON-SRF Date of Contact Start January 2, 2024 Contract Amount: $6,184,087.00 $ You are directed to make the following changes in the Contract Documents. Description: 50 CO NO. 4 - CAR NO. 9 - DEWATERING WRH CR 9 16,250.00 TOTAL 16,250.00 ADDITION Reason for Change Order Change Order Request No. 9 is This change order is to compensate WRH, Inc for dewatering work and equipment over and above what was anticipated at the time of the bid. The months of May and June received considerably more than normal precipitation. That excess precipitation required more dewatering pumps and more labor hours to drawdown the groundwater at the lift station site to install the wet well than was anticipated in December 2023 at the time of the bid. CONTRACT PRICE SRF NON- SRF Original: $ 6,184,087.00 $ 6,184,087.00 $ - Previous C.O.s $ 79,383.88 $ 79,383.88 $ - This C.O. $ 16,250.00 $ 16,250.00 $ - Contract Price with all approved $ 6,279,720.88 $ 6,279,720.88 $ - Total Change Orders: $ 95,633.88 1.55% Total CO % TOTAL $ 6,279,720.88 Original Completion Date: Revised Completion Date: CONTRACT TIME To Substantial To Final Completion Completion 11/30/2024 12/31/2024 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROV• / Lam/ 0 BY: -,_LY SIGNED 10/21 /2024 Owner (Authorized Signature) Date ACCEPTED: BY: � < J October 2, 2024 Contractor (Authorized Signature) Date ACCEPTED: BY: October 2, 2024 AECOM Date AECOM 60726355 I 4 Project No. C.O. No.