October 22, 2024
City of Waterloo
Attn: Jamie Knutson
JAMIE. KNUT S ON@WATERLOO-IA.ORG
Dear Jamie:
MidAmerican Energy
Attn: Amy M Adams - DMCC
PO Box 657
Des Moines, IA 50306
We are pleased to submit the Electric Distribution System Proposal for future
development(s) located along Warp Dr., and Hyper Dr., Waterloo, IA; MX 4089778
Please sign and return the proposal when you are ready to commit to the work. You may
withhold payment until 30 days before MidAmerican Energy Company is ready to
schedule the work. Meanwhile, please keep me informed of your schedule. After we have
received your payment, we will sign and return a copy of the proposal for your records.
If you have questions, please call me at (515) 252-6701.
Sincerely,
MidAmerican Energy Company
A1119A-Mcom
Amy M Adams
Lead Customer Project Coordinator
Enclosures
MidAmerican
ENERGY
OBSESSIVELY, HE LLN 1 LESSLY AT YOUR SERVICE
MidAmerican Energy
Attn: Amy M Adams - DMCC
PO Box 657
Des Moines, IA 50306
MidAmerican Energy Company
ELECTRIC DISTRIBUTION SYSTEM PROPOSAL
MX: 4089778
MidAmerican Energy Company, an Iowa Corporation, its successors and assigns and the
City of Waterloo ("Applicant"), agree as follows:
1. Applicant has platted in the City of Waterloo, Iowa and has divided the same into
numbered lots for building purposes as shown in the plat attached hereto.
2. MidAmerican Energy Company furnishes electric service in Waterloo, Iowa, and
is willing to provide electric service to lots along Warp Dr., and Hyper Dr., and to
install underground electric distribution facilities upon the terms and conditions
set forth in this proposal. Electric distribution is defined as that utility plant
normally operated at fewer than 15,000 volts, constructed on public right-of-way
or easements, and normally intended to provide service to more than one
customer. Service conductors installed between the distribution system and the
customer's point of attachment are not provided for in this proposal. This proposal
is valid for 90 days and if MidAmerican Energy Company construction has not
commenced within 12 months it may be voided.
3. MidAmerican Energy Company agrees to engage in construction in consideration
of the receipt of $358,857.04 of which $358,857.04 is a Refundable Advance.
MidAmerican Energy Company agrees to construct the necessary underground
electric distribution facilities as set forth below:
a. Install primary and secondary distribution conductors to serve lots within
said development.
b. Install transformers as required to serve the individual lots. Transformers
may be installed at the time of cable installation or, at MidAmerican
Energy Company's option, be installed when individual building
construction is started. Costs are included in paragraph 3 above.
c. MidAmerican Energy Company will not provide streetlights under the
terms of this proposal.
4. Pursuant to MidAmerican Energy Company's electric tariff, Refundable
Advances are paid by the customer prior to construction, and may be refunded in
whole or in part based upon the following terms and conditions. Nonrefundable
Contributions, which cover expenses such as excess facilities and installation of
temporary facilities, are not subject to any refund. If the estimated cost of
construction is over $100,000, Applicant is required by tariff to pay actual costs
upon completion of the work, which could result in an additional charge or a
refund to the Applicant.
' MidAmerican
ENERGY
OBSESSIVELY, HE LE N 1 LE SSLy AY YOUR SERVICE'.
MidAmerican Energy
Attn: Amy M Adams - DMCC
PO Box 657
Des Moines, IA 50306
a. The Refundable Advance is equal to the amount identified in section 3.
b. Refundable Advance shall be subject to refund to the Applicant for a ten-
year period from the date of the original Refundable Advance payment.
c. Refundable Advance shall not accrue interest.
d. Refunds shall be made annually on or about the anniversary date of the
original advance payment.
e. Annual refunds will be based on the number of new customers at the
identified lots that have directly connected to the electric distribution
expansion in the prior year. The amount refunded will be equal to the
estimated three-year base revenue from those customers less any
additional costs to extend service to them. Base revenue is equal to
estimated annual revenue, less fuel expenses and energy efficiency cost
recovery charges, based on revenue received from similarly situated
customers. Base revenue amounts to be applied to new customers are re -
estimated each year using the most current information available and may
adjust upward or downward depending on the circumstances.
f. No refunds shall be made for revenue received after ten (10) years from
the date of the original advance payment.
g.
