Loading...
HomeMy WebLinkAboutCedar Valley Corporation - CO #5, Cont. No. 1095 - 11.18.2024CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 5 PROJECT: FY 2024 BROADWAY ST RECONSTRUCTION PROTECT, CONTRACT NO. 1095 Date Prepared: 11/1/2024 AMOUNT: $ 59,100.00 TO: CEDAR VALLEY CORPORATION, Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated 03/18/2024. A. Description of changes to be made or extra work to be done: a. Contractor to supply flaggers required for work in Railroad ROW. b. Contractor to be paid for finishing project before required completion date. c. Contractor to be deducted for area of paving outside of smoothness specification. B. Reason for ordering change or extra work: a. Flaggers to be required when working in Railroad ROW. b. Incentive paid for contractor finishing project before required completion date. c. Deduction for area of paving outside of smoothness specification. C. Settlement for the cost of work to be made as follows: a. 5001- RAIROAD FLAGGING - LS/$9,475 -1 @ $9,475 = $9,475 b. 5002 - INCENTIVE - LS/$50,000 -1 @ $50,000 = $50,000 c. 5003 - PAVEMENT SMOOTHNESS DEDUCTION - LS/-$375 -1 @ -$375 = - $375 Total Net Increase $59,100.00 CITY OF WATERLOO BY: 62C�/Zi(a2 i'� 1 ` /2024 e•Di44P--V�-1�� C0 . , Li, (- Mayor Date CONTRACTOR l ate ATTEST: Kelley Felchle City Clerk 1-1' SIGNED 11/18/2024 Date PRINTED NAME: GZ.tivtr TITLE: IA>r-t iA/ A,hc;Eft- APPROVED: // .5/o?� City Engineer ineer Date