Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Tabulation
FY 2025 W.A.R.P. 4th Addition Project, Contract No. 1114 Bid Opening November 21, 2024 Engineering Estimate Base Div 1 + Div 2 = $3,663,001.80 Alternate A = $ 511,675.43 Total = $4,174,677.23 Bidder Bid Security Bid Amount Peterson Contractors, Base Bid $3,040,843.63 Inc. 5% Alt. A: $444,098.80 Reinbeck, IA Total: $3,484,942.43 Pirc-Tobin Base Bid $3,807,985.95 Alburnett, IA 5% Alt. A: $498,784.70 Total: $4,306,770.65 J.B. Holland Base Bid $3,537,967.76 Construction, Inc. 5% Alt. A: $527,298.97 Total: $4,065,293.73 Base Bid $3,757,935.78 Boomerang, Corp. 5% Alt. A: $487,905.88 Anamosa, IA Total: $4,245,841.66 Baker Enterprises, Inc. ° Base Bid $2,943,927.95 Waverly, IA 5% Alt. A: $444,840.95 Total: $3,388,768.90