At no time shall the total of refunds exceed the original Refundable
Advance payment.
h. No refunds shall be made for customers served from a further extension of
the above described electric line extension. Distribution System
Expansions without end -user attachments shall not be eligible for refunds
unless the following circumstances are met: If a Distribution System
Expansion connected during the ten-year period off of an already existing
Distribution System Expansion, the Revenue Credit shall be applied to the
new Expansion first. Any Revenue Credit remaining shall be applied to
the connected existing Expansions provided that they have not received a
full reimbursements for its Refundable Advance and are within the ten-
year attachment period. The Revenue Credit will continue to apply to
connected existing Expansions until the Revenue Credit is either
exhausted, the ten-year attachment period has closed, or all Refundable
Advances have been reimbursed in full. Total refunds for any Expansion
shall not exceed the original Refundable Advance.
' MidAmerican
ENERGY
OBSESSIVELY, HE LLN 1 LESSLY AT YOUR SrtRVICI➢.
MidAmerican Energy
Attn: Amy M Adams - DMCC
PO Box 657
Des Moines, IA 50306
5. If the installation is underground and MidAmerican Energy Company is caused
by Applicant to work during winter construction season, Applicant agrees to pay
the additional costs as a Refundable Advance for all required trenching, bell
holes, pedestals and transformer basements. Additional cost incurred for extra
work by such conditions as obstructions or changes in grade shall be charged to
the developer or applicant.
6. Pursuant to MidAmerican's tariff, the Applicant is required to pay actual permit
fees. Permit fees may not be offset by Revenue Credit and are to be paid
regardless of whether the applicant is required to pay a Refundable Advance or a
Nonrefundable Contribution.
7. MidAmerican Energy Company, at its option, may install aerial electric facilities
to provide temporary electric service to any lot in the development pending the
completion of final grading or other permanent improvements to the premises.
When such temporary electric service is furnished, the expense of installation and
removal, less salvage, shall be paid by the applicant.
8. Nothing herein contained shall obligate MidAmerican Energy Company to extend
its electric facilities or provide electric service to the premises or property outside
the platted limits of the development.
9. Applicant shall:
a. Provide MidAmerican Energy Company with check indicated in paragraph
3. Such payment amount may be subject to change if not submitted to
MidAmerican Energy Company together with this signed Proposal by
January 17, 2025
b. Grade the underground primary cable route to within four (4) inches of
final grade and clear the route of construction materials, obstructions, etc.
Extra costs for additional excavation beyond normal trenching operations
due to unforeseen underground obstructions shall be paid by Applicant.
c. Stake all lot corners.
d. Provide, without cost to MidAmerican Energy Company, such easements
as are necessary and incidental to such installation and use of
MidAmerican Energy Company facilities on private property within the
development. If a 3rd party easement is required any cost associated in
obtaining the easement will be paid by the Applicant. Applicant will
stake these easements.
' MidAmerican
ENERGY
OBSESSIVELY, HELLN 1 LESSLY AT YOUR SERVICF.
MidAmerican Energy
Attn: Amy M Adams - DMCC
PO Box 657
Des Moines, IA 50306
e. Be responsible for locating and marking all privately owned systems such
as water services, culverts, irrigation systems, drainpipes, septic lines, and
underground wiring prior to MidAmerican Energy Company's
construction.
f. Provide three (3) copies of committed plat showing all platted easements.
g.
Be responsible for complying with all aspects of compliance as required by
any local, state, or federal permit or plan associated with storm water
pollution prevention or erosion control. It is specifically understood and
agreed that MidAmerican Energy Company is providing the service
requested by the Applicant solely for the Applicant. MidAmerican Energy
Company will not become or agree to become a co-permittee or operator
for the purpose of applicants' compliance with any local, state or federal
permit or plan associated with storm water pollution prevention or erosion
control.
h. Agree to indemnify and hold MidAmerican Energy harmless from any and
all damages that may result from the non -tamping of backfill operations
conducted by MidAmerican Energy. In case any actions brought against
MidAmerican Energy or any of its agents or employees, relative to such
backfill operations, the applicant shall assume full responsibility for the
defense thereof. Upon failure to do so on proper notice, MidAmerican
Energy reserves the right to defend such action and charge all costs to the
applicant, provided, however, that nothing shall be construed as an
assumption of liability by the Applicant for damages and claims attributable
to MidAmerican Energy's negligence.
