Loading...
HomeMy WebLinkAboutBid Tabulation FY 2025 W.A.R.P. 4th Addition Project, Contract No. 1114 Bid Opening November 21, 2024 Engineering Estimate Base Div 1 + Div 2 = $3,663,001.80 Alternate A = $ 511,675.43 Total = $4,174,677.23 Bidder Bid Security Bid Amount Peterson Contractors, Base Bid $3,040,843.63 Inc. 5% Alt. A: $444,098.80 Reinbeck, IA Total: $3,484,942.43 Pirc-Tobin Base Bid $3,807,985.95 Alburnett, IA 5% Alt. A: $498,784.70 Total: $4,306,770.65 J.B. Holland Base Bid $3,537,967.76 Construction, Inc. 5% Alt. A: $527,298.97 Total: $4,065,293.73 Base Bid $3,757,935.78 Boomerang, Corp. 5% Alt. A: $487,905.88 Anamosa, IA Total: $4,245,841.66 Baker Enterprises, Inc. ° Base Bid $2,943,927.95 Waverly, IA 5% Alt. A: $444,840.95 Total: $3,388,768.90