10. Within the area described above, MidAmerican Energy Company will render its
standard electric service to customers eligible for such service, at their request, at
rates from time to time in effect, subject to the terms of MidAmerican Energy
Company's electric service rules and regulations; and statutes, laws, and
ordinances; and any rules or regulations promulgated by the state or federal
regulatory authorities.
It is specifically understood and agreed that any distribution systems or other facilities
constructed or installed by MidAmerican Energy Company under terms of this Proposal
shall remain the sole property of MidAmerican Energy Company and MidAmerican
Energy Company shall determine, as its own judgment indicates, the manner and method
of utilization thereof and to extend the same or connect other facilities thereto and serve
other customers there from as it shall see fit, subject only to such obligations as
MidAmerican Energy Company shall have assumed in this Proposal; and no other person
shall have any right, title, interest, or claim, in or to the said distribution system or other
facilities by virtue of any provision of this Proposal.
MidAmerican
ENERGY
OBSESSIVELY, HE LE N 1 LE SSLY AT YOUR SERVICE.
Proposed this 17th day of October, 2024
MIDAMERICAN ENERGY COMPANY
BY:
TITLE:
APPLICANT:
TITLE: Mayor
MidAmerican Energy
Attn: Amy M Adams - DMCC
PO Box 657
Des Moines, IA 50306
LEVERSEE RD
0018968193
0018968192
05F05699
65T
93-1-1008
i0 AL PARA
Gp
08/12000® 15792
coo EN
11
155 a�ftl
04616
/0 AL PARA
IYIIDANIERICAN
ENERCYCOMPANY
8968188 0021487964
WARP DR
65T
05F05614 479204
0018968186
25
0018968183
o-
93-1-1008 1 4.00 - CONTINUOUS POLYETHELYNE
1/0 AL PARA
Pull out existing 3phs primary
from between txf and PE
93-1-1008
05T04577
75
coo
n �0
Set fused cab.net - PFM300
PFC350 - 05FE0028
15E Fuse - 05F05968
Fault Ind - FICO23
002.099577
05FE0028
0021516667
05PE0548
93-1-1008
MAP- 1
Set single phs 25
kva txf - 05T04794
adjacent to existing
Fused PE - 05FE0028
968 05T047
A PHS 2 KVA
120/24
Crew HQ:WAT
Cust: CITY OF WATERLOO - WARP
Addr: 4102 LEVERSEE RD
City: WATERLOO
X = #Mafframe1 ` 13(#M0Ufvt et6
WM S_R EV:4089778-1
Date: 9/17/2024
Scale: 1 IN = X FT
DO1 Mi9 ekler:SHANE MICHAEL DAVIS
Job Desc: CITY OF WATERLOO - WARP
DISCLAIMER OF LIABILITY
NOTE: This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, please contact MidAmerican Energy Company.
Further, MidAmerican Energy Company disclaims all liability and responsibility for all claims and damages including but not limited to, personal injury. death and property damage.
resulting from any authorized or unauthorized use of. or reliance upon, this drawing for any purpose.
MIDANIERICAN
ENERCYCOMPANY
Crew HQ:WAT
Gust: CITY OF WATERLOO - WARP
Addr: 4102 LEVERSEE RD
City: WATERLOO
Set PE - PEM300
PEC350 - 05PE0605
Fault Ind - FICO23
Arresters - UMC212
X = #MabFrame1113 MaU edits
D�OWM S_R EV:4089778-1
Date: 9/17/2024
Scale: 1 IN = X FT
_ Mi9§i ekilft er:SHANE MICHAEL DAVIS
Job Desc: CITY OF WATERLOO - WARP
Set PE - PEM300
PEC350 - 05PE0606
Fault Ind - FICO23
Arresters - UMC212
Set PE - PEM300
PEC350 - 05PE0604
Fault Ind - FICO23
Normal OPEN in PE
93-1-1008
MAP-2
DISCLAIMER OF LIABILITY
NOTE: This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, please contact MidAmerican Energy Company.
Further, MidAmerican Energy Company disclaims all liability and responsibility for all claims and damages including but not limited to, personal injury. death and property damage.
resulting from any authorized or unauthorized use of. or reliance upon, this drawing for any purpose.
Set PE - PEM300
PEC350 - 05PE0598
Fault Ind - FICO23
05PE0598
PE
05PE0603 PE
Set PE - PEM300
PEC350 - 05PE0606
Fault Ind - FICO23
Set PE - PEM300
PEC350 - 05PE0599
Fault Ind - FICO23
Normal OPEN in PE
HYPER DR
® El
05PE0599
05T04793
A PHS 25 KVA
120/240
l0
0
PE
Set PE - PEM300
PEC350 - 05PE0600
Fault Ind - FICO23
Arresters - UMC212
05PE0600
Set single phs 25
kva txf - 05T04793
adjacent to
PE - 05PE0548
93-1-1008
MAP - 3
MIDANIERICAN
ENERCYCOMPANY
Crew HQ:WAT
Cust: CITY OF WATERLOO - WARP
Addr: 4102 LEVERSEE RD
City: WATERLOO
X=#MariFrame1' DO X1 Missinq#
WM S_R EV:4089778-1
Date: 9/17/2024
Scale: 1 IN = X FT
Designer:SHANE MICHAEL DAVIS
Job Desc: CITY OF WATERLOO - WARP
DISCLAIMER OF LIABILITY
NOTE: This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, please contact MidAmerican Energy Company.
Further, MidAmerican Energy Company disclaims all liability and responsibility for all claims and damages including but not limited to, personal injury. death and property damage.
resulting from any authorized or unauthorized use of. or reliance upon, this drawing for any purpose.
OsrCOCO1
I
t
I
I
I
I
I
WARP DR
APE
I
I o.i
a
I M2
IPT
I
I
I
I
I
I
I
O
5PE0602
93-1-1008
MAP-4
19
O W
1-o
73 > coo
P
Set PE - PEM300
PEC350 - 05PE0601
Fault Ind FICO23
Set PE - PEM300
PEC350 - 05PE0602
Fault Ind - FICO23
>�
L
38
MIDAMERILAN
E N E ROY COM PA NY
Cust: CITY OF WATERLOO - WARP
Addr: 4102 LEVERSEE RD
At
WMS_REV:4089778-1
Date: 9/17/2024
Scale: 1 IN = X FT
Designer:SHANE MICHAEL DAVIS
NOTE:
DISCLAIMER OF LIABILITY
This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, please contact MidAmerican Energy Company.
Further, MidAmerican Energy Company disclaims all liability and responsibility for all claims and damages including but not limited to, personal injury. death and property damage.
resulting from any authorized or unauthorized use of. or reliance upon, this drawing for any purpose.
Crew HQ:WAT
City: WATERLOO X = #MabFrame11BO X1 Missing#
Job Desc: CITY OF WATERLOO - WARP
O
N
N
LEVERSEE RD
00188097
479203
0021488026
1/0 AL PARA
r
0118968100
05F05703
100T
0018968091
25
%MIA ERICAN
ENEPCYCOMPANY
0018968081
93-1-1008
711
130
93-1-1008
MAP - 5
111 46 28
1l-1
CJ1517188
T 05T04617
500
93-1-1008
1/0 AL PARA
Set fused cabinet - PFM300
PFC350 - 05FE0029
15E Fuse - 05F05969
Fault Ind - FICO23
i
a
HYPER DR
05FE0029
05F0596
05 '4792
APH5KVA
120/24 .
Set single phs 25
kva txf - 05T04792
Crew HQ:WAT
Cust: CITY OF WATERLOO - WARP
Addr: 4102 LEVERSEE RD
City: WATERLOO
X=#Mar,Frame1' DO X1 Missing#
WM S_R EV:4089778-1
Date: 9/17/2024
Scale: 1 IN = X FT
Designer:SHANE MICHAEL DAVIS
Job Desc: CITY OF WATERLOO - WARP
DISCLAIMER OF LIABILITY
NOTE: This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, please contact MidAmerican Energy Company.
Further, MidAmerican Energy Company disclaims all liability and responsibility for all claims and damages including but not limited to, personal injury. death and property damage.
resulting from any authorized or unauthorized use of. or reliance upon, this drawing for any purpose.